会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • Drainage device for walkway/roadway boundary
    • WALKWAY /道路边界排水装置
    • JP2008261165A
    • 2008-10-30
    • JP2007105391
    • 2007-04-13
    • Kawada Industries IncShigeyuki MatsuiSho Bond Constr Co Ltdショーボンド建設株式会社川田工業株式会社繁之 松井
    • MATSUI SHIGEYUKIKAIDO HIROSHIMIZUNO HIROSHITAKEMURA HIROSHI
    • E01C11/22
    • PROBLEM TO BE SOLVED: To prevent a steel member from being damaged by corrosion caused by allowing part of the rainwater flowing on the walkway to flow in a direction of downward floor slab concrete through a gap in a joint face between a back plate of a curbstone and a cross section of a walkway pavement layer without flowing over an upper surface of the curbstone.
      SOLUTION: A hollow curbstone-like drainage channel 1 is provided at a boundary section between the walkway 2 and the roadway 3. The joint face between the back plate 7 of the curbstone-like drainage channel 1 and the walkway pavement layer 2b, and the joint surface between a front plate 10 and a roadway pavement layer 3b are respectively provided with walkway-side rear water-intake openings 13a, 13b actively introducing the rainwater penetrating into the pavement layer into the drainage channel 1, and a roadway-side front water-intake opening 13c.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:为了防止钢构件受到腐蚀的损害,所述腐蚀是由于允许部分流经人行道的雨水沿着地板下方的混凝土的方向通过背板之间的接合面的间隙 路缘石的横截面和路面路面层的横截面,而不流过路缘石的上表面。 解决方案:在走道2和道路3之间的边界部分设置有一个中空的石碑状排水通道1.路缘石状排水通道1的后板7与人行道路面层2b之间的接合面 前面板10和道路路面层3b之间的接合面分别设置有通道侧后部吸水口13a,13b,主动地将渗入路面层的雨水引入排水通道1, 侧前进水口13c。 版权所有(C)2009,JPO&INPIT
    • 3. 发明专利
    • Formation method for shear reinforcement of concrete flat slab, road floor slab, and flat slab
    • 混凝土板,道路铺地板和平缝板的剪切加固形成方法
    • JP2013199740A
    • 2013-10-03
    • JP2012067036
    • 2012-03-23
    • Nippon Kaiser Kk日本カイザー株式会社Public Works Research Institute独立行政法人土木研究所
    • MATSUI SHIGEYUKIKONNO HISASHIMITAMURA HIROSHITOBISHIMA YASUFUMI
    • E01D19/12E04B5/43E04C5/06E04C5/18
    • PROBLEM TO BE SOLVED: To solve the problem that a conventional formation method for concrete flat slab is disadvantageous in manufacturing cost for reinforcement and trouble for arrangement of bars and further manufacturing costs are large with respect to a formation method for shear reinforcement of concrete flat slabs.SOLUTION: A formation method for shear reinforcement of a concrete flat slab formed by arranging upper-end bars, which are arranged longitudinally and laterally in a lattice shape and arranged at an upper position in a flat slab, and lower-end bars, which are arranged longitudinally and laterally in a lattice shape and arranged at a lower position in the flat slab, in a concrete form, and casting concrete in the concrete form includes: placing corrugated shearing reinforcement bars on the upper-end bars, side by side, in one direction from above or placing corrugated shearing reinforcement bars on the upper-end bars, side by side, in mutually orthogonal directions from above; and casting the concrete in the concrete form after fixing the shearing reinforcement bars to the upper-end bars by fixing means.
    • 要解决的问题:为了解决混凝土平板的常规成形方法对于钢筋的制造成本和棒的配置的麻烦以及制造成本的麻烦的问题,对于混凝土平板的剪切加固的形成方法而言是很大的 。解决方案:通过布置纵向和横向布置成格子状并布置在平板中的上部位置的上端杆和下端杆而形成的混凝土平板的剪切增强的形成方法,其中 纵向和横向布置成格子状,并且以混凝土形式布置在平板中的较低位置,混凝土形式的浇铸混凝土包括:将波纹剪切钢筋放置在上端杆上并排放置, 在上方的一个方向上,在相互正交的方向上并排放置在上端杆上的波纹剪切钢筋 以上; 并且通过固定装置将剪切钢筋固定到上端杆之后,以混凝土形式浇筑混凝土。
    • 5. 发明专利
    • Pavement structure and road paving method
    • 摊铺结构与路面摊铺方法
    • JP2006083578A
    • 2006-03-30
    • JP2004268488
    • 2004-09-15
    • Fukuda Road ConstructionMaeda Kosen Co LtdSho Bond Constr Co Ltdショーボンド建設株式会社前田工繊株式会社福田道路株式会社
    • MATSUI SHIGEYUKIHOKARI KOZOSHIMIZU TADAAKIIMAMURA KEIJITAKEMURA HIROSHIMIMURA TOMOOKAWAI HISASHI
    • E01C11/24
    • PROBLEM TO BE SOLVED: To provide a pavement structure which includes therein a conduit tube excellent in draining performance, and to provide a road paving method for constructing the structure without spending much labor or time. SOLUTION: The pavement is formed of a first impervious pavement layer T, a second impervious pavement layer L1, and a draining pavement layer L2 superposed on each other in this order from below, and the conduit tube 1 of a square cross section is embedded in the pavement layer along a road end structure S. Preferably, in the pavement structure, the conduit pipe is embedded in the second impervious pavement layer along the road end structure, and an upper surface of the conduit tube is flush with an upper surface of the second impervious pavement layer. Alternatively, in the pavement structure, the conduit pipe is embedded in the draining pavement layer along the road end structure, and the upper surface of the conduit tube is located at a height lower than an upper surface of the draining pavement layer. COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种路面结构,其中包括排水性能优异的导管,并且提供用于构造结构的道路铺路方法,而不花费太多的劳动力或时间。 解决方案:路面由下面依次叠置的第一不渗透路面层T,第二不透水路面层L1和排水路面层L2构成,管道1呈正方形截面 沿道路端部结构S嵌入路面层中。优选地,在路面结构中,导管被沿着路端结构嵌入在第二不透水路面层中,并且导管的上表面与上部 第二不透水路面层的表面。 或者,在路面结构中,导管沿着路端结构嵌入排水路面层,导管的上表面位于比排水路面层的上表面低的高度。 版权所有(C)2006,JPO&NCIPI
    • 6. 发明专利
    • Precast composite floor slab erection method
    • 预制复合地板修复方法
    • JP2012188814A
    • 2012-10-04
    • JP2011051087
    • 2011-03-09
    • Kawada Industries Inc川田工業株式会社
    • KAIDO HIROSHIMIZUNO HIROSHIHARA TAKASHIMATSUI SHIGEYUKI
    • E01D22/00E01D21/00
    • PROBLEM TO BE SOLVED: To provide an erection method of a precast composite floor slab, capable of closing a gap between an existing floor slab and a precast composite floor slab by rubber packing joint or a narrow infilling steel plate deck when replacing the existing floor slab of a bridge or a viaduct with the precast composite floor slab.SOLUTION: A precast composite floor slab 3 is erected by forming a joint mounting gap 5 with an existing floor slab 2 at a part where the existing floor slab 2 is partially removed, a joint is mounted on the joint mounting gap 5 and a vehicle travel possible state is attained. Then, the steps of partially removing the existing floor slab 2 adjacent to the precast composite floor slab 3, erecting a precast composite floor slab 4, forming the joint mounting gap 5 between the precast composite floor slab and the existing floor slab 2, forming an infilling concrete placing space 7 between the precast composite floor slabs, mounting a joint, placing infilling concrete and attaining the vehicle travel possible state, are repeated for two or more times.
    • 要解决的问题:提供一种预制复合地板的安装方法,其能够通过橡胶填充接头或窄填充钢板甲板来替换现有的楼板和预制复合地板之间的间隙 桥梁或高架桥的现有楼板与预制复合地板。

      解决方案:通过在现有的楼板2被部分去除的部分与现有的楼板2形成接合安装间隙5,在接头安装间隙5上安装有接头,从而架设预制复合地板3 可以达到车辆行驶状态。 然后,将与预制复合地板3相邻的现有的楼板2部分地移除,在预制复合地板和现有的楼板2之间形成预制复合地板4,形成预制复合地板4, 在预制复合地板之间填充混凝土放置空间7,安装接头,放置填充混凝土并获得车辆行驶可能状态,重复两次或更多次。 版权所有(C)2013,JPO&INPIT

    • 8. 发明专利
    • Joint structure of precast composite floor slab
    • 预制复合地板的接合结构
    • JP2011021362A
    • 2011-02-03
    • JP2009166416
    • 2009-07-15
    • Kawada Industries Inc川田工業株式会社
    • MATSUI SHIGEYUKIKAIDO HIROSHIMIZUNO HIROSHIYOSHIDA KENJI
    • E01D19/12
    • PROBLEM TO BE SOLVED: To provide a joint structure of precast composite floor slabs increasing connection strength of the joint structure and reducing cost of the joint structure. SOLUTION: This joint structure 100 of precast composite floor slabs including bottom steel plates 2a, 2b and reinforced concrete boards 4a, 4b having a plurality of reinforcing bars arranged like mesh and formed on the bottom steel plates to connect ends of the precast composite floor slabs is composed of a first structure constituted by letting end faces of the reinforcing bar concrete boards of the first and second precast composite floor slabs 1a, 1b oppose to each other across a clearance for placing concrete to fill it and positioning a plurality of end parts of the first and second reinforcing bars of the first and second precast composite floor slabs alternately within the clearance for placing concrete to fill it; a second structure constituted by inserting the ends of the first and second reinforcing bars into a plurality of through-holes formed in a steel belt-like reinforcing plate, respectively, and a third structure constituted by locking nut members 8b screw-fitted into a plurality of end parts of the first and second reinforcing bars into a first face and a second face on first and second precast composite floor slab sides in the belt-like reinforcing plate 7. COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:提供预制复合地板的接合结构,增加接头结构的连接强度并降低接头结构的成本。

      解决方案:这种预制复合地板的接头结构100包括底钢板2a,2b和钢筋混凝土板4a,4b,其具有多个如网状布置的钢筋,并形成在底钢板上以连接预制件的端部 复合地板由第一结构构成,第一结构是将第一和第二预制复合地板坯1a,1b的钢筋混凝土板的端面跨过用于混凝土填充的间隙相互对置而构成的,并将多个 第一和第二预制复合地板的第一和第二钢筋的端部部分交替地在间隙内以便混凝土填充; 分别将第一和第二钢筋的端部分别插入形成在钢带状加强板中的多个通孔所构成的第二结构,以及由螺钉构件8b螺纹配合成多个构造的第三结构 第一和第二钢筋的端部部分分别成为带状加强板7中的第一表面和第一和第二预制复合地板块侧面上的第二面。(C)2011年,JPO和INPIT