会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • HEATING STEAM CONTROL DEVICE FOR REHEATING STEAM TURBINE
    • JPH1018808A
    • 1998-01-20
    • JP19277796
    • 1996-07-03
    • HITACHI LTDHITACHI ENG CO LTD
    • KUROSAWA ATSUHIRONISHINOMIYA TAKUJIHIRONO MASAMITSUWADA NORIHISASHIMOMURA NAOHITOKANEDA HIDEAKI
    • F01K7/24
    • PROBLEM TO BE SOLVED: To suppress thermal stress in a second stage reheater main body, its thermal transmission pipe and a low pressure turbine at the time of service-in of the second stage reheater in a reheating steam turbine. SOLUTION: This device is provided with a heating steam pressure regulating valve 9, a reheater operation data receiving part 22 and a saturation pressure-temperature function curve 23. The heating steam pressure (flow rate) regulating valve 9 is arranged for adjusting extracted steam (main steam) of a high pressure turbine flowed into a second stage reheater 5. An outlet heated steam temperature 17 of a first stage reheater 4 is input to the reheater operation data receiving part 22. Saturation pressure of the heating steam temperature in the second stage reheater 5 is calculated based on the saturation pressure-temperature function curve 23. A second stage reheater heating steam pressure setting function generator 20 is arranged for setting a lower limit set pressure at the time of service-in of the second stage reheater 5 by adding required excessive pressure for heating to the calculated saturation pressure. A heating steam control means 10 is arranged for controlling the regulating valve 9. The heating steam set pressure of the second stage reheater 5 is set equally to the saturation pressure of the outlet heated steam temperature of the first stage reheater 4 based on the outlet heated steam temperature of the first stage reheater which is previously sensed at the time of service-in of the second stage reheater 5.
    • 8. 发明专利
    • WARMING METHOD FOR STEAM TURBINE
    • JPS63179102A
    • 1988-07-23
    • JP988787
    • 1987-01-21
    • HITACHI LTDHITACHI ENG CO LTD
    • MUROBOSHI TAKANORINISHINOMIYA TAKUJIITO TOSHINORIHIRONO MASAMITSU
    • F01D25/10
    • PURPOSE:To suppress thermal stress occurring in a turbine rotor, by predicting the temperature of steam in the downstream of first stage based on the temperature at the inlet of a steam turbine, and heating a metal in the downstream of the initial stage if the temperature of said metal is lower than said predicted temperature. CONSTITUTION:Steam is fed from a boiler through a steam regulation valve 4 to a high pressure turbine. Here, thermal stress of rotor is most concentrated in the downstream of a first stage. In order to heat said portion near to the temperature at the inlet of steam and to reduce the temperature difference, a steam inlet valve 1 is opened prior to starting so as to lead high temperature steam thus warming the first stage of turbine. Warmed steam is fed through a steam outlet valve 2 to a condenser. Here, a check valve 5 at an exhaust section of the high pressure turbine and a ventilator valve 6 are closed. Control signal for the steam valve in a warming system is set on the basis of a target warming temperature corresponding to a starting pattern which is determined on the basis of measurement of a thermometer 3.