    • Structure of diverging/merging section of branch tunnel, and its construction method
    • 分支隧道分流/合并段结构及其施工方法
    • JP2006112111A
    • 2006-04-27
    • JP2004300000
    • 2004-10-14
    • Daiho Constr Co Ltd大豊建設株式会社
    • KASHIMA YUTAKAKONDO NORIOTAKEUCHI HIDEYUKIKOBAYASHI TAKAHARUINADA FUMINOBU
    • E21D9/06E21D9/04
    • PROBLEM TO BE SOLVED: To provide a structure of a diverging/merging section of a branch tunnel 3, which can be easily and safely constructed without excavation, while a lining body is newly constructed, and a construction method for the structure.
      SOLUTION: This structure of the diverging/merging section of the branch tunnel 3, which is constructed between two juxtaposed main-line tunnels 1 and 2, is characterized as follows: the branch tunnel 3 is constructed between the two main-line tunnels 1 and 2; earth retaining materials 7 and 8 are provided in an inserted manner in the upper and lower positions of the branch tunnel 3 from the first main-line tunnel 1 to be branched; leading ends of the earth retaining materials 7 and 8 are provided in an elongated state near the lining body of the second main-line tunnel 2 which is not to be branched; a diverging/merging section skeleton 16 made of reinforced concrete or steel-frame concrete is constructed on an inside surrounded by the upper and lower earth retaining materials 7 and 8 and the inside of the lining body of the first main-line tunnel 1; and a diverging/merging section space 17 is formed inside the skeleton 16.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种分支隧道3的分支/合并部分的结构,其可以在不进行挖掘的情况下容易且安全地构造,同时新建衬里体,以及该结构的施工方法。 解决方案:分支隧道3的分支/合并部分的结构,其构造在两个并置的主线隧道1和2之间,其特征如下:分支隧道3构成在两条主线 隧道1和2; 接地保持材料7和8以插入方式设置在分支通道3的上部和下部位置,从第一主线隧道1被分支; 接地保持材料7和8的前端以不分支的第二主线路通道2的衬里主体附近的细长状态设置; 由钢筋混凝土或钢框架混凝土制成的分流/合并段骨架16由上,下土方保持材料7和8以及第一主线路1的衬里体的内部构成, 并且在骨架16内形成发散/合并部分空间17.版权所有(C)2006,JPO&NCIPI
    • 2. 发明专利
    • Tunnel at confluent/divergent section, and method of constructing confluent/divergent section
    • 影响/分歧部分的隧道及构成影响/分歧部分的方法
    • JP2006057341A
    • 2006-03-02
    • JP2004240936
    • 2004-08-20
    • Daiho Constr Co Ltd大豊建設株式会社
    • KASHIMA YUTAKAKONDO NORIOTAKEUCHI HIDEYUKIINADA FUMINOBU
    • E21D9/06
    • PROBLEM TO BE SOLVED: To provide a method of arranging temporary timbering members 12, 13 which are arranged for stably supporting lining bodies in the process of tunnel construction, to provide a method of economically constructing a tunnel skeleton 80 at a confluent/divergent section 3 having a relatively thin structure while paying attention to sliding of a divergent tunnel 2 caused by an influence of ground-water pressure, and to improve the working efficiency of the tunnel construction.
      SOLUTION: The tunnel at the confluent/divergent section 3 at which a divergent tunnel 2 diverges from a main tunnel 1, has earth retaining members 6, 7 extending from the main tunnel 1 to be arranged on upper and lower portions of the divergent tunnel 2, first reinforcing members 10, 12, 14a for reinforcing a lining body of the main tunnel 1, second reinforcing members 13, 14b for reinforcing a lining body of the divergent tunnel 2, and third reinforcing members 11, 15 for supporting the earth retaining members 6, 7. Then concrete is poured onto the inside of an outer shell 70 of the confluent/divergent section 3 to embed the reinforcing members, and the tunnel skeleton 80 at the confluent/divergent section 3 is constructed, to thereby form a divergent space 100 inside the tunnel skeleton 80 at the confluent/divergent section 3.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种在隧道施工过程中布置用于稳定地支撑衬里体的临时木材构件12,13的方法,以提供一种在汇合/ 发散部3具有相对薄的结构,同时注意由地下水压力的影响引起的发散隧道2的滑动,并提高隧道施工的工作效率。

      解决方案:在发散通道2从主隧道1发散的汇合/扩散部分3处的隧道具有从主隧道1延伸以布置在主隧道1的上部和下部的接地保持构件6,7 发散隧道2,用于加强主隧道1的衬里主体的第一加强构件10,12,14a,用于加强发散隧道2的衬里主体的第二加强构件13,14b,以及用于支撑 然后将混凝土浇注到汇合/扩散部分3的外壳70的内部以嵌入加强构件,并且在汇合/分离部分3处构造隧道骨架80,从而形成 在汇合/发散部分3的隧道骨架80内的发散空间100.版权所有(C)2006,JPO&NCIPI

    • 4. 发明专利
    • Structure of diverging/merging section of branch tunnel, and its construction method
    • 分支隧道分流/合并段结构及其施工方法
    • JP2006112137A
    • 2006-04-27
    • JP2004301037
    • 2004-10-15
    • Daiho Constr Co Ltd大豊建設株式会社
    • KASHIMA YUTAKAKONDO NORIOTAKEUCHI HIDEYUKIINADA FUMINOBU
    • E21D9/01E21D9/04E21D13/00
    • PROBLEM TO BE SOLVED: To provide a structure of a diverging/merging section of a branch tunnel 2, which can be inexpensively, toughly and safely constructed in a short period of time by narrowing a range for regulating the traffic of an in-service road, corresponding to a cut-and-cover section, on the ground, and a construction method of the structure. SOLUTION: A continuous underground wall body 3 is constructed along a main-line tunnel 1, and the branch tunnel 2 is constructed between the tunnel 1 and the wall body 3 in such a manner as to diverge from/merge into the tunnel 1. In the structure of the diverging/merging section of the branch tunnel 2, earth retaining materials 8 and 9 are elongated toward the wall body 3 from upper and lower sections of the tunnel 1. A lining body of reinforced concrete or steel-frame concrete is constructed in an internal space which is enclosed with the materials 8 and 9, the tunnel 1 and the wall body 3. A diverging/merging section space 18 is formed inside the lining body, so that a diverging/merging section skeleton 17 can be constructed. COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了提供分支隧道2的发散/合并部分的结构,其可以在短时间内廉价,坚固和安全地构建,通过缩小用于调节管道的流量的范围 - 对应于地面上的切割部分的通道,以及结构的施工方法。 解决方案:一条连续的地下墙体3沿着主线隧道1构成,分支隧道2以隧道1和墙体3之间的方式构成,从而从隧道中分离出来 1.在分支隧道2的分流/合并部分的结构中,接地保持材料8和9从隧道1的上部和下部向墙体3伸长。钢筋混凝土或钢框架的衬里体 混凝土构造在与材料8和9以及隧道1和壁体3封闭的内部空间中。在衬里主体内部形成有发散/合并部空间18,从而可以使发散/合流部分骨架17 被建造。 版权所有(C)2006,JPO&NCIPI
    • 5. 发明专利
    • Muddy water shield machine
    • MUDDY水膜机
    • JP2005089969A
    • 2005-04-07
    • JP2003320632
    • 2003-09-12
    • Daiho Constr Co Ltd大豊建設株式会社
    • KASHIMA YUTAKATAKEUCHI HIDEYUKIINADA FUMINOBUFUJIYOSHI MASAHIROFUJITA ATSUSHI
    • E21D9/06E21D9/087E21D9/13
    • PROBLEM TO BE SOLVED: To provide a muddy water shield machine capable of accurately preventing the collapse of a working face even when there is danger of the working face collapsing or when a cutter is stopped in a state of moving the offset position of the cutter to the lower end of shield machine cross section during shield boring. SOLUTION: Collapse preventive bodies 20 each formed by connecting a collapse preventive wall 21 provided parallel with the cutter 8, and a peripheral wall collapse preventive hood 22 provided parallel with a hood 4 of the shield machine 1, almost at a right angle, are installed inside the hood 4 being combined in circular arc shape or annular shape that can cover at least the upper half part of the working face 17. Each collapse preventive body 20 is connected to a jack 23 for moving operation so that it can be put in reciprocating operation between the front face side of a partition wall 3 of the shield machine 1 and the immediate back face of the cutter 8, and an injection pipe 28 for injecting a collapse inhibitor in a zone surrounded by the working face 17 and the collapse preventive walls 21 is provided through the inside of a rod 24 fittingly inserted in the jack 23 for moving operation. COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:为了提供一种能够准确地防止工作面的塌陷的泥水保护机,即使存在工作面塌陷的危险,或者当切割器在移动偏移位置的状态下停止时 盾构机下端的切割机横截面在屏蔽镗孔过程中。 解决方案:通过连接与切割器8平行设置的防塌壁21形成的折叠防止体20以及平行于屏蔽机1的罩4设置的周壁防倒塌罩22,几乎成直角 安装在罩4内,组合成可以至少覆盖工作面17的上半部的圆弧形状或环形形状。每个防塌体20连接到用于移动操作的插孔23,使得它可以 在屏蔽机1的隔壁3的正面与切割器8的直立背面之间进行往复运动,以及用于在由工作面17包围的区域中注入防崩溃剂的注入管28, 塌陷防止壁21通过配合插入插座23的杆24的内部设置,用于移动操作。 版权所有(C)2005,JPO&NCIPI
    • 7. 发明专利
    • Spraying device in tunnel
    • 隧道喷涂设备
    • JP2003074299A
    • 2003-03-12
    • JP2001264169
    • 2001-08-31
    • Daiho Constr Co Ltd大豊建設株式会社
    • KONDO NORIOHARUTA KOHEITAKEUCHI HIDEYUKIKOBAYASHI TAKAHARUOKUBO KENJIHASEGAWA HARUOINADA FUMINOBU
    • E21D11/10
    • PROBLEM TO BE SOLVED: To provide a spraying device for the internal wall surface of a tunnel that can safely and efficiently spray in uniform thickness over the whole sprayed object range.
      SOLUTION: This spraying device in the tunnel for spraying a spray material to the internal wall surface of the tunnel has a spraying truck 3 provided with a traveling rail 7 formed along the circumferential direction of the tunnel inside of the internal wall surface of the tunnel, so as to be movable in the longitudinal direction of the tunnel, and a sprayer 8 mounted on the spraying truck and travelable in the circumferential direction of the tunnel within a prescribed moving range. The sprayer 8 is provided with a spray nozzle 9 positioned vertically to the internal wall surface of the tunnel which is the sprayed surface, and the spray nozzle 9 is movable parallel by a prescribed width to the longitudinal direction of the tunnel 9.
      COPYRIGHT: (C)2003,JPO
    • 要解决的问题:提供一种能够在整个喷涂物体范围内均匀厚度地安全有效地喷涂的隧道内壁表面的喷涂装置。 解决方案:该喷涂装置用于将喷涂材料喷洒到隧道的内壁表面,具有喷洒车3,该喷洒车3沿隧道内壁表面内的隧道的圆周方向形成有行进导轨7, 以便能够在隧道的纵向方向上移动,以及安装在喷洒车上并在规定的移动范围内沿隧道的圆周方向行进的喷雾器8。 喷雾器8设置有垂直于作为喷射表面的隧道的内壁表面的喷嘴9,并且喷嘴9可与隧道9的纵向方向平行移动规定的宽度。