会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明专利
    • Building
    • 建造
    • JP2011043029A
    • 2011-03-03
    • JP2009193477
    • 2009-08-24
    • Kumagai Gumi Co Ltd株式会社熊谷組
    • WATANABE NORIO
    • E02D27/34E02D3/12E02D27/12
    • PROBLEM TO BE SOLVED: To shorten a length of a pile, and to economically work the pile by reducing frictional resistance received from soil in order to prevent the pile from being sunk. SOLUTION: This building includes a plurality of the piles provided horizontally and directionally with a space in the soil, and extended upward, respectively, from the soil, and a plate-like member provided perpendicularly with respect to each pile on the soil, and fixed to each pile while surrounding each pile. A surface layer of the soil is soil-improved, and a slab having a plurality of through-holes for receiving the plate-like member is provided on the soil. COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:为了缩短桩的长度,并通过减少从土壤接收的摩擦阻力来经济地对桩施加工作,以防止桩被沉没。 解决方案:该建筑物包括多个水平地和方向地设置在土壤中的空间的堆,并且分别从土壤向上延伸,并且相对于土壤上的每个桩垂直地设置的板状构件 并在每一堆周围固定到每一堆。 土壤的表面层被改善,并且在土壤上设置具有用于容纳板状构件的多个通孔的板坯。 版权所有(C)2011,JPO&INPIT
    • 7. 发明专利
    • Extra-banking concrete collecting tool
    • 超大型混凝土收集工具
    • JP2009013610A
    • 2009-01-22
    • JP2007174308
    • 2007-07-02
    • Kumagai Gumi Co Ltd株式会社熊谷組
    • WATANABE NORIO
    • E02D5/34
    • PROBLEM TO BE SOLVED: To provide an extra-banking concrete collecting tool, easily removing extra-banking concrete in a semi-hardened state, reusable and having high strength.
      SOLUTION: This extra-banking concrete collecting tool 100, which is mounted on the top of a reinforcement cage 31, comprises: a collecting tool body 11 formed of an annular plate material, in which a tremie hole 11a is formed in the center, and radial slits 13 are formed in the periphery of the tremie hole 11a; and a circumferential rib 12 provided on the peripheral edge part of the collecting tool body 11, wherein the peripheral edge part of the collecting tool body 11 is reinforced by the circumferential rib 12.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:为了提供一种超级银行混凝土收集工具,可以轻松地在半硬化状态下去除银行间混凝土,可重复使用并具有高强度。 解决方案:安装在加强笼31的顶部的这种外部银行混凝土收集工具100包括:由环形板材料形成的收集工具主体11,在该收集工具主体11中形成有颤音孔11a 中心和径向狭缝13形成在颤音孔11a的周边; 以及设置在收集工具主体11的周边部分上的周向肋条12,其中收集工具主体11的周缘部分由周向肋条12加强。版权所有:(C)2009,JPO&INPIT
    • 8. 发明专利
    • Construction method of cast-in-place concrete pile
    • 铸造混凝土桩的施工方法
    • JP2005282212A
    • 2005-10-13
    • JP2004099623
    • 2004-03-30
    • Fatec:KkKumagai Gumi Co Ltd株式会社ファテック株式会社熊谷組
    • SATO KOICHIKANAMORI SEIJINONAKA SUGURUWATANABE NORIO
    • E02D5/34C04B22/12C04B24/12C04B24/16C04B24/26C04B28/02
    • PROBLEM TO BE SOLVED: To construct a highly reliable concrete pile even when there are infiltration water and pressured underground water, by simplifying pile head processing.
      SOLUTION: The ground 50 is excavated by using an excavation machine such as an earth drill. After stabilizing an excavation hole wall, when constructing the concrete pile 10 by placing concrete by inserting a reinforcement gabion 54 into an excavation hole 53, after placing the predetermined depth of high self-leveling water resistant concrete 11 of blending a polyether-based water reducing agent including a carboxyl group, and an admixture including (A) a first water soluble low molecular weight compound selected from a cationic surface active agent and (B) a second water soluble low molecular weight compound selected from an anionic aromatic compound, with cement, water, a coarse aggregate and a fine aggregate, the concrete pile 10 is constructed by placing ordinary concrete 12 kneaded with water, ordinary Portland cement and an aggregate.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:即使有渗水和加压地下水,也可以通过简化桩头加工来构建高可靠性的混凝土桩。 解决方案:地面50采用挖掘机如土钻,挖掘。 在稳定挖掘孔壁之后,当通过将加固石笼54插入挖掘孔53中来设置混凝土构造混凝土桩10时,在布置预定深度的混合聚醚基减水的高自流平防水混凝土11之后 包括羧基的试剂和包含(A)选自阳离子表面活性剂的第一水溶性低分子量化合物和(B)选自阴离子芳族化合物的第二水溶性低分子化合物与水泥的混合物, 水,粗骨料和细骨料,混凝土桩10是通过将普通混凝土12与水,普通波特兰水泥和骨料混合而构成的。 版权所有(C)2006,JPO&NCIPI
    • 9. 发明专利
    • Underground structure
    • 地下结构
    • JP2003342963A
    • 2003-12-03
    • JP2002155707
    • 2002-05-29
    • Kumagai Gumi Co Ltd株式会社熊谷組
    • WATANABE NORIOMORI TOSHIHIROOGAWA ATSUSHI
    • E02D29/045E02D5/20E21D13/00
    • PROBLEM TO BE SOLVED: To overcome the problem such that earthquake resistance is not adequately exerted on a force in an in-plane direction along a wall surface of an underground wall in a conventional underground structure. SOLUTION: This underground structure is constituted by combining an earth retaining wall (soil cement column row wall 2) with a reinforced concrete underground structure; the earth retaining wall is constructed by erecting and arranging long earth retaining materials (H-section steel 1) which are constituted in such a manner that the long plates are coupled together by a coupling plate in the state of facing each other; the reinforced concrete underground structure is constructed on the side of one long plate (1a) which is located on the other side of natural ground; and a reinforcing bar of the reinforced concrete underground structure and the earth retaining wall are coupled together by a coupling material (U-shaped coupling reinforcing bar 15). For example, a column main reinforcement (11) of the reinforced concrete underground structure and a beam reinforcement thereof are coupled with the earth retaining material by the coupling material. COPYRIGHT: (C)2004,JPO
    • 要解决的问题:为了克服在常规地下结构中沿着地下壁的壁面在面内方向上的力不能充分施加抗震性的问题。 解决方案:这种地下结构是将土挡土墙(土体水泥柱排墙2)与钢筋混凝土地下结构相结合构成的; 挡土墙是通过竖立和布置长的接地保持材料(H型钢1)而构成的,该长的接地保持材料(H型钢1)以这样的方式构成,即长板通过联接板以彼此面对的状态联接在一起; 钢筋混凝土地下结构构造在位于自然地面另一侧的一个长板(1a)的一侧; 并且钢筋混凝土地下结构的钢筋和土挡土墙通过联接材料(U形联接筋15)联接在一起。 例如,钢筋混凝土地下结构的柱主加固件(11)及其梁加强件通过联接材料与接地保持材料相连接。 版权所有(C)2004,JPO
    • 10. 发明专利
    • Method of cleaning underground oil-contaminated area
    • 清洁地下油污染区域的方法
    • JP2011167596A
    • 2011-09-01
    • JP2010031527
    • 2010-02-16
    • Kumagai Gumi Co Ltd株式会社熊谷組
    • KADOKURA NOBUYUKIWATANABE NORIOSASAKI SHIZUOTOROU SHUZOMURAKAMI JUNYA
    • B09C1/10
    • PROBLEM TO BE SOLVED: To provide a cleaning method capable of effectively cleaning an underground oil-contaminated area.
      SOLUTION: The method of cleaning an oil-contaminated area is characterized by repeating a series of operations comprised of a first operation A of lowering the underground water level to a lower position relative to an underground oil-contaminated area to turn the same into an unsaturated state, a second operation B of supplying the underground oil-contaminated area turned into an unsaturated state with an aerobic bacterium, and a third operation C of returning the underground water level to the normal water level subsequent to allowing the aerobic bacterium to decompose the oil component present in the underground oil-contaminated area. An underground oil-contaminated area can be cleaned by simply carrying out the first operation A, the second operation B, the third operation C, and a fourth operation D of lowering the underground water level to a lower position relative to the underground oil-contaminated area to turn the same into an unsaturated state whereby allowing the aerobic bacterium to decompose the oil component present in the underground oil-contaminated area, subsequent to carrying out the third operation C.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:提供能够有效地清洗地下油污染区域的清洁方法。 解决方案:清洁油污染区域的方法的特征在于重复一系列操作,其包括将地下水位降低到相对于地下油污染区域的较低位置的第一操作A,以使其相同 进入不饱和状态的第二操作B,向需氧细菌提供变成不饱和状态的地下油污染区域的第二操作B,以及在允许需氧细菌到 分解存在于地下油污染地区的油分。 可以通过简单地执行第一操作A,第二操作B,第三操作C和将地下水位降低到相对于地下油污染的较低位置的第四操作D来清洁地下油污染区域 面积使其变为不饱和状态,从而允许好氧细菌在进行第三次手术后,分解存在于地下油污染区域的油分。C.版权所有(C)2011年,JPO&INPIT