会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明专利
    • Method of treating extra-fill concrete and extra-fill concrete treatment tool
    • 处理超细混凝土和超细混凝土处理工具的方法
    • JP2009102915A
    • 2009-05-14
    • JP2007276840
    • 2007-10-24
    • Kumagai Gumi Co Ltd株式会社熊谷組
    • OGAWA ATSUSHIMORI TOSHIHIRO
    • E02D5/34
    • PROBLEM TO BE SOLVED: To provide an extra-fill concrete treatment tool capable of easily removing extra-fill concrete and installable and removable easily and also provide a method of treating extra-fill concrete using the treatment tool.
      SOLUTION: This extra-fill concrete treatment tool 10 comprises a cylindrical separating tube 11, a bottom plate 12 which is attached to the lower part of the separating tube 11 and in which a tremie hole 12a is formed, and a cover member 13 formed of an elastic member which is installed on the peripheral edge part of the tremie hole 12a in the bottom plate. The extra-fill concrete treatment tool 10 is disposed on the inside of the core reinforcements 53 of a cage 50, and slime and defective concrete are stacked in the space between the side surface of the treatment tool 10 and the inner wall 40a of a drilled hole 40. Consequently, the defective concrete is not stacked on the inside of the core reinforcements 53.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种能够容易地去除多余的混凝土并且可以容易地拆卸并且可安装和移除的额外的混凝土处理工具,并且还提供使用该处理工具处理补给混凝土的方法。 解决方案:该补充混凝土处理工具10包括圆柱形分离管11,底板12,其附接到分离管11的下部,并且其中形成有颤音孔12a和盖构件 13,其由安装在底板的颤音孔12a的周缘部的弹性构件构成。 补充混凝土处理工具10设置在保持架50的芯加强件53的内侧,并且在处理工具10的侧表面和钻孔的内壁40a之间的空间中堆积粘泥和有缺陷的混凝土 因此,有缺陷的混凝土不会堆叠在核心增强件53的内部。版权所有(C)2009,JPO&INPIT
    • 6. 发明专利
    • Underground structure
    • 地下结构
    • JP2003342963A
    • 2003-12-03
    • JP2002155707
    • 2002-05-29
    • Kumagai Gumi Co Ltd株式会社熊谷組
    • WATANABE NORIOMORI TOSHIHIROOGAWA ATSUSHI
    • E02D29/045E02D5/20E21D13/00
    • PROBLEM TO BE SOLVED: To overcome the problem such that earthquake resistance is not adequately exerted on a force in an in-plane direction along a wall surface of an underground wall in a conventional underground structure. SOLUTION: This underground structure is constituted by combining an earth retaining wall (soil cement column row wall 2) with a reinforced concrete underground structure; the earth retaining wall is constructed by erecting and arranging long earth retaining materials (H-section steel 1) which are constituted in such a manner that the long plates are coupled together by a coupling plate in the state of facing each other; the reinforced concrete underground structure is constructed on the side of one long plate (1a) which is located on the other side of natural ground; and a reinforcing bar of the reinforced concrete underground structure and the earth retaining wall are coupled together by a coupling material (U-shaped coupling reinforcing bar 15). For example, a column main reinforcement (11) of the reinforced concrete underground structure and a beam reinforcement thereof are coupled with the earth retaining material by the coupling material. COPYRIGHT: (C)2004,JPO
    • 要解决的问题:为了克服在常规地下结构中沿着地下壁的壁面在面内方向上的力不能充分施加抗震性的问题。 解决方案:这种地下结构是将土挡土墙(土体水泥柱排墙2)与钢筋混凝土地下结构相结合构成的; 挡土墙是通过竖立和布置长的接地保持材料(H型钢1)而构成的,该长的接地保持材料(H型钢1)以这样的方式构成,即长板通过联接板以彼此面对的状态联接在一起; 钢筋混凝土地下结构构造在位于自然地面另一侧的一个长板(1a)的一侧; 并且钢筋混凝土地下结构的钢筋和土挡土墙通过联接材料(U形联接筋15)联接在一起。 例如,钢筋混凝土地下结构的柱主加固件(11)及其梁加强件通过联接材料与接地保持材料相连接。 版权所有(C)2004,JPO
    • 7. 发明专利
    • Foundation for supporting building on ground
    • 基地支持地基建设
    • JP2012117204A
    • 2012-06-21
    • JP2010264772
    • 2010-11-29
    • Kumagai Gumi Co Ltd株式会社熊谷組
    • MORI TOSHIHIROOGAWA ATSUSHI
    • E02D27/34E04B1/20
    • PROBLEM TO BE SOLVED: To reduce the number of reinforcing bars inside a bottom slab, to reduce the thickness of the bottom slab, and to economically construct the foundation of a building by reducing required flexural strength of the bottom slab between a footing under the building and a side wall at an interval from the footing in the horizontal direction.SOLUTION: The foundation for supporting the building on the ground includes: the footing under the building installed in the ground; the side wall provided at an interval from the footing in a first horizontal direction and vertically to the first horizontal direction in the ground and separated from the building; and the bottom slab provided between a position separated downwards from the surface of the ground on the side wall and the footing, whose one end is fixed to the side wall at the position and other end is adjacent to the footing so as to be rotated around a rotary axis extending in a second horizontal direction orthogonal to the first horizontal direction.
    • 要解决的问题:为了减少底板内的钢筋的数量,以减小底板的厚度,并且通过减少底板在底脚之间的所需弯曲强度来经济地构造建筑物的基础 在建筑物下方和与水平方向上的基脚间隔的侧壁。 解决方案:支持建筑物的基础包括:建筑物下方的脚下安装在地面上; 所述侧壁在所述地面中沿着第一水平方向并且垂直于所述第一水平方向与所述基脚间隔设置并与所述建筑物分离; 并且所述底板设置在从所述侧壁上的地面的表面向下分离的位置与所述基脚之间,所述底脚的一端固定在所述位置处的侧壁并且另一端与所述基脚相邻以便围绕 旋转轴在与第一水平方向正交的第二水平方向上延伸。 版权所有(C)2012,JPO&INPIT
    • 8. 发明专利
    • Building foundation using earth retaining wall
    • 使用地球保持墙建筑基金会
    • JP2012046978A
    • 2012-03-08
    • JP2010190745
    • 2010-08-27
    • Araigumi Co LtdKumagai Gumi Co LtdPs Mitsubishi Construction Co Ltd株式会社ピーエス三菱株式会社新井組株式会社熊谷組
    • MORI TOSHIHIROOGAWA ATSUSHIFUJITA TAKESHISOTETSU SEIJIFURUSAWA AKIHIKOWATANABE KAZUHIRO
    • E02D27/00
    • PROBLEM TO BE SOLVED: To enable an earth retaining wall to surely bear horizontal forces during an earthquake, by suppressing deformation of the earth retaining wall both when the horizontal force directed in the directions of approaching and receding from a base acts on the earth retaining wall above the base of a building foundation.SOLUTION: A building foundation includes: a base which is provided perpendicularly to an earth retaining wall below a surface of the ground; at least one upper rod-like member which is disposed at an interval upward from the center of a thickness-direction of the base inside the base, is horizontally elongated via an end of the base from the base, and has its leading end fixed to the earth retaining wall; and at least one lower rod-like member which is disposed at an interval downward from the center inside the base, is horizontally elongated via the end from the base, and has its leading end fixed to the earth retaining wall.
    • 要解决的问题:为了使地球挡土墙在地震期间能够确实承受水平力,通过抑制沿着接近和从基座后退的方向的水平力作用在地面上时,可以抑制地面挡土墙的变形 地基挡土墙在建筑基础的基础之上。 解决方案:建筑基础包括:垂直于地面表面下方的挡土墙设置的基座; 至少一个上部杆状构件从底座内部的基部的厚度方向的中心向上间隔设置,经由底座的端部从基部水平伸长,并且其前端固定到 挡土墙; 并且至少一个下部杆状构件,其从基座内的中心向下设置的间隔,经由端部从基部水平伸长,并且其前端固定到挡土墙。 版权所有(C)2012,JPO&INPIT
    • 9. 发明专利
    • Processing method of extra-banking concrete and processing tool of extra-banking concrete
    • 超外压混凝土加工工艺及其加工工艺
    • JP2009102907A
    • 2009-05-14
    • JP2007276596
    • 2007-10-24
    • Kumagai Gumi Co Ltd株式会社熊谷組
    • MORI TOSHIHIROOGAWA ATSUSHI
    • E02D5/34
    • PROBLEM TO BE SOLVED: To provide a processing tool of extra-banking concrete and a processing method of the extra-banking concrete using the processing tool of extra-banking concrete which can easily remove the extra-banking concrete, and can facilitate mounting work and removal work.
      SOLUTION: The processing tool 10 of extra-banking concrete is constituted by a cylindrical body 13 and an annular member 14. The cylindrical body 13 is provided with a cylindrical separation pipe 11 and a bottom plate 12 attached to the bottom of the cylindrical separation pipe 11, and the inner edge part of the annular member 14 is placed on the lower part side of the cylindrical body 13 which is arranged outside of a core reinforcing iron bar 53 on the inner side of a main reinforcement 51. Then defective concrete is taken into the interior of the separation pipe 11 from the space between a tremie hole 12a provided in the center of the bottom plate 12 and a tremie tube 55, and slime is taken in from a slit 14a provided to the annular member 14. Thus, only the slime can accumulate outside the cylindrical body 13.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种超银行混凝土的加工工具,以及采用银行外混凝土加工工具的银行间混凝土的加工方法,可以方便地除去银行外混凝土,并可以方便 安装工作和拆卸工作。 解决方案:银行外混凝土的加工工具10由圆柱形主体13和环形构件14构成。圆柱体13设置有圆柱形分离管11和底板12,底板12附接到 圆筒状分离管11,环状部件14的内缘部位于配置在主加强件51的内侧的芯加强铁棒53的外侧的筒状体13的下部侧。 混凝土从设置在底板12的中心的颤音孔12a和颤音管55之间的空间被吸入分离管11的内部,并且从设置在环状构件14上的狭缝14a中取出粘液。 因此,只有粘液才能积聚在圆柱体13之外。版权所有(C)2009,JPO&INPIT
    • 10. 发明专利
    • Method of evaluating bending moment borne by coupling means which couples earth retaining wall and foundation slab
    • 通过耦合方式评估弯曲形状的方法通过耦合方式来保持接地壁和基础层
    • JP2013036272A
    • 2013-02-21
    • JP2011174962
    • 2011-08-10
    • Kumagai Gumi Co Ltd株式会社熊谷組Araigumi Co Ltd株式会社新井組Ps Mitsubishi Construction Co Ltd株式会社ピーエス三菱
    • MORI TOSHIHIROOGAWA ATSUSHIFUJITA TAKESHISOTETSU SEIJIWATANABE KAZUHIROFURUSAWA AKIHIKO
    • E02D17/04E02D27/00
    • PROBLEM TO BE SOLVED: To design more economical coupling means which couples an earth retaining wall and a foundation slab by preventing a bending moment borne by the coupling means from being evaluated excessively.SOLUTION: A method of evaluating a bending moment Mborne by the coupling means includes: calculating a first bending moment Mgenerated on the earth retaining wall at a position of the same height as an upper surface of the foundation slab by an earth pressure and a water pressure, a second bending moment Maround a line intersection of the upper surface of the foundation slab and the earth retaining wall by force in the vertical direction generated on the earth retaining wall, a third bending moment Mgenerated on the earth retaining wall at the position of the same height as a lower surface of the foundation slab, and a fourth bending moment Maround the line intersection by shear force generated on the earth retaining wall at the position of the same height as the lower surface of the foundation slab; and calculating Mby an equation M=M+M-M-M.
    • 要解决的问题:为了设计更经济的联接装置,其通过防止由联接装置承受的弯矩被过度评估来连接挡土墙和基础板。 解决方案:评估由耦合装置承载的弯矩M wp 的方法包括:计算第一弯矩M WS < SB>通过土压力和水压在与地基板的上表面相同高度的位置处产生在土挡土墙上,第二弯矩M sn 围绕基础板的上表面与土挡土墙之间的垂直方向绕地面挡土墙产生的垂直方向的交叉点,产生第三弯矩M S 地基保持墙位于与基础板的下表面相同高度的位置处,以及通过在地球上产生的剪切力在线交点附近的第四弯矩M QS 在与基础板的下表面相同高度的位置处的挡土墙; 并且通过公式M W P = M WS 计算M wp sn -M S -M QS 。 版权所有(C)2013,JPO&INPIT