会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明专利
    • Shear reinforcing structure of concrete structure
    • 混凝土结构的剪切加固结构
    • JP2011208428A
    • 2011-10-20
    • JP2010077220
    • 2010-03-30
    • Kumagai Gumi Co Ltd株式会社熊谷組
    • HAMADA MAKOTO
    • E03F3/04
    • PROBLEM TO BE SOLVED: To provide a shear reinforcing structure of a concrete structure that can fully exhibit the shearing yield strength of a reinforcing member by improving the sticking force of a filler to the reinforcing member.SOLUTION: The shear reinforcing structure 1 of the concrete structure 3 includes: straight grooves 5 of predetermined depth formed in an internal wall surface 1a of the concrete structure 3; the plate-like reinforcing member 6 inserted in the depth direction into the grooves 5; and the filler 7 filled in the grooves 5. The reinforcing member 6 is formed with engaging parts comprising through-holes 6m or rugged parts.
    • 要解决的问题:提供混凝土结构的剪切增强结构,其可以通过改善填料对加强构件的粘附力来充分显示加强构件的剪切屈服强度。解决方案:混凝土的剪切增强结构1 结构3包括:形成在混凝土结构3的内壁表面1a中的预定深度的直槽5; 板状加强构件6沿深度方向插入槽5中; 并且填充物7填充在槽5中。加强构件6形成有包括通孔6m或凹凸部的接合部。
    • 5. 发明专利
    • Building
    • 建造
    • JP2008138412A
    • 2008-06-19
    • JP2006324449
    • 2006-11-30
    • Kumagai Gumi Co Ltd株式会社熊谷組
    • ISHIBASHI HISAYOSHISAWADA KENJIHAMADA MAKOTO
    • E04G23/02
    • PROBLEM TO BE SOLVED: To solve the problem of the conventional building, wherein the connecting work using welding is complicated because the end parts of an aseismic reinforcement respectively connected to an upstairs skeleton and a downstairs skeleton vertically adjacent to each other are connected to each other by welding.
      SOLUTION: A side part 7 of the aseismic reinforcement 3 is connected to a side structure of the skeleton 6 of an existing building 2 by a skeleton connecting means 10, and one end part 9 of a vertical part 8 of one aseismic reinforcement 3 and one end part 9 of a vertical part 8 of the other aseismic reinforcement 3 are connected to each other by a reinforcement upper and lower connecting means 11. The reinforcement upper and lower connecting means 11 is formed of a vertical pipe material 41 extending between one end part 9 of the vertical part 8 of the one aseismic reinforcement 3 and one end part 9 of the vertical part 8 of the other aseismic reinforcement 3 to be located to cover the periphery of these one end parts 9;9, and the skeleton connecting means 10 is formed of an anchor connecting the side part 7 of the aseismic reinforcement 3 and one side surface of the skeleton 6 of the existing building 2.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题为了解决传统建筑物的问题,其中使用焊接的连接作业是复杂的,因为分别连接到楼上骨架和楼下骨架彼此垂直相邻的抗震加固件的端部被连接 通过焊接。 解决方案:抗震加固件3的侧部7通过骨架连接装置10和一个抗震加固件的垂直部分8的一个端部9连接到现有建筑物2的骨架6的侧面结构 3和另一个抗震加固件3的垂直部分8的一个端部9通过加强件上下连接装置11彼此连接。加强件上下连接装置11由垂直管材41形成, 一个抗震加固件3的垂直部分8的一个端部9和另一个抗震加固件3的垂直部分8的一个端部9被定位成覆盖这些一个端部9; 9的周边,并且骨架 连接装置10由连接抗震加固件3的侧部7和现有建筑物2的骨架6的一个侧面的锚固件形成。版权所有(C)2008,JPO&INPIT
    • 6. 发明专利
    • Building seismically reinforcing method, building, and seismically reinforcing material
    • 建筑地震加固方法,建筑物和地震加固材料
    • JP2008057175A
    • 2008-03-13
    • JP2006233975
    • 2006-08-30
    • Kumagai Gumi Co Ltd株式会社熊谷組
    • SAWADA KENJIISHIBASHI HISAYOSHIHAMADA MAKOTO
    • E04G23/02E04B1/21
    • PROBLEM TO BE SOLVED: To provide a building seismically reinforcing method for improving earthquake resisting effect without damaging the appearance of a building or without hindering a view via an opening section or passage of persons through the opening section, and to provide the building, and a seismically reinforcing material.
      SOLUTION: According to the building seismically reinforcing method, the seismically reinforcing material 2 is fixed to columns 5 or to a wall and a beam 7 around the opening section 4 facing the outside of a multiple dwelling building 3 so as to be astride the columns 5 or the wall and the beam 7. The building 1 is constructed by fixing the seismically reinforcing material 2 to the columns 5 or the wall and the beam 7 around the opening section 4 facing the outside of the multiple dwelling building 3, so as to be astride the columns 5 or the wall and the beam 7. The seismically reinforcing material 2 is formed like the tee.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种用于提高抗震效果的建筑物地震增强方法,而不损坏建筑物的外观,或者通过开口部分或通过开口部分的人通过观察,并提供建筑物 ,以及地震增强材料。 解决方案:根据建筑物地震增强方法,将地震增强材料2固定在立柱5上,或固定在围绕多段住宅3外侧的开口部分4上的壁和梁7上,以跨越 立柱5或墙壁和梁7.建筑物1通过将地震增强材料2固定在立柱5或壁和梁7上,围绕开口部分4面向多层住宅3的外部,因此 跨越柱5或壁和梁7.地震增强材料2形成为像三通。 版权所有(C)2008,JPO&INPIT
    • 7. 发明专利
    • Slab for forming floor slab
    • 用于形成地板的SLAB
    • JP2006118339A
    • 2006-05-11
    • JP2005094845
    • 2005-03-29
    • Fatec:KkFujimori Sangyo KkKumagai Gumi Co Ltdフジモリ産業株式会社株式会社ファテック株式会社熊谷組
    • KATO TAKEHIKOYOSHIMATSU KENJIOWAKI MASANAOISHIBASHI HISAYOSHIHAMADA MAKOTOSAKAO KEIJI
    • E04B5/38E04B5/43
    • PROBLEM TO BE SOLVED: To provide a slab used for constructing a floor slab, reducing labor required for its installation. SOLUTION: The slab 12 for forming the floor slab comprises a PC plate 16 forming a part of the floor slab 10, and a plurality of blocks 18 substantially forming voids in the floor slab. The PC plate comprises a plate-like body 20 presenting rectangular shape as a whole, a single or a plurality of projection parts 22 projecting upward from the body and extending at the center between a pair of edge parts, parallel with the edge parts, and a plurality of reinforcements 24 embedded along the respective edge parts of the body and extending upward. The blocks 18 are arranged between the projection parts 22 and reinforcements 24 of the PC plate or further between the projection parts, along the projection parts at spaces from one another. COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供用于构造楼板的板坯,减少其安装所需的人力。 解决方案:用于形成地板的板坯12包括形成楼板10的一部分的PC板16和在楼板中基本形成空隙的多个块18。 PC板包括整体呈矩形形状的板状主体20,从主体向上突出并在与边缘部分平行的一对边缘部分之间的中心延伸的单个或多个突起部22,以及 沿着主体的各个边缘部分嵌入并向上延伸的多个增强件24。 块18布置在PC板的突出部分22和加强件24之间,或者在突出部分之间,沿着彼此间隔开的突出部分布置。 版权所有(C)2006,JPO&NCIPI
    • 8. 发明专利
    • METHOD FOR CONSTRUCTING CONCRETE STRUCTURE
    • JPH08113981A
    • 1996-05-07
    • JP27429794
    • 1994-10-14
    • KUMAGAI GUMI CO LTD
    • YOSHIMATSU KENJIISHIBASHI HISAYOSHIHAMADA MAKOTOTSUJIMURA TOMOAKI
    • E04B1/16E04B1/20
    • PURPOSE: To easily execute construction even in a narrow site and to reduce field work and to shorten a construction period by a method wherein a precast concrete column member, wherein a reinforcing bar extends upward, a beam member, and a floor member are combined and a shear reinforcement bar, beam upper end reinforcement bar, and other floor main reinforcement bar are arranged and concrete is placed. CONSTITUTION: A column member 10, wherein the upper ends of column main bars 18 protrude from a column body 16 and the lower ends thereof are inserted into sleeve joints 22, is erected on a floor 30. And a grout material is placed. Next, beam lower end bars are projected from the end surface of a beam main body and each end of beam members 12, in which hoop bars 20 are projected from the beam body, is placed on the adjacent column member 10. And precast floor members 14 are laid across the beam members 12. At the same time, beam lower end bars of the opposed beam members 12 are combined and shear reinforcement bars and beam upper end bars are arranged, following which concrete is placed on column beam joints, beam members 12, and floor members 14. Thus arranging and combining work of reinforcement bars can be reduced and construction can be performed even in a narrow site.