会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 93. 发明专利
    • External wall climbing device and unit supporting tool used for the same
    • 外墙吊装装置及其相应的支撑工具
    • JP2007278034A
    • 2007-10-25
    • JP2006109196
    • 2006-04-11
    • Japan Steels International Incジャパン スチールス インターナショナル株式会社
    • YONAHARA YOSHIHIROYONAHARA ICHIRO
    • E04G3/30E04G3/18E04G5/06E04G7/26
    • PROBLEM TO BE SOLVED: To rapidly perform replacing work and to reduce the labor of a field worker in replacing work.
      SOLUTION: A unit supporting tool 20 is used for supporting a unit frame having a plurality of horizontal support beams and a plurality of vertical supports. The unit supporting tool 20 includes a support body 21 detachably mounted on a building and a receiving arm 31 swingably mounted on the support body 21. The receiving arm 31 has a receiving groove 37 with which the vertical support is engaged while is free to swing between a supporting position where the horizontal support beam is engaged and a retracted position for allowing a movement of the unit frame kicked up by the horizontal support beam at the lower side when the unit frame is lifted. When the horizontal support beam moves up, the receiving arm 31 returns to the support position by its own weight for supporting the horizontal support beam.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:快速地进行替换工作,减少现场工作人员替换工作的劳动力。

      解决方案:单元支撑工具20用于支撑具有多个水平支撑梁和多个垂直支撑件的单元框架。 单元支撑工具20包括可拆卸地安装在建筑物上的支撑体21和可摆动地安装在支撑体21上的接收臂31.接收臂31具有接收槽37,垂直支撑件与该接收槽37接合, 支撑位置,其中水平支撑梁被接合,以及缩回位置,用于当单元框架被提升时允许单元框架在下侧被水平支撑梁踢起来。 当水平支撑梁向上移动时,接收臂31通过其自身的重量返回支撑位置,以支撑水平支撑梁。 版权所有(C)2008,JPO&INPIT

    • 98. 发明专利
    • DEVICE FOR WORK AT STRUCTURE'S WALL SURFACE
    • JPH0230851A
    • 1990-02-01
    • JP17945788
    • 1988-07-19
    • NIPPON BISO KK
    • SUGIYAMA YUTAKAKURUO SHIZUKA
    • E04G3/28E04G3/30E04G3/34E04G5/12E04G21/24E04G21/32
    • PURPOSE:To install and remove at less costs by curing a work part only with a curing material hung down, together with a wall surface work stand, from an upper horizontal travelling trolleys, and by allowing a curing stand, connected to the lower part of the curing material, to travel horizontally along a lower rail for horizontal travelling. CONSTITUTION:An upper temporary rail 14 for horizontal travel is installed to rail supports 13 that are fixed to the upper end of a structure. A lower temporary rail 24 for horizontal travel is installed to the lower part of a wall surface to be processed. A work gondola 19 is hung down from horizontal travelling trolleys 16 that travel along the rail 14, and a curing gondola 23 is also hung down from the trolley 16 through a hanging frame 22. The gondola 23 is allowed to travel horizontal along the rail 24 with lower horizontal travelling trolleys 28 that are fixed to the opposite sides of the gondola 23. The gondola 19 is covered with a curing net 21 that is hung down through the frame 22. As the gondola 19 travels, the gondola 23 is made to travel together, and thereby work parts are covered with the net 21.