会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • Multi-dimensional transformation positioning device
    • 多维变换定位装置
    • JP2005054430A
    • 2005-03-03
    • JP2003285546
    • 2003-08-04
    • Kajima Corp鹿島建設株式会社
    • MIYAZAKI YASUNOBUMIZUTANI AKIRAYAMADA TOMO
    • E04G3/28E04G21/16G01C15/00E04G3/10
    • PROBLEM TO BE SOLVED: To accurately transfer at a high accuracy from an existing coordinate to an objective coordinate by measuring the position of a lifting heavy material in real time and secure a high positioning accuracy by making an accurate coordinate directly obtained by a coordinate measuring device.
      SOLUTION: The device is constituted of a 360 degree whole peripheral type reflection target prism 6 suspended by a restiform such as a wire 4 from at least two sides and attached to a lifting heavy material 1 moving in the multi-dimensional direction and an operation control disk 7 having an automatic following coordinate measurement device 5.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:通过以实时的方式直接获得的精确坐标来实时地测量提升重材料的位置,从而将高精度地从现有的坐标精确地传递到目标坐标,从而确保高的定位精度 坐标测量装置。 解决方案:该装置由360度全周型反射目标棱镜6构成,其由诸如线4的至少两个侧面的电线4悬挂,并附接到在多维方向上移动的提升重物质1, 具有自动跟随坐标测量装置5的操作控制盘7.(C)2005年,JPO&NCIPI
    • 8. 发明专利
    • Suspended frame for scaffold
    • JP2004332210A
    • 2004-11-25
    • JP2003124890
    • 2003-04-30
    • Komuragumi:Kk有限会社コムラ組
    • KAGAWA TOSHIMICHI
    • E01D21/00E04G3/00E04G7/20E04G3/10
    • PROBLEM TO BE SOLVED: To provide a suspended frame for a scaffold, by which the connecting works of the suspended frame for the scaffold are conducted easily, an operator can carry out the scaffold safely and the scaffold can be carried out easily by a constant working method even in a river or a sea or at a place, where a service car or the like does not reach, in a lower section and which can be carried out inexpensively.
      SOLUTION: Upper-lower cylindrical master pipes 1 and 2 are held integrally by a plurality of stretching plate materials 3, and members 4 for a connection are installed integrally at both ends of the master pipes 1 and 2. The members 4 for the connection are composed of pipe inserting sections 5 integrally mounted at either one-side end section of the upper-side master pipe 1 or the lower-side master pipe 2, short-sized pipe sections 6 integrally secured at either other-end side end section of the pipe 2 or the pipe 1 and holding plate sections 7 integrally holding these pipe inserting sections 5 and short-sized pipe sections 6 upwards and downwards. When a plurality of the upper-lower master pipes 1 and 2 are connected in the longitudinal direction, each short-sized pipe section 6 is inserted, fitted, fixed and connected to each pipe inserting section 5.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 10. 发明专利
    • Temporary scaffolding of structure and construction method therefor
    • 结构及其施工方法的暂时性破坏
    • JP2004250944A
    • 2004-09-09
    • JP2003040912
    • 2003-02-19
    • Hitachi Plant Eng & Constr Co Ltd日立プラント建設株式会社
    • HAYASHI YUICHITAKAHASHI SATOSHIKAWAGUCHI SHIGEYOSHI
    • E04G3/00E04G3/10
    • PROBLEM TO BE SOLVED: To provide temporary scaffolding of a structure and a construction method therefor, which enable the mounting and inspection of installations along a side wall of the structure and inspection work for the installations to be suspended, without doubly installing an intermediate stage and scaffolding on the peripheral surface of the structure.
      SOLUTION: The suspended multitier temporary scaffolding 10 is provided in a vertical plane shape along a peripheral side wall in a boiler furnace 71 as the structure; a highly rigid supporting beam 11 is built in as scaffolding for an intermediate tier in a prescribed position; and the intermediate stage 12 is integrally built inside the intermediate tier. Additionally, in the construction of the temporary scaffolding 10, the temporary scaffolding 10 is split into some parts on a plan view, and the respective split parts are lifted tier by tier and coupled to one another.
      COPYRIGHT: (C)2004,JPO&NCIPI
    • 要解决的问题:提供一种结构及其施工方法的临时脚手架,其能够沿着结构的侧壁安装和检查装置,并且对于要悬挂的装置进行检查工作,而不需要双重安装 中间阶段和脚手架在结构的外围表面。 解决方案:悬挂式多层临时脚手架10作为结构沿着锅炉炉71的周边侧壁设置成垂直平面形状; 高度刚性的支撑梁11被构建为用于指定位置的中间层的脚手架; 并且中间台12整体地内置在中间层的内部。 此外,在临时脚手架10的构造中,临时脚手架10在平面图上被分割为一些部分,并且各个分割部分逐层地提升并且彼此耦合。 版权所有(C)2004,JPO&NCIPI