    • 93. 发明专利
    • SEGMENT FOR SHIELD TUNNEL
    • JPH04213695A
    • 1992-08-04
    • JP40162190
    • 1990-12-12
    • MATSUMOTO YOSHIJI
    • MATSUMOTO YOSHIJI
    • E21D11/08E21D13/00E21D13/02
    • PURPOSE:To reduce cost and shorten a term of work of shield excavation by making a segment for tunnel in concrete construction which is reinforced by using a molded material made by impregnating a specific fiber into resin or its short fiber, etc. CONSTITUTION:Segments for shield tunnel made of concrete construction reinforced using molded materials in the forms of bar, plate, L-shape, T-shape, groove-shape, cylinder, square tube, etc., made by impregnating one of carbon fiber, glass fiber, aramid fiber or vinylon into resin, or steel. fiber are used to one part 9 of the wall body of a main tunnel 1. Then, similar segments are used also to one part 11 of the wall body of a main tunnel 5 that a shield machine 7 reaches. Next, protective equipment 13, 15 are provided in a ring shape imide main tunnels 1, 3. And, the shield machine 7 installed inside the main tunnel 1 is moved fold to cut and break down one part 9 of the wall body with a digging blade 17, and excavates the natural ground, thereby soil improvement and wall body wrecking work can be eliminated.
    • 94. 发明专利
    • MOVABLE SUPPORT FRAME FOR TUNNEL LINING SEGMENT
    • JPH04194297A
    • 1992-07-14
    • JP32249390
    • 1990-11-28
    • NIPPON STEEL CORPMATSUMOTO YOSHIJI
    • MATSUMOTO YOSHIJINAKAMURA MINORUSONODA TETSUJI
    • E21D11/10
    • PURPOSE:To increase the efficiency of an assembly work by intercoupling expandable support frames, where two sets of the opposite end parts of an arcuate frame material arranged in the shape of a circle are pivotally mounted and a jack is located between two sets of other opposite end parts, through a jack for moving a support frame. CONSTITUTION:A number of segments 8 arranged in an annular state are supported in a stable state by a support frame 4, expanded by means of jacks 3, until mortar 9 at a coupling part is cured and strength attains a given value. After the mortar 9 is cured and strength attains a given value, the support frame 4 is moved forward through expansion of jacks 5 for moving a support frame in a state that the support frame 4 at a front part is contracted. The support frame 4 is expanded and forced into pressure contact with a segment ring, and the support frame 4 in the rear is contracted, and through contraction of the jack 5 for moving the support frame, the support frame 4 is moved forward. Subsequently, the support frame 4 in the rear is expanded and forced into pressure contact with the segment for support.
    • 95. 发明专利
    • COUPLING STRUCTURE FOR STEEL-SHELL CONCRETE SEGMENT
    • JPH0431597A
    • 1992-02-03
    • JP13700390
    • 1990-05-29
    • NIPPON STEEL CORPMATSUMOTO YOSHIJI
    • MATSUMOTO YOSHIJINAKAMURA MINORUYOSHIZUMI TOSHIHIKO
    • E21D11/04
    • PURPOSE:To connect steel-shell concrete segments by a method in which projected bars are provided on the ground side and inside and intermediate of the tunnel for the side plates of a steel-shell concrete sigment, a water stopper is put into the groove between the projected bars, and mortar is also packed into the space formed by the side plates and the intermediate projected bar. CONSTITUTION:A water stopper 8 is fitted into the groove between the ground side projected bar 4 and the first intermediate projected bar 6 and also into the groove between the tunnel inner wall projected bar 5 and the second intermediate projected bar 7. The stopper 8 is projected from the tops of both-side projected bars. The projected bars 4 in the steel shell 2 of each steel-shell concretes 1 to be connected, the unnel inside projected bar 5, and the first and second intermediate projected bars 6 and 7 are connected at their tops by welding. Mortar 9 is packed into the space formed by the side plates 3 of each steel shell 2 and the first and second intermediate projected bars 6 and 7 to connect the steel shells 2. Water-stop property can thus be kept and couplers can be easily connected.
    • 98. 发明专利
    • VERTICAL SHAFT FOR SHIELD CONSTRUCTION
    • JPH02176093A
    • 1990-07-09
    • JP32994288
    • 1988-12-27
    • MATSUMOTO YOSHIJI
    • MATSUMOTO YOSHIJI
    • E21D9/06
    • PURPOSE:To contrive the shortening of the term of construction or the like by constructing the wall body section of a vertical shaft at least for a shield excavator to pass, with concrete for using the reinforcing-bar-shaped stiffener of resin impregnated with carbon fibers or the like. CONSTITUTION:On the lower floor of a vertical shaft 11 and the almost whole surface of a side wall surface, the stiffeners of reinforcing bars or the like are arranged, and concrete ia placed, and wall bodies 13 are constructed. Besides, for a wall body section 131 to be excavated, the reinforcing-bar-shaped stiffeners of resin impregnated with carbon fibers or the like are used in place of reinforcing bars, and as the aggregates of the concrete, artificial aggregates or the like for example are used, respectively. After that, a shield excavator 12 is positionally adjusted to a water-proof device 14 set in the shape of a ring in the wall 131. Then, by a shield jack 15, the excavator 12 is moved forward, and the section 131 is excavated with an excavating edge. Accordingly, a cost can be reduced, and the term of construction can be shortened, and a safety degree can be improved.
    • 100. 发明专利
    • ABSORBER FOR EXPANSION AND CONTRACTION OF BRIDGE GIRDER
    • JPH01169004A
    • 1989-07-04
    • JP32787487
    • 1987-12-23
    • MATSUMOTO YOSHIJI
    • MATSUMOTO YOSHIJI
    • E01C11/02E01D19/06
    • PURPOSE:To disperse and absorb stress generated in a road pavement section due to the expansion and contraction of a distance between bridge girders extending over a wide range, and to prevent cracking and a swelling phenomenon by installing an elastically deformed expansion plate and an elastic sheet at the end section of the bridge girder. CONSTITUTION:An expansion plate 3 made of steel has a protruding section filled with fillers 7 intruding in a clearance between bridge girders 1, 2, an elastic sheet 8A of approximately 4m in length in the direction of travelling is positioned onto the expansion plate 3 centering around the upper section of the protruding section, and an asphalt road pavement section is formed onto the elastic sheet 8A. The pavement section is composed of a first layer 10 and a second layer 11, and a wire gauze 12 is buried between the layers 10 and 11 in order to prevent the fine cracking of a paving surface. The elastic sheet 8A, the bridge girders 1, 2 and the first layer 11 are joined by a rubber asphalt group synthetic resin.