会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明公开
    • PROCESS FOR PREPARING ICE SUBSTITUTES
    • VERFAHREN ZUR HERSTELLUNG VON EISERSATZ
    • EP0998652A4
    • 2005-04-20
    • EP98935959
    • 1998-07-23
    • WINTERLAB LTD
    • LIBERMAN BARNET LGLIDDEN PETER H
    • F25D3/00A23L3/36C09K5/06F25C1/10F25C1/22F25D13/06
    • C09K5/066F25C1/10F25C1/22F25D13/065
    • A process of freezing a belt (46) of encapsulated ice substitute is provided. The process for freezing the ice substitute belt generally includes the steps of preparing a capsule belt (46) with a plurality of capsules (48), each capsule containing a thermal controlling agent which is a liquid in a predetermined temperature range; preparing a brine (12) including a cruciferous oil, salts and a glycol and cooling the brine; feeding the belt into an apparatus (11) which contains the cooled brine and passing the belt through the brine, adjusting the speed to the extent sufficient for the thermal controlling agent to become solidified. The travelling speed of the ice substitute belt is adjusted depending on the composition of the thermal controlling agent.
    • 提供了一种冷冻包封的冰替代品的带的过程。 冷冻冰替代带的过程通常包括制备具有多个胶囊的胶囊带的步骤,每个胶囊含有在预定温度范围内为液体的热控制剂; 制备包括十字花科油,盐和二醇的盐水并冷却盐水; 将带送入包含冷却的盐水并使带穿过盐水的装置; 将速度调节至足以使热控制剂固化的程度。 冰替代带的移动速度根据热控制剂的组成而调节。
    • 5. 发明公开
    • HYDRATION AND FREEZING PLANT FOR FLEXIBLE REFRIGERANT MEDIA
    • WÄSSERUNGS-UND GEFRIERANLAGEFÜRBIEGSAMEKÄTTETRÄGER
    • EP1009960A4
    • 2000-10-04
    • EP98934421
    • 1998-07-10
    • THERMAL PRODUCTS INC
    • MURRAY JOSEPH CGAUDE LYMAN E
    • F25D3/00F25D13/06F25D25/04F28D20/02F25D17/02
    • F25D25/04F25D13/06F25D13/065F25D13/067
    • Apparatus for preparing packaging materials for use in shipment of heat sensitive materials, utilizes a hydration module (11), a freezing module (40), and a delivery module (45). Rolls of superabsorbent polymer-based refrigerant media (117) in the form of a continuous web of a selected length and width are maintained in dry storage. These may be cut to size along the web material which separates cells containing the superabsorbent polymer. The web or pad is advanced into the hydration module (11) which comprises a dip tank (17) or spray system (26) to provide an adequate supply of hydrating fluid to the superabsorbent polymer. The hydrated web is then conveyed through a freezing chamber (40) having a temperature of -10 DEG Fahrenheit, or lower, where the fluid absorbed within the cells freezes. The small footprint of the modular system means that necessary handling, including cutting into a suitable size and shape, may be accomplished in the consumer's shipping area for placement around perishable materials in shipping containers.
    • 用于制备用于运输热敏材料的包装材料的设备利用水合模块(11),冷冻模块(40)和输送模块(45)。 以选定长度和宽度的连续卷材形式的基于超吸收性聚合物的制冷剂介质(117)的卷保持干燥储存。 这些可以沿着分离含有超吸收性聚合物的细胞的网状材料被切割成适当尺寸。 该网或衬垫被推进到包括浸渍罐(17)或喷雾系统(26)的水合模块(11)中,以向超吸收性聚合物提供充足的水合流体供应。 然后将水合纤维网输送通过温度为-10华氏度或更低的冷冻室(40),其中细胞内吸收的流体冻结。 模块化系统的占地面积小意味着可以在消费者的运输区域完成必要的处理,包括切割成合适的尺寸和形状,以便将易腐物质放置在集装箱内。
    • 9. 发明公开
    • Kühlsystem
    • EP2589903A1
    • 2013-05-08
    • EP11405350.7
    • 2011-11-02
    • R & D Carbon, Ltd.
    • Fischer, WernerFischer, Jean Claude
    • F25D13/06B21B43/06C25C3/00
    • F25D13/065C25C3/125
    • Eine Vorrichtung zum Kühlen von Körpern (1 - 13), insbesondere von weichen Formkörpern wie Grünanoden, umfasst mindestens einen ersten und einen zweiten Wagen (200) zur Aufnahme eines der Körper (1 - 13) sowie ein Kühlbad mit einer ersten Kühlbadbahn (110) mit einem Kühlmittel, in welchem die beiden Wagen (200) aufnehmbar und verfahrbar sind. Die erste Kühlbadbahn (110) weist an einem ersten Ende einen Eintritt und an einem dem ersten Ende gegenüberliegendem zweiten Ende einen Austritt für die Wagen (200) auf. Der im Bereich des Eintritts in der ersten Kühlbadbahn (110) angeordnete zweite Wagen (200) ist mittels eines Antriebs (600, 601) so verfahrbar, dass der erste Wagen (200) antriebsfrei durch den zweiten Wagen (200) in Richtung des Austritts der ersten Kühlbadbahn (110) vorgestossen werden kann.
    • 该装置具有容纳软模制结构(1)的第一和第二托架(200),以及包含冷却剂的第一冷却槽轨道(110)的冷却槽,其中两个托架​​(200)被接收和移动。 第一个冷却槽轨道在其第一端具有运输入口(200),并在其第二端出口。 布置在第一冷却槽轨道的进入区域中的第二滑架200被驱动(600,601)移动,使得第一滑架(200)通过第二滑架朝向第一滑架朝向第一冷却槽轨道的出口被向前推动而不用驱动单元。 包括用于冷却诸如绿色阳极的软模制结构的方法的独立权利要求。