    • 5. 发明专利
    • Method of driving pile
    • 驱动桩的方法
    • JP2011140765A
    • 2011-07-21
    • JP2010000733
    • 2010-01-05
    • Takenaka Doboku Co LtdTakenaka Komuten Co Ltd株式会社竹中土木株式会社竹中工務店
    • TAYA YUJITSUCHIYA TOMIOKAWATO KOSUKEARAI MITSUNORIIGARASHI SHINYASUZUKI YASUSUKEKON NOBUAKIKONISHI KAZUOGOTO TAKASHI
    • E02D7/28E02D7/00
    • PROBLEM TO BE SOLVED: To drive a prefabricated pile under a low altitude head condition without requiring a large device.
      SOLUTION: In the initial excavating step 10, a hollow first pile is held by a pile holding device and erected, an excavation rod is inserted into the first pile, and a vertical hole having a larger diameter than the first pile is excavated in a ground. In a pile joint step 12, an intermediate joint excavation rod inserted into a second pile is connected to the excavation rod, the second pile is connected to the head of the first pile, and the second pile is lifted from a pile driver to which the intermediate joint excavation rod is attached. In a pile settling step 14, the holding of the first pile by the pile holding device is released, and the first pile and the second pile are settled into the vertical hole while excavating the vertical hole by the excavation rod. In a foot protection formation step 16, the pile is held by the pile holding device when the front end of the first pile reaches a predetermined position, and after a foot protection is formed by filling and stirring a foot protection fluid while excavating the vertical hole by the excavation rod, the excavation rod is pulled up. In a pile foot protection step 18, the front end of the first pile is settled into the foot protection.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:在低空头部条件下驱动预制桩,而不需要大型装置。 解决方案:在初始挖掘步骤10中,一个中空的第一桩由桩保持装置保持并竖立,将挖掘杆插入第一桩中,并且挖掘直径大于第一桩的垂直孔 在地上 在桩接合步骤12中,将插入第二桩的中间接头挖掘杆连接到挖掘杆,第二桩连接到第一桩的头部,并且第二桩从打桩机提升到 中间关节挖掘杆被安装。 在桩沉降步骤14中,松开由桩保持装置保持的第一堆桩,并且通过挖掘杆挖掘垂直孔时将第一桩和第二桩沉入垂直孔中。 在足部保护形成步骤16中,当第一桩的前端到达预定位置时,桩被桩保持装置保持,并且在通过在挖掘垂直孔的同时填充和搅拌脚部保护液而形成脚部保护 通过挖掘杆,挖掘杆被拉起。 在桩脚保护步骤18中,第一桩的前端沉降到脚部保护中。 版权所有(C)2011,JPO&INPIT
    • 6. 发明专利
    • Soil improving body creating method and soil improving foundation structure
    • 土壤改良体系创新方法与土壤改良基础结构
    • JP2009121136A
    • 2009-06-04
    • JP2007296571
    • 2007-11-15
    • Takenaka Doboku Co LtdTakenaka Komuten Co Ltd株式会社竹中土木株式会社竹中工務店
    • SATO EIJIAOKI MASAMICHISAITO TAKEYAICHIKAWA AKIOKON NOBUAKI
    • E02D3/12E02D27/14
    • PROBLEM TO BE SOLVED: To provide a soil improving body creating method which enables columnar soil improving bodies to exert sufficient strength even under conditions where soil wedges are formed immediately under a structure or a vertical bearing force of each columnar soil improving body reaches a level on the order of an ultimate vertical bearing force, and to provide a soil improving foundation structure.
      SOLUTION: According to the soil improving body creating method, under the conditions where the soil wedges 2 are formed immediately under the structure 1, or the vertical bearing force of each columnar soil improving body 10 reaches the level on the order of the ultimate vertical bearing force, reinforcing sections 18 are constructed by inserting reinforcing bodies such as H-steels to a depth at which a bending load is applied to the soil improving bodies 10.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种土壤改良体的制造方法,即使在立柱土体改良体的结构或垂直承载力立即形成土壤楔形体的条件下,也能使柱状土壤改良体发挥足够的强度到达 提供最终垂直承载力顺序的水平,并提供土壤改良基础结构。 解决方案:根据土壤改良体的产生方法,在土体楔2立即形成在结构1下方的条件下,或者每个柱状土壤改质体10的垂直承载力达到 通过将诸如H型钢的增强体插入施加到土壤改良体10上的弯曲载荷的深度来构造加强部分18。(C)2009,JPO&INPIT
    • 8. 发明专利
    • Ground liquefaction preventing method, liquefaction registant ground, and building base part structure
    • 接地液化预防方法,液化注入地和建筑基础部分结构
    • JP2009007894A
    • 2009-01-15
    • JP2007172375
    • 2007-06-29
    • Takenaka Doboku Co LtdTakenaka Komuten Co Ltd株式会社竹中土木株式会社竹中工務店
    • UCHIDA AKIHIKOHIRAKAWA YASUAKIKAWASAKI TETSUTOHIDESHIMA YASUSHIKON NOBUAKIMORI MORIMASA
    • E02D27/34E02D3/02E02D27/30
    • PROBLEM TO BE SOLVED: To provide a liquefaction preventing method, a liquefaction preventive ground, and a building base part structure using the weight of a building itself to constrain the ground while improving ground constraining force by shutting a ground portion right under the building off a peripheral ground and applying a weight to the ground portion.
      SOLUTION: The ground liquefaction preventing method comprises a step of forming an underground peripheral wall 2 encircling a building in a ground where the existing building is installed, and a step of installing a counterweight 8 on the ground portion in the underground peripheral wall 2. The underground peripheral wall 2 is arranged distant from the outer peripheral edge of the building in the horizontal direction, and the underground 2 is separated from a base part 6 of the building so that the load of the building operates on the ground portion in the underground peripheral wall 2 to tighten soil in the ground portion. The weight of the counterweight 8 is set so that the tightening force is great enough to prevent the liquefaction of the ground.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:为了提供液化防止方法,液化防止地面和使用建筑物本身的重量的建筑物基础部件结构来约束地面,同时通过在地下部分关闭地面约束力 建造一个周边地面,并对地面部分施加重量。 解决方案:地面液化防止方法包括在现有建筑物的地面上形成围绕建筑物的地下周壁2的步骤,以及将配重8安装在地下周壁的地面部分上的步骤 地下的周壁2沿水平方向远离建筑物的外围边缘布置,地下2与建筑物的基座6分开,使得建筑物的载荷在地面部分上运行 地下周壁2紧固地面部分的土壤。 配重8的重量被设定为使得紧固力足够大以防止地面的液化。 版权所有(C)2009,JPO&INPIT