会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Method of driving pile
    • 驱动桩的方法
    • JP2011140765A
    • 2011-07-21
    • JP2010000733
    • 2010-01-05
    • Takenaka Doboku Co LtdTakenaka Komuten Co Ltd株式会社竹中土木株式会社竹中工務店
    • TAYA YUJITSUCHIYA TOMIOKAWATO KOSUKEARAI MITSUNORIIGARASHI SHINYASUZUKI YASUSUKEKON NOBUAKIKONISHI KAZUOGOTO TAKASHI
    • E02D7/28E02D7/00
    • PROBLEM TO BE SOLVED: To drive a prefabricated pile under a low altitude head condition without requiring a large device.
      SOLUTION: In the initial excavating step 10, a hollow first pile is held by a pile holding device and erected, an excavation rod is inserted into the first pile, and a vertical hole having a larger diameter than the first pile is excavated in a ground. In a pile joint step 12, an intermediate joint excavation rod inserted into a second pile is connected to the excavation rod, the second pile is connected to the head of the first pile, and the second pile is lifted from a pile driver to which the intermediate joint excavation rod is attached. In a pile settling step 14, the holding of the first pile by the pile holding device is released, and the first pile and the second pile are settled into the vertical hole while excavating the vertical hole by the excavation rod. In a foot protection formation step 16, the pile is held by the pile holding device when the front end of the first pile reaches a predetermined position, and after a foot protection is formed by filling and stirring a foot protection fluid while excavating the vertical hole by the excavation rod, the excavation rod is pulled up. In a pile foot protection step 18, the front end of the first pile is settled into the foot protection.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:在低空头部条件下驱动预制桩,而不需要大型装置。 解决方案:在初始挖掘步骤10中,一个中空的第一桩由桩保持装置保持并竖立,将挖掘杆插入第一桩中,并且挖掘直径大于第一桩的垂直孔 在地上 在桩接合步骤12中,将插入第二桩的中间接头挖掘杆连接到挖掘杆,第二桩连接到第一桩的头部,并且第二桩从打桩机提升到 中间关节挖掘杆被安装。 在桩沉降步骤14中,松开由桩保持装置保持的第一堆桩,并且通过挖掘杆挖掘垂直孔时将第一桩和第二桩沉入垂直孔中。 在足部保护形成步骤16中,当第一桩的前端到达预定位置时,桩被桩保持装置保持,并且在通过在挖掘垂直孔的同时填充和搅拌脚部保护液而形成脚部保护 通过挖掘杆,挖掘杆被拉起。 在桩脚保护步骤18中,第一桩的前端沉降到脚部保护中。 版权所有(C)2011,JPO&INPIT