会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 7. 发明授权
    • Proactive power management in a parallel computer
    • 并行计算机中的主动电源管理
    • US07941681B2
    • 2011-05-10
    • US11840711
    • 2007-08-17
    • Thomas M. GoodingTodd A. InglettThomas A. LiebschThomas E. MustaDon D. Reed
    • Thomas M. GoodingTodd A. InglettThomas A. LiebschThomas E. MustaDon D. Reed
    • G06F1/32
    • G06F9/4843G06F1/3203G06F1/329Y02D10/24
    • Proactive power management in a parallel computer, the parallel computer including a service node and a plurality of compute nodes, the service node connected to the compute nodes through an out-of-band service network, each compute node including a computer processor and a computer memory operatively coupled to the computer processor. Embodiments include receiving, by the service node, a user instruction to initiate a job on an operational group of compute nodes in the parallel computer, the instruction including power management attributes for the compute nodes; setting, by the service node in accordance with the power management attributes for the compute nodes of the operational group, power consumption ratios for each compute node of the operational group including a computer processor power consumption ratio and a computer memory power consumption ratio; and initiating, by the service node, the job on the compute nodes of the operational group of the parallel computer.
    • 并行计算机中的主动功率管理,并行计算机包括服务节点和多个计算节点,服务节点通过带外服务网络连接到计算节点,每个计算节点包括计算机处理器和计算机 可操作地耦合到计算机处理器的存储器。 实施例包括由服务节点接收用于在并行计算机中的计算节点的操作组上发起作业的用户指令,所述指令包括用于计算节点的功率管理属性; 由服务节点根据操作组的计算节点的功率管理属性设置包括计算机处理器功耗比和计算机存储器功耗比的操作组的每个计算节点的功耗比; 并且由服务节点发起并行计算机的操作组的计算节点上的作业。
    • 8. 发明申请
    • Proactive Power Management in a Parallel Computer
    • 并行计算机中的主动电源管理
    • US20090049313A1
    • 2009-02-19
    • US11840711
    • 2007-08-17
    • Thomas M GoodingTodd A. InglettThomas A. LiebschThomas E. MustaDon D. Reed
    • Thomas M GoodingTodd A. InglettThomas A. LiebschThomas E. MustaDon D. Reed
    • G06F1/00
    • G06F9/4843G06F1/3203G06F1/329Y02D10/24
    • Proactive power management in a parallel computer, the parallel computer including a service node and a plurality of compute nodes, the service node connected to the compute nodes through an out-of-band service network, each compute node including a computer processor and a computer memory operatively coupled to the computer processor. Embodiments include receiving, by the service node, a user instruction to initiate a job on an operational group of compute nodes in the parallel computer, the instruction including power management attributes for the compute nodes; setting, by the service node in accordance with the power management attributes for the compute nodes of the operational group, power consumption ratios for each compute node of the operational group including a computer processor power consumption ratio and a computer memory power consumption ratio; and initiating, by the service node, the job on the compute nodes of the operational group of the parallel computer.
    • 并行计算机中的主动功率管理,并行计算机包括服务节点和多个计算节点,服务节点通过带外服务网络连接到计算节点,每个计算节点包括计算机处理器和计算机 可操作地耦合到计算机处理器的存储器。 实施例包括由服务节点接收用于在并行计算机中的计算节点的操作组上发起作业的用户指令,所述指令包括用于计算节点的功率管理属性; 由服务节点根据操作组的计算节点的功率管理属性设置包括计算机处理器功耗比和计算机存储器功耗比的操作组的每个计算节点的功耗比; 并且由服务节点发起并行计算机的操作组的计算节点上的作业。
    • 9. 发明授权
    • Managing power in a parallel computer
    • 在并行计算机中管理电源
    • US07877620B2
    • 2011-01-25
    • US11840743
    • 2007-08-17
    • Alan GaraThomas M. GoodingTodd A. InglettThomas A. LiebschThomas E. Musta
    • Alan GaraThomas M. GoodingTodd A. InglettThomas A. LiebschThomas E. Musta
    • G06F1/26
    • G06F1/263G06F1/3203
    • Managing power in a parallel computer, the parallel computer including a power supply and a plurality of compute nodes, the plurality of compute nodes powered by the power supply through a plurality of DC-DC converters, each DC-DC converter supplying current to an assigned group of compute nodes, each DC-DC converter having a current sensor. Embodiments include monitoring, by the current sensor, an amount of current supplied by that DC-DC converter to its assigned group of compute nodes; determining, by at least one DC-DC converter, that the amount of current supplied is greater than a predefined threshold value; sending, by the at least one DC-DC converter to the plurality of compute nodes, a global interrupt, including notifying the plurality of compute nodes to reduce power consumption; and reducing, by the plurality of compute nodes in accordance with power consumption ratios, power consumption of the compute nodes.
    • 在并行计算机中管理并行计算机,并行计算机包括电源和多个计算节点,所述多个计算节点由电源通过多个DC-DC转换器供电,每个DC-DC转换器将电流提供给所分配的 一组计算节点,每个DC-DC转换器具有电流传感器。 实施例包括由电流传感器监测由该DC-DC转换器提供给其分配的计算节点组的电流量; 由至少一个DC-DC转换器确定所提供的电流量大于预定阈值; 由所述至少一个DC-DC转换器向所述多个计算节点发送全局中断,包括通知所述多个计算节点以减少功耗; 并且根据功耗比由所述多个计算节点减少所述计算节点的功率消耗。
    • 10. 发明申请
    • Managing Power in a Parallel Computer
    • 在并行计算机中管理电源
    • US20090049317A1
    • 2009-02-19
    • US11840743
    • 2007-08-17
    • Alan GaraThomas M. GoodingTodd A. InglettThomas A. LiebschThomas E. Musta
    • Alan GaraThomas M. GoodingTodd A. InglettThomas A. LiebschThomas E. Musta
    • G06F1/32
    • G06F1/263G06F1/3203
    • Managing power in a parallel computer, the parallel computer including a power supply and a plurality of compute nodes, the plurality of compute nodes powered by the power supply through a plurality of DC-DC converters, each DC-DC converter supplying current to an assigned group of compute nodes, each DC-DC converter having a current sensor. Embodiments include monitoring, by the current sensor, an amount of current supplied by that DC-DC converter to its assigned group of compute nodes; determining, by at least one DC-DC converter, that the amount of current supplied is greater than a predefined threshold value; sending, by the at least one DC-DC converter to the plurality of compute nodes, a global interrupt, including notifying the plurality of compute nodes to reduce power consumption; and reducing, by the plurality of compute nodes in accordance with power consumption ratios, power consumption of the compute nodes.
    • 在并行计算机中管理并行计算机,并行计算机包括电源和多个计算节点,所述多个计算节点由电源通过多个DC-DC转换器供电,每个DC-DC转换器将电流提供给所分配的 一组计算节点,每个DC-DC转换器具有电流传感器。 实施例包括由电流传感器监测由该DC-DC转换器提供给其分配的计算节点组的电流量; 由至少一个DC-DC转换器确定所提供的电流量大于预定阈值; 由所述至少一个DC-DC转换器向所述多个计算节点发送全局中断,包括通知所述多个计算节点以减少功耗; 并且根据功耗比由所述多个计算节点减少所述计算节点的功率消耗。