会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明专利
    • Grouting method
    • 组合方法
    • JP2007191856A
    • 2007-08-02
    • JP2006008276
    • 2006-01-17
    • Kyokado Eng Co LtdNittoc Constr Co Ltd強化土エンジニヤリング株式会社日特建設株式会社
    • SHIMADA SHUNSUKEOYA TSUTOMUINAGAWA KOICHIYOSHIDA TOYOICHIRO
    • E02D3/12
    • PROBLEM TO BE SOLVED: To inject grout into a place, based on a plan, in ground through a permeable hole wall retaining material with an upper part, partially subjected to impermeable working, in such a manner that the more grout is injected into a lower part.
      SOLUTION: An injection pipe device X is inserted into a drilled hole 9; subsequently, a bag body 4 is filled with a curable suspension, and expanded to form a bag packer 3; and the grout is injected from an outer pipe exhaust port 5 between the bag packers 3 and 3, so that the ground 6 can be solidified. In this case, the permeable hole wall retaining material 8 partially subjected to the impermeable working is mounted between the bag packers 3 and 3. The more grout is injected in the lower part through the retaining material 8.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:通过具有上部的可渗透孔壁保持材料,部分地进行不可渗透的加工,以注入更多的浆料的方式将浆料注入到地面 进入下半部分。 解决方案:注射管装置X插入到钻孔9中; 随后,用可固化悬浮液填充袋体4,并且膨胀以形成袋式包装机3; 并且浆料从袋式包装机3和3之间的外管排气口5喷射,使得地面6可以固化。 在这种情况下,部分经受不可渗透加工的可渗透孔壁保持材料8安装在袋式包装机3和3之间。通过保持材料8将更多的浆料注入下部。(C) 2007年,日本特许厅和INPIT
    • 7. 发明专利
    • Method of improving contaminated soil with high pressure jet
    • 用高压喷射器改善污染土壤的方法
    • JP2004225443A
    • 2004-08-12
    • JP2003016509
    • 2003-01-24
    • Nittoc Constr Co LtdZenitaka Corp日特建設株式会社株式会社銭高組
    • IWASAKI NORIOTADANO HIDEKINISHI SUMIOINAGAWA KOICHI
    • E02D3/12B09B3/00
    • PROBLEM TO BE SOLVED: To safely and positively perform construction by preventing the fall of the soil covered ground onto a cavity before filling a fluidized hardening material or onto an unconsolidated improved part immediately after construction, and to positively replace contaminated soil with improved soil in a method of improving contaminated soil with high pressure jet comprising a boring process of boring a borehole in the ground to be improved, by a guide of a casing, a jet cutting process of cutting the ground by jetting high pressure jet water from a cutting rod inserted in the bored borehole and removing the contaminated soil onto the ground through the periphery of the cutting rod, and a fluidized hardening material placing process of placing a fluidized hardening material in the cut part of the ground.
      SOLUTION: Ground improvement comprising the boring process, the jet cutting process and the fluidized hardening material placing process is divided in soil improvement of a first stage (B-1) and a process from a second stage (B-2) located below, and soil improvement of the first stage (B-1) is executed as a roof consolidated body, preceding a consolidated body of the second stage (B-2) downward.
      COPYRIGHT: (C)2004,JPO&NCIPI
    • 要解决的问题:通过防止在填充流化硬化材料之前将土壤覆盖的地面塌陷到空腔上,或者在施工后立即在未固结的改良部件上进行安全和积极的施工,并以改进的方式积极地更换污染的土壤 通过高压射流改善污染土壤的方法中的土壤,包括通过套管引导件来改善地面钻孔的钻孔过程,通过套管的引导件将射流切割过程从高压射流喷射 切割杆插入到钻孔中,并通过切割杆的周边将污染的土壤移除到地面上;以及流化硬化材料放置过程,将流化的硬化材料放置在地面的切割部分中。 解决方案:包括钻孔工艺,喷射切割工艺和流化硬化材料放置工艺的地面改良分为第一阶段(B-1)的土壤改良和位于第二阶段(B-2)的工艺 在第一阶段(B-2)的合并体向下的第一阶段(B-1)的土壤改良作为屋顶固结体执行。 版权所有(C)2004,JPO&NCIPI
    • 8. 发明专利
    • Chemical grouting device
    • 化学配料设备
    • JP2005314941A
    • 2005-11-10
    • JP2004133298
    • 2004-04-28
    • Kyokado Eng Co LtdNittoc Constr Co Ltd強化土エンジニヤリング株式会社日特建設株式会社
    • SHIMADA SHUNSUKEOYA TSUTOMUINAGAWA KOICHIYAMAGISHI KIYOTAKA
    • E02D3/12
    • PROBLEM TO BE SOLVED: To prevent a packer grout material from being solidified while it is filled into only a lower part in a packer, prevent it from being not grouted up to an upper part in the packer, and fill the packer grout material in all the parts of one packer securely.
      SOLUTION: This chemical grouting device is constituted in such a way that it is composed of a grouting external pipe 1 provided with the packers 4 which are a plurality of bag bodies having water permeability and swelling to become larger than digged hole diameter at an interval in the axial direction and a grouting internal pipe 2 insertable into the grouting external pipe 1, solidifying material is filled into the bag bodies from the grouting internal pipe 2 to swell the bag bodies, consolidate peripheral ground, and form the packers 4, and solidifying material is grouted between the packers 4 to solidify a predetermined region by grouting. The packers 4 are a plurality of bag bodies 4a, 4b whose at least intermediate parts are tightened by a tightening member 12 and which are divided using a tightening part as boundary.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了防止封隔器灌浆材料仅在封隔器的下部仅被填充时固化,防止其被灌浆到封隔器的上部,并填充封隔器浆料 材料在一个封隔器的所有部分安全。 解决方案:该化学灌浆装置构成为由具有封隔器4的灌浆外管1构成,封隔器4是具有透水性和膨胀的多个袋体,其变得比挖孔直径大 轴向间隔和可插入灌浆外管1的灌浆内管2,凝固材料从灌浆内管2填充到袋体中,使袋体膨胀,固结周边地面,形成封隔器4, 并且在封隔器4之间灌注凝固材料,以通过灌浆固化预定区域。 封隔器4是多个袋体4a,4b,其至少中间部分被紧固件12紧固,并且使用紧固件作为边界分开。 版权所有(C)2006,JPO&NCIPI
    • 9. 发明专利
    • Chemical grouting device
    • 化学配料设备
    • JP2005314940A
    • 2005-11-10
    • JP2004133297
    • 2004-04-28
    • Kyokado Eng Co LtdNittoc Constr Co Ltd強化土エンジニヤリング株式会社日特建設株式会社
    • SHIMADA SHUNSUKEOYA TSUTOMUINAGAWA KOICHIYAMAGISHI KIYOTAKA
    • E02D3/12
    • PROBLEM TO BE SOLVED: To provide a chemical grouting device capable of swelling a bag body securely, forming a clearance for grouting chemicals for improving the ground between bag bodies securely, and reinforcing the ground securely.
      SOLUTION: This chemical grouting device is constituted in such a way that it is composed of a grouting external pipe 1 provided with packers 4 which are a plurality of bag bodies having water permeability and swelling to become larger than digged hole diameter at an interval in the axial direction and a grouting internal pipe insertable into the grouting external pipe 1, solidifying material is filled into the bag bodies from the grouting internal pipe to swell the bag bodies, consolidate peripheral ground, and form the packers 4, and solidifying material is grouted between the packers 4 to solidify a predetermined region by grouting. A grouting port 5 provided in the grouting external pipe 1 in the packer 4 is covered with a sleeve 6 with a collar 6a which becomes an openable and closable check valve opened by grouting pressure.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种能够牢固地膨胀袋体的化学灌浆装置,形成用于灌浆化学品的间隙,用于牢固地改善袋体之间的接地,并且牢固地加强地面。 解决方案:该化学灌浆装置构成为由具有封隔器4的灌浆外管1构成,封隔器4是具有透水性和膨胀的多个袋体,其比在 轴向间隔和可插入灌浆外管1的灌浆内管,凝固材料从灌浆内管填充到袋体中,使袋体膨胀,固结周边地面,形成封隔器4,固化材料 在封隔器4之间灌浆,通过灌浆固化预定区域。 设置在封隔器4中的灌浆外管1中的灌浆口5被套筒6覆盖,套筒6成为通过注浆压力打开的可开闭的止回阀的套环6a。 版权所有(C)2006,JPO&NCIPI
    • 10. 发明专利
    • Ground reinforcing method
    • 地基加固方法
    • JP2005314939A
    • 2005-11-10
    • JP2004133296
    • 2004-04-28
    • Kyokado Eng Co LtdNittoc Constr Co Ltd強化土エンジニヤリング株式会社日特建設株式会社
    • SHIMADA SHUNSUKEOYA TSUTOMUINAGAWA KOICHIYAMAGISHI KIYOTAKA
    • E02D3/12
    • PROBLEM TO BE SOLVED: To provide an economically excellent ground reinforcing method for providing a large columnar penetration source for chemicals, ensuring large discharge amount, and making a large improved body at a time in a short time to improve construction property.
      SOLUTION: By using a chemical grouting device composed of a grouting external pipe 1 provided with packers 4 which are a plurality of bag bodies having water permeability on an outer face and a grouting internal pipe 2 insertable into the grouting external pipe, the packers 4 are swelled to adhere closely to a wall face of an insertion hole, then the grouting internal pipe 2 is moved in the axial direction to position a discharge port of the grouting internal pipe 2 between adjacent packers 4, chemicals are force-fed into the grouting internal pipe 2 under pressure to discharge from the discharge port, and chemicals are poured into peripheral ground from a grouting port of the grouting external pipe 1. Grouting speed is small at initial grouting stage, but is gradually increased after that.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了提供一种用于提供化学品的大柱状渗透源,确保大量排放量并且在短时间内一次大大改善体积以提高施工性能的经济优良的地面强化方法。 解决方案:通过使用由灌浆外管1构成的化学灌浆装置,该灌浆外管1具有封装器4,封隔器4是外表面具有透水性的多个袋体和可插入灌浆外管的灌浆内管2, 封隔器4被膨胀以紧密地附着在插入孔的壁面上,然后使灌浆内管2沿轴向移动,以将灌浆内管2的排出口定位在相邻的包装机4之间,将化学品强制送入 灌浆内管2在压力下从排出口排出,化学品从灌浆外管1的灌浆口倒入周围地面。灌浆速度在初始灌浆阶段较小,但逐渐增加。 版权所有(C)2006,JPO&NCIPI