热词
    • 7. 发明专利
    • Soil improving work apparatus and soil improving method
    • 土壤改良工程设备和土壤改良方法
    • JP2010144332A
    • 2010-07-01
    • JP2008319270
    • 2008-12-16
    • Onoda Chemico Co LtdSanwa Kizai Co Ltd三和機材株式会社小野田ケミコ株式会社
    • NISHIO KYOINOUE KATSUMIHAMANO MAMORUSHIMANO TOMOAKI
    • E02D3/12
    • PROBLEM TO BE SOLVED: To provide a soil improving apparatus carrying out further deep excavation and agitation after advancing an excavating-agitating head rod into the ground for excavation. SOLUTION: This soil improving work apparatus is formed with a long excavation work rod by connecting an extended shaft rod coaxially to the upper end of an excavation work head rod with an excavation work blade journaled to the lower end and with a motor provided at the lower end to rotate the excavation work blade. The excavation work rod is elevatably supported to a support member protrusively provided at a base machine, through a holder, and the holder is provided with a drive wheel and a normal-reverse rotating motor for rotating the drive wheel. A driven band engaged with the drive wheel and extended from the upper end of the extended shaft rod substantially to the lower end is laid on the extended shaft rod, and the excavation work rod is elevated through the driven band by the rotation of the drive wheel. COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:提供一种土壤改良装置,在将挖掘搅拌头杆推进地面进行挖掘之后,进一步进行深挖和搅拌。 解决方案:该土壤改良工作装置由长的挖掘工作杆形成,该延伸杆与同时位于挖掘工作头杆的上端同轴地连接有挖掘作业刀片,该挖掘工作刀片安装在下端,并具有电动机 在下端旋转挖掘作业刀片。 挖掘工作杆通过保持件可升降地支撑在突出设置在基础机器上的支撑构件上,并且保持器设置有用于使驱动轮旋转的驱动轮和正转反转马达。 与驱动轮接合并从延伸轴杆的上端大致延伸到下端的从动带被放置在延伸的杆杆上,并且挖掘工作杆通过驱动轮的旋转而被提升通过从动带 。 版权所有(C)2010,JPO&INPIT
    • 8. 发明专利
    • Multiple excavating and agitating blade drive unit in ground improving machine
    • 地面改良机械多台式起重机驱动单元
    • JP2009030336A
    • 2009-02-12
    • JP2007195313
    • 2007-07-27
    • Onoda Chemico Co LtdSanwa Kizai Co Ltd三和機材株式会社小野田ケミコ株式会社
    • HAMANO MAMORUSHIMANO TOMOAKINISHIO KYO
    • E02D3/12
    • PROBLEM TO BE SOLVED: To eliminate a fault of increasing excavation reaction force in a conventional unit for rotating a pair of excavating and agitating blades in the same direction.
      SOLUTION: In a multiple excavating and agitating blade drive unit installed at the lower end of an agitation rod of a proper length, two bearing shafts are supported in the lower part of the drive unit so that they are rotatable independently while their axis lines are in alignment with each other in a state where their one end part is protruded outside, and a motor is installed in the upper part of the drive unit. Excavating and agitating blades are fixed respectively to the outside protruding end parts of both bearing shafts so as to be rotatable vertically to the ground when the agitation rod is nearly vertical. A driven bevel gear is fixed to the inside of each bearing shaft, and a drive bevel gear is fixed to the output shaft of the motor. The drive bevel gear meshes with the two driven bevel gears to rotate both excavating and agitating blades in the direction opposite to each other.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:为了消除在相同方向旋转一对挖掘和搅拌叶片的常规单元中增加挖掘反作用力的缺陷。

      解决方案:在安装在适当长度的搅拌棒下端的多重挖掘和搅拌叶片驱动单元中,两个轴承轴支撑在驱动单元的下部,使得它们可以独立地旋转,同时它们的轴线 线路在其一端突出到外部的状态下彼此对准,并且电动机安装在驱动单元的上部。 挖掘和搅拌叶片分别固定到两个轴承轴的外部突出端部,以便当搅拌棒几乎垂直时可垂直地旋转到地面。 从动锥齿轮固定在每个轴承轴的内部,驱动锥齿轮固定在电动机的输出轴上。 驱动锥齿轮与两个从动锥齿轮啮合,以使挖掘和搅拌叶片沿彼此相反的方向旋转。 版权所有(C)2009,JPO&INPIT

    • 9. 发明专利
    • Steel pipe for pipe roof
    • 用于管道屋顶的钢管
    • JP2010018973A
    • 2010-01-28
    • JP2008178614
    • 2008-07-09
    • Data Tou:KkGecoss CorpSanwa Kizai Co LtdTakenaka Doboku Co LtdUemura Giken Kogyo Kkジェコス株式会社三和機材株式会社株式会社データ・トゥ株式会社竹中土木植村技研工業株式会社
    • NISHIYAMA KIICHIHAMANO MAMORUAKIBA TOSHIYASUNISHIGUCHI MASAHITOSANADA SHINICHIONISHI TSUNEYASUMARUTA SHINICHI
    • E21D9/04E21D9/06E21D13/04
    • PROBLEM TO BE SOLVED: To provide a steel pipe for a pipe roof, which enables the two steel pipes to be connected together at an optional spacing, which enables a reduction in construction cost and the shortening of a construction period by virtue of a reduction in the number of steel pipes for construction, which increases an opening area of a cutting edge for performing a drilling operation by a leading end of the steel pipe in a steel pipe push in operation, because a horizontal member for connecting the two steel pipes together is located in the outer-shape height position of the steel pipe, and which can bring about a high degree of accuracy in pipe jacking construction by virtue of proper workability, upper and lower surfaces with many horizontal places, proper planarity, the hardly loosening the surrounding soil, and high rectilinearity.
      SOLUTION: This steel pipe for the pipe roof is used for a pipe roof construction method in which the steel pipes are juxtaposed and inserted into natural ground. The two juxtaposed cylindrical steel pipes 1 and 1 are connected in the upper and lower outer-shape height positions of the steel pipes 1 and 1 on opposed inward surface sides 1a by means of horizontal plate bodies 2 and 2; a vertical partition plate 3 is arranged between the upper and lower horizontal plate bodies 2 and 2 in an intermediate portion between the steel pipes 1 and 1; and a male joint 4 or a female joint 5, which is composed of H-shaped steel, is provided on the outward surface sides 1b of the steel pipes 1 and 1 by connecting edges of flanges of them.
      COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:提供一种用于管道屋顶的钢管,其使得两个钢管能够以可选间隔连接在一起,这使得能够降低施工成本并缩短施工周期 由于用于连接两个钢的水平构件,所以钢管的推进操作中钢管的数量减少,这增加了钢管的前端进行钻削操作的切削刃的开口面积 管道位于钢管的外形高度位置,可以通过适当的可加工性使顶管施工的精度达到高度,具有许多水平位置的上下表面,适当的平面度,几乎不会 松动周围土壤,直线性高。

      解决方案:这种用于管道屋顶的钢管用于管道屋顶施工方法,其中钢管并置并插入自然地面。 两个并列的圆柱形钢管1和1通过水平板体2和2在钢管1和1的上外外高度位置连接在相对的内表面侧1a上; 在钢管1和钢管1之间的中间部分,在上下水平板体2和2之间布置有垂直隔板3; 并且通过它们的凸缘的连接边缘,在钢管1和1的外表面1b上设置由H型钢构成的阳接头4或阴接头5。 版权所有(C)2010,JPO&INPIT

    • 10. 发明专利
    • Installation method of connection pile and pile retaining device
    • 连接桩和桩保持装置的安装方法
    • JP2007224678A
    • 2007-09-06
    • JP2006049792
    • 2006-02-27
    • Sanwa Kizai Co LtdShimizu Corp三和機材株式会社清水建設株式会社
    • NISHIGAMI MASAAKIMATSUMOTO TOSHIKATSUHAMANO MAMORUTORIKAI MITSUTOSHI
    • E02D7/00E02D7/20
    • PROBLEM TO BE SOLVED: To efficiently carry out the work of connecting connection piles in installing connection piles.
      SOLUTION: A preceding pile is passed through a retaining device 1 arranged on the ground surface and made to penetrate the ground at the installation of the connection piles. A subsequent pile is added to the head of the preceding pile while the head is retained by the retaining device, and thereafter the retention of the preceding pile by the retaining device is released and then the whole of the preceding pile connected with the subsequent pile is further made to penetrate the ground. The retaining device is provided with a base frame 2 through which the pile is vertically passed, a grasping mechanism 3 which grasps the pile head, and a push-up mechanism 4 which pushes up the pile by lifting the grasping mechanism relative to the base frame.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:为了有效地执行连接桩在连接桩连接中的连接工作。 解决方案:先前的桩穿过布置在地面上的保持装置1,并在安装连接桩时穿过地面。 在头部由保持装置保持的情况下,将后续的桩加到前一个桩的头部上,然后由保持装置保留前一个桩,然后与随后的桩连接的整个前一个桩是 进一步渗透到地面。 保持装置设置有基部框架2,桩垂直通过该基部框架2,抓握桩头的把持机构3和上推机构4,其通过相对于基架提升抓握机构而向上推动堆 。 版权所有(C)2007,JPO&INPIT