    • 1. 发明专利
    • Method of forming revetment using cylindrical bag body
    • 使用圆柱形袋体形成轮廓的方法
    • JP2005126935A
    • 2005-05-19
    • JP2003361513
    • 2003-10-22
    • Maeda Kosen Co Ltd前田工繊株式会社
    • MAEDA HIDEFUMIYOSHIDA KOICHITAKAGAKI KATSUHIKO
    • E02B3/12E02B3/04
    • PROBLEM TO BE SOLVED: To provide a method of forming a revetment constructible on a plane or a steep slope with sandbags lifted and moved very easily and adjustable in the cushioning degree also at a site.
      SOLUTION: A first cylindrical bag body formed of a mesh sheet material, having an opening M and provided with a hanging part at a side face is placed on a construction object face, and in the arranged state on the construction object face, an inside filling material 4 is filled from the opening M of the cylindrical bag body. After filling, the opening M of the cylindrical bag body is closed, and then a second cylindrical bag body is placed along the first cylindrical bag body. Thereafter such work is sequentially repeated for juxtaposition.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种形成在平面或陡坡上构造的护岸的方法,其中沙袋提升并且移动非常容易并且在缓冲区也可在现场调节。 解决方案:在构造物体表面上放置由具有开口M并在侧面设置有悬挂部的网状片材形成的第一圆柱形袋体,并且在构造物体表面上的布置状态下, 从圆柱形袋体的开口M填充内部填充材料4。 填充后,将圆筒状袋体的开口M封闭,然后沿着第一圆筒状袋体放置第二圆筒状的袋体。 此后,这些工作依次重复并列。 版权所有(C)2005,JPO&NCIPI
    • 2. 发明专利
    • Risk prevention method for land mine
    • 土地风险防范方法
    • JP2007017113A
    • 2007-01-25
    • JP2005201006
    • 2005-07-08
    • Maeda Kosen Co Ltd前田工繊株式会社
    • MAEDA HIDEFUMI
    • F42D5/05D03D1/00
    • F42D5/05F41H11/12
    • PROBLEM TO BE SOLVED: To provide a risk prevention method against a land mine capable of making quickly and surely a land mine buried zone safe, without providing a risk of exploding the land mine positively to be removed.
      SOLUTION: In this risk prevention method when the unexploded land mine is exploded, an explosion preventive fabric sheet 2 having gas permeability or elasticity for moderating pressure in the explosion of the land mine is laid in the ground buried with the unexploded land mine to prevent the risk against the land mine. The explosion preventive fabric sheet 2 may be laid also to be covered with a soil. The explosion preventive fabric sheet 2 may be provided also with an IC chip 7 or a sensor 6.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:为了能够迅速确定地雷埋地区的地雷提供防范风险的措施,不会有积极的地雷爆炸的危险。

      解决方案:在未爆炸地雷爆炸的这种风险防范方法中,将具有透气性或弹性的防爆织物片材2放置在与未爆炸地雷埋地的地雷中, 防止对地雷的风险。 防爆织物片2也可以铺设成被土壤覆盖。 防爆织物片2也可以设置有IC芯片7或传感器6.版权所有:(C)2007,JPO&INPIT

    • 3. 发明专利
    • Civil engineering mat and its construction method
    • 民用工程及其施工方法
    • JP2006045897A
    • 2006-02-16
    • JP2004228011
    • 2004-08-04
    • Maeda Kosen Co Ltd前田工繊株式会社
    • MINAMIMOTO MASASHIUMEDA AKIHIROMAEDA HIDEFUMI
    • E02B3/12
    • PROBLEM TO BE SOLVED: To provide a civil engineering mat and its construction method, capable of surely protecting a revetment and a slope face, by restraining the sliding movement by further increasing frictional resistance with a construction surface. SOLUTION: In this civil engineering mat 1, an installation object is installed on a laying sheet 2 laid on the construction surface by using an installing means. A reinforcing plate 7 for reinforcing installation of the installation object by the installing means, is arranged on the construction surface side of the laying sheet. In the civil engineering mat, an antislipping projection 7a is arranged on the construction surface side of this reinforcing plate. For example, the antislipping projection 7a is an object formed by bending the four corners of the reinforcing plate 7. COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:通过进一步增加施工表面的摩擦阻力,通过限制滑动运动,提供一种能够确保护岸和坡面的土木工程垫及其施工方法。 解决方案:在该土木工程垫1中,通过使用安装装置将安装对象安装在铺设在施工表面上的敷设板2上。 用于通过安装装置加强安装物体的加强板7设置在铺设板的施工表面侧。 在土木工程垫中,在该加强板的构造面侧设置防滑突起7a。 例如,防滑突起7a是通过弯曲加强板7的四个角形成的物体。(C)版权所有(C)2006,JPO&NCIPI
    • 6. 发明专利
    • Retaining wall embankment structure
    • 保留墙体结构
    • JP2011137370A
    • 2011-07-14
    • JP2011033389
    • 2011-02-18
    • Maeda Kosen Co Ltd前田工繊株式会社
    • YOKOTA YOSHIHIROKAWAI HISASHIYOSHIDA KOICHIMAEDA HIDEFUMI
    • E02D17/18E02D29/02
    • PROBLEM TO BE SOLVED: To provide a retaining wall embankment structure, which is free from breakage or rupture due to rusting and excellent in earthquake resistance, can minimize deformation with time while enhancing the stability of an embankment body, and further can reduce the earth pressure acting on a retaining block to improve the stability of the retaining wall block.
      SOLUTION: In the retaining wall embankment structure in which a side surface of a bank of earth is covered by building up a plurality of retaining wall blocks 30, the retaining block 30 having a connecting portion 31 on the back surface thereof, the connecting portion 31 having a plurality of connection holes on the back surface thereof in the height direction; a fiber-made mesh-like strip belt 40 connected to the connection hole; a constraining sheet 90 laid on the slope side of each embankment layer while enclosing an end portion of each embankment layer; and a sheet-like geogrid 70 laid and embedded in each embankment layer are used in combination. A deformation absorption layer is formed between the back surface of the retaining blocks 30 and the bank of earth, the side surface of the bank of earth is covered with a double wall structure composed of the retaining wall blocks 30 and the deformation absorption layer.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:为了提供一种由于生锈而没有破裂或破裂以及抗地震性优异的挡土墙结构,可以随着时间的推移最小化变形,同时提高路基的稳定性,并且还可以减少 作用在挡土块上的土压力可提高挡土墙块的稳定性。 解决方案:在通过建立多个挡土墙块30来覆盖地层的侧面的挡土墙结构中,保持块30在其后表面上具有连接部31, 连接部分31在其后表面上沿高度方向具有多个连接孔; 连接到连接孔的纤维制的网状条带40; 每个路堤层的斜面上放置约束片90,同时包围每个路堤层的端部; 并且组合地铺设并嵌入每个路堤层中的片状土工格栅70。 在保持块30的后表面和地堤之间形成变形吸收层,用保持壁块30和变形吸收层构成的双层壁结构覆盖地层的侧面。 版权所有(C)2011,JPO&INPIT
    • 7. 发明专利
    • Structure for retaining wall and embankment
    • 保留墙和结构的结构
    • JP2011094481A
    • 2011-05-12
    • JP2011033299
    • 2011-02-18
    • Maeda Kosen Co Ltd前田工繊株式会社
    • YOKOTA YOSHIHIROKAWAI HISASHIYOSHIDA KOICHIMAEDA HIDEFUMI
    • E02D17/18E02D29/02
    • PROBLEM TO BE SOLVED: To provide a structure for retaining walls and embankments, which significantly improves the stability of reinforced embankments and retaining wall blocks. SOLUTION: In the a structure for retaining walls and embankments in which a side surface of a bank of earth is covered by piling a plurality of retaining wall blocks, fiber-made strip belts are connected to the back surface of the retaining blocks, the strip belts connected to the retaining blocks are buried in the bank of earth constructed by filling earth on the back side of the retaining blocks, a sheet-like geogrid is laid on the bank of earth, and displacement of each retaining wall block is restrained through the fiber-made strip belts buried in the bank of earth. COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:提供一种用于挡土墙和堤防的结构,这显着地提高了加固路堤和挡土墙的稳定性。 解决方案:在用于通过堆叠多个挡土墙块来覆盖地层的侧面的用于挡土墙和路堤的结构中,纤维制成的带状带连接到保持块的后表面 连接到保持块的带状带被埋在通过在保持块的背面填充土的构造的地层中,将片状土工格栅铺设在地层上,并且每个挡土墙块的位移为 通过埋在地球上的纤维带状带束缚。 版权所有(C)2011,JPO&INPIT