    • 1. 发明专利
    • Concrete floor construction of detached base-isolated house
    • 分离式隔离房屋的混凝土地板结构
    • JP2005351060A
    • 2005-12-22
    • JP2004199910
    • 2004-06-10
    • Kunio AotoYoshikatsu Miura義勝 三浦邦夫 青砥
    • AOTO KUNIOMIURA YOSHIKATSUSHIZUME TAKEJI
    • E04B5/32E04B1/36E04H9/02
    • PROBLEM TO BE SOLVED: To provide a construction method in which a worker does not have to get into a clearance to perform removal work.
      SOLUTION: When placing a concrete form 2 on a foundation 9 in constructing a concrete floor 1, posts 5 tapered toward the tips are erected on the foundation 9, placing the tapered tips on the top side, and sleepers 4 and joists 3 are placed thereon for erection. Before placing the concrete form 2 on the joists 3, the joists 3, the sleepers 4 and the posts 5 are tied with cords 10 or the like, and ends 10a of the cords are put outside from a partially cutout open part of a foundation peripheral cover 11. When the concrete floor 1 is horizontally moved by a jack 12 or the like after the completion of a building, the posts 5 incline, and the joists 3 and the sleepers 4 are displaced sideways and fall. The removal of the posts 5, joists 3 and sleepers 4 that have fallen on the foundation from under the floor is performed by pulling the cords 10a tied in construction.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种施工方法,其中工人不必进入间隙以执行清除工作。

      解决方案:当将混凝土模板2放置在基础9上以构造混凝土地板1时,在基座9上竖立有朝向尖端渐缩的柱5,将锥形尖端放置在顶侧,轨枕4和托梁3 放置在其上用于架设。 在将混凝土板2放置在托梁3上之前,托梁3,轨枕4和支柱5用绳子10等捆扎,绳索的端部10a从基座周边的部分切开的开口部分 盖11。当建筑物完成之后水泥地板1被千斤顶12等水平移动时,柱5倾斜,托梁3和轨枕4侧向移位并下落。 通过拉动结构中的绳子10a来执行从底板下落在基础上的柱5,托梁3和枕木4。 版权所有(C)2006,JPO&NCIPI