    • THE BARGE UNLOADING SYSTEM TECHNICAL FIELD AND BACKGROUND ART
    • 小型卸载系统技术领域和背景技术
    • WO2006120699A3
    • 2007-01-04
    • PCT/IN2006000093
    • 2006-03-14
    • IMAMUDDIN SUDI ABDUL RAHIMAN
    • IMAMUDDIN SUDI ABDUL RAHIMAN
    • B63B35/30
    • B63B35/306B63B35/30B63B35/301
    • A barge emptying system and the method for unloading the granular bulk material from the double bottom barge (500), having plurality of interconnected and partly covered hoppers (502) and having at least one material discharging hopper (601), is floated into a buoyancy compartment (1001) closing the barge access gate (101) operating the pump (WP) and flooding the buoyancy compartment (1001) and floating the loaded barge (500) upwards and at required height floating the barge into another water flooded buoyancy compartment (1002) closing the gate (102) draining the buoyancy compartment (1002) and lowering the barge (500) to engage its plurality of barge anchors (501) into respective plurality of arced slots (1005) of the barge seat (1003) further draining for tilting, resting and anchoring the loaded barge (500) in the barge seat (1003) and sequentially opening the slide gate (1004), the hinged gate (607) at bottom of the barge and the plate gate (602) of the material discharging hopper (601) and emptying the granular contents of the barge (500) into a material receiving silo (2000) and performing reverse operation and returning the empty barge (500) back to water body (100).
    • 驳船排空系统和从具有多个互连和部分覆盖的料斗(502)并且具有至少一个材料排出料斗(601)的双层底部驳船(500)卸载颗粒状散料的方法被漂浮到浮力 (1001),关闭操作泵(WP)的驳船进入门(101)并淹没浮力舱(1001),并将加载的驳船(500)向上浮起并且以所需高度将驳船浮置到另一个水淹浮力舱(1002 关闭排出浮力隔间(1002)的门(102)并降低驳船(500)以将其多个驳船锚定件(501)接合到驳船座(1003)的相应多个弧形槽(1005)中,进一步排水 在驳船座(1003)中倾斜,搁置和锚定装载的驳船(500)并依次打开滑动门(1004),驳船底部的铰接门(607)和排放物料的板门(602) 料斗 (601),并将驳船(500)的颗粒状内容物排空到料仓(2000)中并执行反向操作,并将空驳船(500)返回水体(100)。
    • 4. 发明申请
    • BARGE AND METHOD OF DISCHARGING A LOAD THEREFROM
    • 放弃负载的方法和方法
    • WO2006033640A1
    • 2006-03-30
    • PCT/SG2004/000311
    • 2004-09-24
    • SALAM, Intan
    • GOH, Eng Soon
    • B63B35/30
    • B63B35/28B63B35/30B63B43/06
    • A barge (10a) and method of discharging bulk materials carried on the deck of the barge is provided. The barge has a unitary hull or split hulls. Each hull or component hull has two compartmentalised ballast tanks (22, 23), and each compartment (22a, 22b) has one or more ballasting ports (25a, 25b). Compressed air from a manifold is supplied to each compartment of the ballast tanks. By controlling the supply of compressed air or release of air from each compartment by means of a release valve (34, 35) and opening of the ballasting ports, water is allowed to flow into the first ballast tank or dewatering of the second ballast tank. Such ballasting and/or dewatering of separate and spaced apart ballast tanks allow the centres of gravity and buoyancy to be controlled, and this controlled rolling of the hull allows materials to be discharged from the resulting inclined deck surface.
    • 提供驳船(10a)和排放在驳船甲板上的散装物料的方法。 驳船有一个整体的船体或分裂的船体。 每个船体或部件船体具有两个隔板压载舱(22,23),并且每个隔室(22a,22b)具有一个或多个压载端口(25a,25b)。 来自歧管的压缩空气被供应到压载舱的每个隔间。 通过控制压缩空气的供应或通过释放阀(34,35)从每个隔间释放空气并打开压载口,允许水流入第一压载舱或使第二压载舱脱水。 单独和间隔开的压载舱的这种压载和/或脱水允许控制重心和浮力,并且船体的这种受控轧制允许材料从所产生的倾斜甲板表面排出。
    • 6. 发明申请
    • MARINE FALL PIPE SYSTEM, MARINE VESSEL COMPRISING SUCH FALL PIPE SYSTEM, AND MARINE ROCK PLACEMENT METHOD
    • 海底管道系统,包括这样的管道系统的海洋船舶和海洋岩石铺设方法
    • WO2014098576A1
    • 2014-06-26
    • PCT/NL2013/050902
    • 2013-12-16
    • VAN OORD DREDGING AND MARINE CONTRACTORS B.V.
    • VOORMOLEN, Job Reinier
    • B65G11/08B65G11/14E02D15/10F16L1/12B63B35/30
    • F16L1/123B63B27/28B63B35/305B65G11/146
    • A marine fall pipe system is constructed for placing rock on a sea bed. The fall pipe system comprises a substantially tubular fall pipe, wherein the fall pipe system comprises buoyancy provided such as to, during use, be arranged along the fall pipe so as to at least partially compensate for a weight of the fall pipe system. The buoyancy is preferably provided such as to, during use, being distributed along the fall pipe. The fall pipe system comprises substantially tubular fall pipe sections for making up the fall pipe, the buoyancy being associated with one or more fall pipe sections, and the one or more fall pipe sections with associated buoyancy comprise integral buoyancy. The buoyancy is provided by microspheres integrated in the fall pipe section(s), the microspheres comprising hollow microspheres, especially hollow glass microspheres. The fall pipe sections may comprise bottomless buckets having a top side and a bottom side, an external perimeter of the bottom side being smaller than an internal perimeter of the top side, a top side of one fall pipe section overlapping a bottom side of an adjacent fall pipe section.
    • 建造海洋秋季管道系统将岩石放置在海床上。 落管系统包括基本上管状的落管,其中所述落管系统包括浮力,所述浮力在使用期间沿着所述落管设置,以便至少部分地补偿所述落管系统的重量。 浮力优选地设置成在使用期间沿着落管分配。 落管系统包括用于组成落管的大体上管状的落管部分,浮力与一个或多个下降管段相关联,并且具有相关浮力的一个或多个下降管段包括整体浮力。 浮力由集成在落管部分的微球提供,微球包括中空微球,特别是中空玻璃微球。 落管部分可以包括具有顶侧和底侧的无底桶,底侧的外周边小于顶侧的内周边,一个倒下管段的顶侧与邻近的一侧的底侧重叠 落管部分。