会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明申请
    • POWER CONTROL FOR INITIAL PUSCH FOR eIMTA IN LTE
    • 用于LTE中eIMTA的初始PUSCH功率控制
    • WO2015103732A1
    • 2015-07-16
    • PCT/CN2014/070230
    • 2014-01-07
    • QUALCOMM INCORPORATEDCHEN, WanshiWEI, ChaoGAAL, PeterXU, HaoWANG, Neng
    • CHEN, WanshiWEI, ChaoGAAL, PeterXU, HaoWANG, Neng
    • H04W52/04
    • H04W52/50H04W52/143H04W52/48
    • Certain aspects of the present disclosure relate to methods for power control for initial physical uplink shared channel (PUSCH) for evolved interference management for traffic adaptation (eIMTA) in LTE. The method generally includes participating in a preliminary random access channel (PRACH) procedure with a user equipment (UE) in a system that supports dynamic time division duplexing (TDD) uplink and downlink subframe configuration based on traffic load; and receiving an initial physical uplink shared channel (PUSCH) transmission or re-transmission from the UE, wherein an uplink (UL) power control algorithm for the PUSCH transmission or re-transmission is dependent on whether the PRACH procedure is contention based or non-contention based.
    • 本公开的某些方面涉及用于LTE中用于业务适配(eIMTA)的演进干扰管理的初始物理上行链路共享信道(PUSCH)的功率控制的方法。 该方法一般包括在支持基于业务负载的动态时分双工(TDD)上行链路和下行子帧配置的系统中与用户设备(UE)一起参与初步随机接入信道(PRACH)过程; 以及从所述UE接收初始物理上行链路共享信道(PUSCH)传输或重新传输,其中用于PUSCH传输或重传的上行链路(UL)功率控制算法取决于所述PRACH过程是基于竞争的还是非竞争的, 争用为主。