会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明申请
    • OPEN-HOLE PACKER FOR ALTERNATE PATH GRAVEL PACKING, AND METHOD FOR COMPLETING AN OPEN-HOLE WELLBORE
    • 用于替代路径包装的开孔包装,以及用于完成开孔孔的方法
    • WO2011062669A2
    • 2011-05-26
    • PCT/US2010/046329
    • 2010-08-23
    • EXXONMOBIL UPSTREAM RESEARCH COMPANYHAEBERLE, David, C.BARRY, Michael, D.HECKER, Michael, T.
    • HAEBERLE, David, C.BARRY, Michael, D.HECKER, Michael, T.
    • E21B23/06
    • E21B33/10E21B33/1208E21B33/124E21B43/04
    • Zonal isolation apparatus includes at least one packer assembly and can be used in completing an open-hole portion of a wellbore, which open-hole portion extends through at least two subsurface intervals. The zonal isolation apparatus includes base pipe and filter medium, which together form a sand screen. Each packer assembly comprises at least two mechanically set packer elements. Intermediate the at least two mechanically set packer elements is at least one swellable packer element. The swellable packer element is actuated over time in the presence of a fluid such as water, oil, or a chemical. Swelling may occur should one of the mechanically set packer elements fail. The zonal isolation apparatus also includes alternate flow channel(s) that serve to divert gravel pack slurry from an upper interval to lower intervals during gravel packing operations. A method for completing a wellbore using the zonal isolation apparatus is also provided herein.
    • 区域隔离装置包括至少一个封隔器组件,并且可以用于完成井孔的露天部分,该开孔部分延伸穿过至少两个地下间隔。 区域隔离装置包括基管和过滤介质,它们一起形成砂筛。 每个封隔器组件包括至少两个机械设置的封隔器元件。 中间至少两个机械设置的封隔器元件是至少一个可膨胀的封隔器元件。 在存在诸如水,油或化学物质的流体的情况下,可膨胀的封隔器元件随时间被致动。 如果机械设置的封隔器元件之一发生故障,则可能会发生膨胀。 区域隔离装置还包括用于在砾石包装操作期间将砾石充填浆料从上部间隔转移到较低间隔的交替流动通道。 本文还提供了使用区域隔离装置完成井筒的方法。
    • 5. 发明申请
    • GRAVEL PACKING METHODS
    • GRAVEL包装方法
    • WO2009061542A1
    • 2009-05-14
    • PCT/US2008/073731
    • 2008-08-20
    • EXXONMOBIL UPSTREAM RESEARCH COMPANYYEH, Charles, S.HAEBERLE, David, C.BARRY, Michael, D.HECKER, Michael, T.LONG, Ted, A.
    • YEH, Charles, S.HAEBERLE, David, C.BARRY, Michael, D.HECKER, Michael, T.LONG, Ted, A.
    • E21B41/02
    • E21B17/02E21B43/04E21B43/08
    • A method associated with the production of hydrocarbons is described. The method includes drilling a wellbore using a drilling fluid, conditioning the drilling fluid, running a production string in the wellbore and gravel packing an interval of the wellbore with a carrier fluid. The production string includes a joint assembly comprising a main body portion having primary and secondary fluid flow paths, wherein the main body portion is attached to a load sleeve assembly at one end and a torque sleeve assembly at the opposite end, the load sleeve assembly having at least one transport conduit and at least one packing conduit disposed therethrough. The main body portion may include a sand control device, a packer, or other well tool for use in a downhole environment. The joint assembly also includes a coupling assembly having a manifold region in fluid flow communication with the second fluid flow path of the main body portion and facilitating the make-up of first and second joint assemblies with a single connection.
    • 描述了与烃的生产相关的方法。 该方法包括使用钻井液钻井孔,调节钻井液,在井眼中运行生产线,并用载液流砾石填充井筒间隔。 生产线包括接头组件,该接头组件包括主体部分,该主体部分具有主要和次要流体流动路径,其中主体部分在一端附接到负载套筒组件,在另一端附接到扭矩套筒组件,负载套筒组件具有 至少一个输送管道和至少一个通过其设置的填料导管。 主体部分可以包括用于在井下环境中使用的砂控制装置,封隔器或其它井工具。 接头组件还包括联接组件,其具有与主体部分的第二流体流动路径流体连通的歧管区域,并且有助于通过单个连接件组装第一和第二接头组件。