基本信息:
- 专利标题: WELLBORE METHOD AND APPARATUS FOR COMPLETION, PRODUCTION AND INJECTION
- 专利标题(中):用于完成,生产和注入的井筒方法和装置
- 申请号:PCT/US2006/047997 申请日:2006-12-15
- 公开(公告)号:WO2007092083A2 公开(公告)日:2007-08-16
- 发明人: DALE, Bruce, A. , BARRY, Michael, D. , YEH, Charles, S. , BLACKLOCK, Jon , ROSENBAUM, Darren, F. , HECKER, Michael, T. , HAEBERLE, David, C. , PHI, Manh, V. , SIEGMAN, Michael, J.
- 申请人: EXXONMOBIL UPSTREAM RESEARCH COMPANY , DALE, Bruce, A. , BARRY, Michael, D. , YEH, Charles, S. , BLACKLOCK, Jon , ROSENBAUM, Darren, F. , HECKER, Michael, T. , HAEBERLE, David, C. , PHI, Manh, V. , SIEGMAN, Michael, J.
- 申请人地址: P.O. Box 2189, CORP-URC-SW348, Houston, TX 77252-2189 US
- 专利权人: EXXONMOBIL UPSTREAM RESEARCH COMPANY,DALE, Bruce, A.,BARRY, Michael, D.,YEH, Charles, S.,BLACKLOCK, Jon,ROSENBAUM, Darren, F.,HECKER, Michael, T.,HAEBERLE, David, C.,PHI, Manh, V.,SIEGMAN, Michael, J.
- 当前专利权人: EXXONMOBIL UPSTREAM RESEARCH COMPANY,DALE, Bruce, A.,BARRY, Michael, D.,YEH, Charles, S.,BLACKLOCK, Jon,ROSENBAUM, Darren, F.,HECKER, Michael, T.,HAEBERLE, David, C.,PHI, Manh, V.,SIEGMAN, Michael, J.
- 当前专利权人地址: P.O. Box 2189, CORP-URC-SW348, Houston, TX 77252-2189 US
- 代理机构: FICK, Milton, C. et al.
- 优先权: US60/765,023 20060203; US60/775,434 20060222
摘要:
A method, system and apparatus associated with the production of hydrocarbons are described. The method includes disposing a plurality of sand control devices having a primary flow path and a secondary flowpath within a wellbore adjacent to a subsurface reservoir. A packer having primary and secondary flow paths is then coupled between two of the sand control devices such that the primary and secondary flow paths of the packer are in fluid flow communication with the primary and secondary flowpaths of the sand control devices. The packer is then set within an interval, which may be an open-hole section of the wellbore. With the packer set, gravel packing of the sand control devices in different intervals may be performed. The interval above the packer may be packed before the interval below the packer. A treatment fluid may then be injected into the wellbore via the secondary flow paths of the packer and sand control devices. Then, hydrocarbons are produced from the wellbore by passing hydrocarbons through the sand control devices with the different intervals providing zonal isolation.
摘要(中):
描述了与烃的生产相关的方法,系统和装置。 该方法包括在邻近地下储层的井筒内设置多个具有主流路和次流径的防砂装置。 具有主要和次要流动路径的封隔器然后被联接在两个防砂装置之间,使得封隔器的主要和次要流动路径与沙子控制装置的主要和次要流动路径流体连通。 封隔器然后设置在间隔内,其可以是井眼的露天部分。 使用封隔器,可以执行不同间隔的砂控制装置的砾石包装。 封隔器上方的间隔可以在封隔器之前的间隔之前包装。 然后可以通过封隔器和防砂控制装置的二次流动路径将处理流体注入井眼。 然后,通过使烃通过防砂装置以不同的间隔提供区带隔离从井筒产生烃。