会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明申请
    • SYSTEMS AND METHODS FOR STIMULATING A SUBTERRANEAN FORMATION
    • 用于刺激下层形成的系统和方法
    • WO2012087431A1
    • 2012-06-28
    • PCT/US2011/058989
    • 2011-11-02
    • EXXONMOBIL UPSTREAM RESEARCH COMPANYKELLER, Stuart, R.
    • KELLER, Stuart, R.
    • E21B43/26
    • E21B43/26E21B34/14E21B43/14
    • Systems and methods for supplying a stimulant fluid to a subterranean formation, including apportioning a production liner assembly into a plurality of treatment zones and providing the stimulant fluid to at least an initial treatment zone of the plurality of treatment zones. Apportioning the production liner assembly into the plurality of treatment zones may include utilizing a longitudinal flow control device to fluidly isolate at least a first portion of the plurality of treatment zones from at least a second portion of the plurality of treatment zones and/or placing an outlet of a stimulant fluid supply device proximal a selected treatment zone. May include providing the stimulant fluid through one or more outflow control devices. The systems and methods also may include receiving a reservoir fluid through one or more inflow control devices.
    • 将刺激性流体供应到地下地层的系统和方法,包括将生产衬管组件分配到多个处理区域中,并将刺激性流体提供给多个处理区域的至少初始处理区域。 将生产衬管组件分配到多个处理区域中可以包括利用纵向流动控制装置将多个处理区域的至少第一部分与多个处理区域的至少第二部分流体地隔离和/或放置 刺激性流体供应装置的出口靠近选定的处理区。 可能包括通过一个或多个流出控制装置提供兴奋剂流体。 系统和方法还可以包括通过一个或多个流入控制装置接收储存器流体。
    • 9. 发明申请
    • METHOD FOR RUNNING TUBULARS IN WELLBORES
    • 在管道中运行管道的方法
    • WO2006101606A2
    • 2006-09-28
    • PCT/US2006/003887
    • 2006-02-03
    • EXXONMOBIL UPSTREAM RESEARCH COMPANYKELLER, Stuart, R.MONTGOMERY, John, K.SPIECKER, Paul, M.DALE, Bruce, A.
    • KELLER, Stuart, R.MONTGOMERY, John, K.SPIECKER, Paul, M.DALE, Bruce, A.
    • E21B19/16
    • E21B43/10E21B34/06
    • Methods for installing tubulars (for example, conduits, casing or liners) into a highly deviated wellbore are disclosed. In a first embodiment, the method comprises a) drilling the well to the planned total depth of the interval, b) placing a first fluid into the wellbore below a prescribed measured depth in the high-angle portion of the wellbore, said first fluid having a density that causes the portion of the tubular that extends into the first fluid to become substantially neutrally buoyant, c) placing a second fluid into the wellbore above the prescribed measured depth, said second fluid having a density less than said first fluid, d) plugging the distal portion of the tubular with a lower plug (or check valve) and an upper plug, e) as the tubular is run into the wellbore, placing a lightweight fluid into the plugged section of tubular and a heavy fluid above the plugged section of tubular, and f) running the tubular into the wellbore to the planned total depth.
    • 公开了将管(例如,管道,套管或衬管)安装到高度偏离的井筒中的方法。 在第一实施例中,该方法包括:a)将井钻井到所述间隔的预定总深度,b)将第一流体放置在所述井筒的高角度部分中规定的测量深度以下的所述井筒内,所述第一流体具有 使得延伸到第一流体中的管状部分的密度变得基本上是中性浮力的密度,c)将第二流体置于高于规定测量深度的井眼中,所述第二流体的密度小于所述第一流体,d) 当管状物进入井眼时,用下塞(或止回阀)和上塞塞塞住管状物的远端部分,将轻质流体放置在管状物的堵塞部分中,并在堵塞部分上方形成重质流体 的管状,以及f)将管状物运入井筒至计划的总深度。