会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Diversion system and method
    • 引水系统和方法
    • US07257933B2
    • 2007-08-21
    • US10464114
    • 2003-06-18
    • Arnold Bruce Walters
    • Arnold Bruce Walters
    • E04G21/00
    • E04D13/0725E04D13/064E04D13/076Y10T29/49829Y10T29/5137Y10T29/53383Y10T29/53417
    • In a water diversion system, in a preferred embodiment, a first fold of a deflector is disposed into a first hanger cavity and a second deflector fold is disposed into a second hanger cavity. The first fold of the deflector cooperates with the first cavity of the hanger to allow a resistance hinge-like action of the deflector. The deflector may be lifted open by compression of a curve of the deflector to remove the second fold of the deflector from the second hanger cavity. Methods are provided in which, in a preferred embodiment, a deflector-forming machine is disposed above a trough-forming machine and the deflector-forming machine is moveable forward and backward relative to the trough-forming machine. In another preferred method, material cradles for the respective machines are loaded with coil and disposed relative to each other above the deflector-forming machine that is placed above the trough-forming machine as material for the trough-forming machine passes over at least a portion of the material cradle for the deflector-forming machine. Two-armed run-out stands having upper and lower arms provide work placement for lengths of deflector and trough. Preferably, end caps are two-piece, with one piece fitted to a trough length and a second piece fitted to a deflector length.
    • 在分水系统中,在优选实施例中,偏转器的第一折叠被布置在第一衣架空腔中,并且第二偏转器折叠被设置在第二衣架空腔中。 偏转器的第一折叠件与衣架的第一腔体配合以允许偏转器的电阻铰链状作用。 偏转器可以通过偏转器的曲线的压缩而被提升,以从第二衣架空腔移除偏转器的第二折叠。 提供了一种方法,其中在优选实施例中,偏转器形成机设置在槽形成机上方,并且导流板成形机相对于槽形成机可向前和向后移动。 在另一个优选的方法中,用于各个机器的材料支架装载有线圈并且相对于彼此设置在偏转器成形机上方,所述偏转器成形机被放置在槽形成机上方,因为用于槽形成机的材料通过至少一部分 用于偏转器成型机的材料支架。 具有上臂和下臂的双臂跑出台提供了偏转器和槽的长度的工作安置。 优选地,端盖是两件式的,其中一件安装到槽长度,并且第二件安装到偏转器长度上。
    • 3. 发明授权
    • Water collection tank and filtering system
    • 集水箱和过滤系统
    • US09506226B2
    • 2016-11-29
    • US13608566
    • 2012-09-10
    • Arnold Bruce Walters
    • Arnold Bruce Walters
    • E03B3/03B01D35/027B01D29/88B65D25/04B65D90/02
    • E03B3/03B01D29/88B01D35/0276B65D25/04B65D90/02Y02A20/106Y02A20/108
    • A water collection structure comprises within it first and second sub-chambers and at least one water collection chamber. The first sub-chamber is at least partially bounded by a wall and has extending from it a water input guide configured and arranged to direct water toward a portion of the wall of the first sub-chamber. The second sub-chamber is open to the first sub-chamber and configured to accept a filter. The second sub-chamber is open to a conduit configured for the carriage of water from the second sub-chamber to an output port of the water collection tank. In use a filter disposed in the second sub-chamber preferentially filters water from the first sub-chamber such filtered water being deflected by the wall of the second sub-chamber to fall into the water collection chamber while the debris laden waste water falls out the lower part of the filter into the conduit.
    • 集水结构在其内部包括第一和第二子室以及至少一个水收集室。 第一子室至少部分地由壁限定,并且从其延伸出一个水输入引导件,其被配置和布置成将水引向第一子室的壁的一部分。 第二子室对第一子室开放并被配置为接受过滤器。 第二子室对于构造成用于将水从第二子室运送到收集箱的输出端口的导管开放。 在使用中,设置在第二子室中的过滤器优先地从第一子室过滤水,这样的过滤水被第二子室的壁偏转,以落入收集室中,同时废弃的废液从 过滤器的下部进入导管。
    • 4. 发明申请
    • Water Collection Structure
    • 水收集结构
    • US20140069929A1
    • 2014-03-13
    • US13608566
    • 2012-09-10
    • Arnold Bruce Walters
    • Arnold Bruce Walters
    • B65D25/04
    • E03B3/03B01D29/88B01D35/0276B65D25/04B65D90/02Y02A20/106Y02A20/108
    • A water collection structure comprises within it first and second sub-chambers and at least one water collection chamber. The first sub-chamber is at least partially bounded by a wall and has extending from it a water input guide configured and arranged to direct water toward a portion of the wall of the first sub-chamber. The second sub-chamber is open to the first sub-chamber and configured to accept a filter. The second sub-chamber is open to a conduit configured for the carriage of water from the second sub-chamber to an output port of the water collection tank. In use a filter disposed in the second sub-chamber preferentially filters water from the first sub-chamber such filtered water being deflected by the wall of the second sub-chamber to fall into the water collection chamber while the debris laden waste water falls out the lower part of the filter into the conduit.
    • 集水结构在其内部包括第一和第二子室以及至少一个水收集室。 第一子室至少部分地由壁限定,并且从其延伸出一个水输入引导件,其被配置和布置成将水引向第一子室的壁的一部分。 第二子室对第一子室开放并被配置为接受过滤器。 第二子室对于构造成用于将水从第二子室运送到收集箱的输出端口的导管开放。 在使用中,设置在第二子室中的过滤器优先地从第一子室过滤水,这样的过滤水被第二子室的壁偏转,以落入收集室中,同时废弃的废弃物落在 过滤器的下部进入导管。
    • 6. 发明授权
    • Diversion system and method
    • 引水系统和方法
    • US07895869B2
    • 2011-03-01
    • US11678534
    • 2007-02-23
    • Arnold Bruce Walters
    • Arnold Bruce Walters
    • B21D5/08
    • E04D13/0725E04D13/064E04D13/076Y10T29/49829Y10T29/5137Y10T29/53383Y10T29/53417
    • In a water diversion system, in a preferred embodiment, a first fold of a deflector is disposed into a first hanger cavity and a second deflector fold is disposed into a second hanger cavity. The first fold of the deflector cooperates with the first cavity of the hanger to allow a resistance hinge-like action of the deflector. The deflector may be lifted open by compression of a curve of the deflector to remove the second fold of the deflector from the second hanger cavity. Methods are provided in which, in a preferred embodiment, a deflector-forming machine is disposed above a trough-forming machine and the deflector-forming machine is moveable forward and backward relative to the trough-forming machine. In another preferred method, material cradles for the respective machines are loaded with coil and disposed relative to each other above the deflector-forming machine that is placed above the trough-forming machine as material for the trough-forming machine passes over at least a portion of the material cradle for the deflector-forming machine. Two-armed run-out stands having upper and lower arms provide work placement for lengths of deflector and trough. Preferably, end caps are two-piece, with one piece fitted to a trough length and a second piece fitted to a deflector length.
    • 在分水系统中,在优选实施例中,偏转器的第一折叠被布置在第一衣架空腔中,并且第二偏转器折叠被设置在第二衣架空腔中。 偏转器的第一折叠件与衣架的第一腔体配合以允许偏转器的电阻铰链状作用。 偏转器可以通过偏转器的曲线的压缩而被提升,以从第二衣架空腔移除偏转器的第二折叠。 提供了一种方法,其中在优选实施例中,偏转器形成机设置在槽形成机上方,并且导流板成形机相对于槽形成机可向前和向后移动。 在另一个优选的方法中,用于各个机器的材料支架装载有线圈并且相对于彼此设置在偏转器成形机上方,所述偏转器成形机被放置在槽形成机上方,因为用于槽形成机的材料通过至少一部分 用于偏转器成型机的材料支架。 具有上臂和下臂的双臂跑出台提供了偏转器和槽的长度的工作安置。 优选地,端盖是两件式的,其中一件安装到槽长度,并且第二件安装到偏转器长度上。
    • 7. 发明申请
    • Diversion System and Method
    • 引水系统和方法
    • US20070130842A1
    • 2007-06-14
    • US11678534
    • 2007-02-23
    • A. B. Walters
    • A. B. Walters
    • E04D13/00
    • E04D13/0725E04D13/064E04D13/076Y10T29/49829Y10T29/5137Y10T29/53383Y10T29/53417
    • In a water diversion system, in a preferred embodiment, a first fold of a deflector is disposed into a first hanger cavity and a second deflector fold is disposed into a second hanger cavity. The first fold of the deflector cooperates with the first cavity of the hanger to allow a resistance hinge-like action of the deflector. The deflector may be lifted open by compression of a curve of the deflector to remove the second fold of the deflector from the second hanger cavity. Methods are provided in which, in a preferred embodiment, a deflector-forming machine is disposed above a trough-forming machine and the deflector-forming machine is moveable forward and backward relative to the trough-forming machine. In another preferred method, material cradles for the respective machines are loaded with coil and disposed relative to each other above the deflector-forming machine that is placed above the trough-forming machine as material for the trough-forming machine passes over at least a portion of the material cradle for the deflector-forming machine. Two-armed run-out stands having upper and lower arms provide work placement for lengths of deflector and trough. Preferably, end caps are two-piece, with one piece fitted to a trough length and a second piece fitted to a deflector length.
    • 在分水系统中,在优选实施例中,偏转器的第一折叠被布置在第一衣架空腔中,并且第二偏转器折叠被设置在第二衣架空腔中。 偏转器的第一折叠件与衣架的第一腔体配合以允许偏转器的电阻铰链状作用。 偏转器可以通过偏转器的曲线的压缩而被提升,以从第二衣架空腔移除偏转器的第二折叠。 提供了一种方法,其中在优选实施例中,偏转器形成机设置在槽形成机上方,并且导流板成形机相对于槽形成机可向前和向后移动。 在另一个优选的方法中,用于各个机器的材料支架装载有线圈并且相对于彼此设置在偏转器成形机上方,所述偏转器成形机被放置在槽形成机上方,因为用于槽形成机的材料通过至少一部分 用于偏转器成型机的材料支架。 具有上臂和下臂的双臂跑出台提供了偏转器和槽的长度的工作安置。 优选地,端盖是两件式的,其中一件安装到槽长度,并且第二件安装到偏转器长度上。
    • 8. 发明授权
    • Diversion system and method
    • 引水系统和方法
    • US06880294B2
    • 2005-04-19
    • US10105099
    • 2002-03-22
    • A. B. Walters
    • A. B. Walters
    • E04D13/072E04D13/076E04D13/00
    • E04D13/0725E04D13/064E04D13/076Y10T29/49829Y10T29/5137Y10T29/53383Y10T29/53417
    • Methods are provided for installation of a rain diversion system including formation of a deflector with a machine placed above a forming machine dedicated to formation of a trough. As trough is run from a first machine, end caps are installed where appropriate, outlet sites are punched and outlets installed for joinder with downspouts, miters are cut and a cavity structure of the hanger is brought into place to mate a containment lip of the hanger with the containment shelf of the trough. Corresponding deflector is run from a second machine and the deflector is placed on the trough as deflector attachment cavities of the hanger are used to retain deflector. In alternative methods, one cavity retains the deflector 40 for conveyance to the installation location on the structure. In either case, the entire assembly may then be transported to a location on a lower level such as ground, for example, corresponding to the eventual installation location on the structure. The process is repeated until all assemblies of trough, hangers and deflector have been processed. Installers are then employed on ladders or other riser to position each length of assembled trough, hangers, and deflector into place against the structure where the assembly is fastened into place in at least two locations. This is simplified by the disclosed feature that allows compression fitting of the deflector into the appropriate cavities of the hanger.
    • 提供了一种用于安装雨水分流系统的方法,包括在设置在专门用于形成槽的成形机上方的机器上形成偏转器。 当槽从第一台机器运行时,端盖安装在适当的地方,出口部位被冲孔,并且出口安装用于与下水道连接的连接器,切割器,并且将衣架的空腔结构置于适当位置以配合衣架的容纳口 与槽的收容架。 相应的偏转器从第二机器运行,并且偏转器被放置在槽上,因为悬挂器的偏转器附接空腔用于保持偏转器。 在替代方法中,一个空腔保持偏转器40用于输送到结构上的安装位置。 在任一情况下,整个组件然后可以被传送到诸如地面的较低水平的位置,例如对应于结构上的最终安装位置。 重复该过程,直到所有的槽,衣架和偏转器的组件都被处理。 然后将安装件用于梯子或其它提升管上,以将每个长度的组装的槽,悬挂器和导流器放置在适当位置,将组件固定在至少两个位置中的位置。 通过所公开的特征简化了这一点,该特征允许偏转器压缩配合到衣架的适当空腔中。