会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明授权
    • System and method with multi-axis tilting
    • 多轴倾斜的系统和方法
    • US09468944B2
    • 2016-10-18
    • US14281229
    • 2014-05-19
    • SST Systems, Inc.
    • Chad Martin AndreaeBradley M. AndreaeBradley S. Andreae
    • B05C3/02B05C3/10B05D1/18B65G49/00B65G49/04C25D17/06C25D13/22
    • B05C3/10B05C3/02B05D1/18B65G49/04B65G49/0413B65G49/0459B65G49/0463C25D13/22C25D17/06
    • A system includes a plurality of stations positioned along a direction of conveyance. Rails span the length of all stations and include at least first, second, and third rails configured for independent vertical movement. A plurality of objects is supported by and movable along the first, second, and third rails between the stations. Each of the plurality of objects has first, second, and third supports coupled to the respective first, second, and third rails so that all of the plurality of objects tilt in unison about a first set of parallel axes in response to the first, second, and third rails being positioned in a first configuration of vertical heights, and all of the plurality of objects tilt in unison about a second set of parallel axes in response to the first, second, and third rails being positioned in a second configuration of vertical heights.
    • 系统包括沿着输送方向定位的多个站。 轨道跨越所有车站的长度,并包括至少配置为独立垂直运动的第一,第二和第三轨道。 多个物体由站之间的第一,第二和第三轨道支撑并可移动。 多个物体中的每一个具有联接到相应的第一,第二和第三轨道的第一,第二和第三支撑件,使得响应于第一,第二和第三轨道,所有多个物体中的所有多个物体围绕第一组平行轴线一致地倾斜 并且第三轨道被定位在垂直高度的第一构造中,并且响应于第一,第二和第三轨道被定位在垂直的第二配置中,所有多个物体围绕第二组平行轴线一致地倾斜 高度。
    • 3. 发明申请
    • METHOD AND APPARATUS FOR DRAINING A WORK PIECE DURING FINISHING
    • 用于在整理期间排出工作层的方法和装置
    • US20160177975A1
    • 2016-06-23
    • US14975218
    • 2015-12-18
    • SST Systems, Inc.
    • Brad Martin AndreaeChad Martin AndreaeRobert G. Rock
    • F04F10/00
    • F04F10/00
    • A method of processing a work piece having an enclosure. The method comprises inserting a siphon into the enclosure, submerging the work piece in an immersion tank, removing the work piece from the tank, and draining liquid from the enclosure through the siphon. Inserting can include positioning at least a portion of a short leg of the siphon in the enclosure of the work piece. Preferably, draining includes directing liquid back into the immersion tank. After draining, the work piece can be moved to a second workstation and/or the siphon can be withdrawn from the enclosure. The method can be performed using a finishing system comprising a primary carrier, a work piece suspended from the primary carrier and defining an enclosure, and a siphon positioned in the enclosure. Preferably, the work piece is suspended above an immersion tank. The siphon can be positioned to direct fluid toward the immersion tank.
    • 一种处理具有外壳的工件的方法。 该方法包括将虹吸管插入外壳,将工件浸入浸没池中,从罐中取出工件,并通过虹吸将液体从外壳排出。 插入可以包括将虹吸管的短腿的至少一部分定位在工件的外壳中。 优选地,排水包括将液体引回到浸没池中。 排水后,工件可以移动到第二个工作站和/或虹吸管可以从外壳中取出。 该方法可以使用包括主载体,从主载体悬挂并限定外壳的工件和定位在外壳中的虹吸的精加工系统来执行。 优选地,工件悬挂在浸没池的上方。 虹吸管可以定位成将流体导向浸入池。