会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明授权
    • Pre-plating of wooden railroad ties
    • 木制铁丝网预镀
    • US06292997B1
    • 2001-09-25
    • US09322280
    • 1999-05-28
    • Robert OllendickDavid Ollendick
    • Robert OllendickDavid Ollendick
    • B23Q300
    • E01B29/06E01B3/02E01B29/32Y10T29/49829Y10T29/49833Y10T29/49895
    • Methods are disclosed by which wooden railroad ties are pre-plated prior to use in constructing and/or repairing railroad lines. Methodology disclosed comprises placing two plates on top of each of a succession of wooden ties, temporarily positioning disclosed one of the two plates on each tie with a distance or spacer template temporarily clamping the two plates accurately to the tie using a jig, starting a field spike and a gauge spike (usually with one or more sledge hammers) into each wooden tie through the selected apertures in each plate, and further driving the started spikes into the associated tie (usually using a jackhammer). Typically, the field spike is located outside the field flange of the plate and is driven until the head of the spike is contiguous with the plate. Typically, the gauge spike is displaced through an aperture in the gauge flange of the plate until the head is about 1½ inches above the plate.
    • 公开了在用于构建和/或修理铁路线之前将木制铁轨连接件预镀的方法。 所公开的方法包括将两个板放置在一系列木制领带的每一个的顶部上,临时将两个板中的一个板放置在每个连接带上,其间距离或间隔板模板使用夹具临时将两个板材准确地夹紧到系带上, 通过每个板中的所选择的孔,将每个木制领带中的尖头和尺寸钉(通常具有一个或多个猛击锤)进一步驱动到相关联的绑带中(通常使用手提锤)。 通常,场穗位于板的场法兰外部,并被驱动直到穗的头部与板连续。 通常,量规钉通过板的量规凸缘中的孔移动,直到头部在板上方约1½英寸处。
    • 4. 发明授权
    • Pre-plating of wooden railroad ties
    • 木制铁丝网预镀
    • US06681474B2
    • 2004-01-27
    • US10293161
    • 2002-11-12
    • Robert OllendickDavid Ollendick
    • Robert OllendickDavid Ollendick
    • B23Q300
    • E01B29/06E01B3/02E01B29/32Y10T29/49829Y10T29/49833Y10T29/49895
    • Apparatus and methods are disclosed by which wooden railroad ties are pre-plated prior to use in constructing and/or repairing railroad lines. Methodology disclosed comprises placing two plates on top of each of a succession of wooden ties, temporarily positioning disclosed one of the two plates on each tie with a distance or spacer template temporarily clamping the two plates accurately to the tie using a jig, starting a field spike and a gauge spike (usually with one or more sledge hammers) into each wooden tie through the selected apertures in each plate, and further driving the started spikes into the associated tie (usually using a jackhammer). Typically, the field spike is located outside the field flange of the plate and is driven until the head of the spike is contiguous with the plate. Typically, the gauge spike is displaced through an aperture in the gauge flange of the plate until the head is about 1½ inches above the plate.
    • 公开了在用于构建和/或修理铁路线之前将木制铁轨连接件预镀的装置和方法。 所公开的方法包括将两个板放置在一系列木制领带的每一个的顶部上,临时将两个板中的一个板放置在每个连接带上,其间距离或间隔板模板使用夹具临时将两个板材准确地夹紧到系带上, 通过每个板中的所选择的孔,将每个木制领带中的尖头和尺寸钉(通常具有一个或多个猛击锤)进一步驱动到相关联的绑带中(通常使用手提锤)。 通常,场穗位于板的场法兰外部,并被驱动直到穗的头部与板连续。 通常,量规钉通过板的量规凸缘中的孔移动,直到头部在板上方约1½英寸处。
    • 5. 发明授权
    • Pre-plating of wooden railroad ties
    • 木制铁丝网预镀
    • US06546612B2
    • 2003-04-15
    • US09888794
    • 2001-06-25
    • Robert OllendickDavid Ollendick
    • Robert OllendickDavid Ollendick
    • B21D3903
    • E01B29/06E01B3/02E01B29/32Y10T29/49829Y10T29/49833Y10T29/49895
    • Apparatus and methods are disclosed by which wooden railroad ties are pre-plated prior to use in constructing and/or repairing railroad lines. Methodology disclosed comprises placing two plates on top of each of a succession of wooden ties, temporarily positioning disclosed one of the two plates on each tie with a distance or spacer template temporarily clamping the two plates accurately to the tie using a jig, starting a field spike and a gauge spike (usually with one or more sledge hammers) into each wooden tie through the selected apertures in each plate, and further driving the started spikes into the associated tie (usually using a jackhammer). Typically, the field spike is located outside the field flange of the plate and is driven until the head of the spike is contiguous with the plate. Typically, the gauge spike is displaced through an aperture in the gauge flange of the plate until the head is about 1½ inches above the plate.
    • 公开了在用于构建和/或修理铁路线之前将木制铁轨连接件预镀的装置和方法。 所公开的方法包括将两个板放置在一系列木制领带的每一个的顶部上,临时将两个板中的一个板放置在每个连接带上,其间距离或间隔板模板使用夹具临时将两个板材准确地夹紧到系带上, 通过每个板中的所选择的孔,将每个木制领带中的尖头和尺寸钉(通常具有一个或多个猛击锤)进一步驱动到相关联的绑带中(通常使用手提锤)。 通常,场穗位于板的场法兰外部,并被驱动直到穗的头部与板连续。 通常,量规钉通过板的量规凸缘中的孔移动,直到头部在板上方约1½英寸处。
    • 7. 发明申请
    • Securing spikes in pre-existing loosened spike cavities in railroad ties
    • 在铁路连接中预先存在松动的穗孔保护尖峰
    • US20070246558A1
    • 2007-10-25
    • US11410639
    • 2006-04-25
    • David Ollendick
    • David Ollendick
    • E01B13/00
    • E01B29/26
    • Technology is disclosed by which loosened railroad spikes may be re-secured in pre-existing spike cavities in reconditioned or repaired railroad ties, i.e. novel, facile, on-site, non-complex, miniaturized pre-packaged, clean, non-labor intensive, non-equipment intensive ways of bonding or polymerizing pre-existing previously used railroad spike cavities in the field for again receiving railroad spikes in a secure manner, so as to repair damaged spike cavity walls and prevent moisture infiltration. Frangibly encapsulated bonding agent or polymerizable resin placed in pre-existing spike cavities is preferred.
    • 公开了技术,其中松动的铁路尖峰可能被重新固定在修复或修理的铁路连接中的预先存在的尖峰腔中,即新颖,便利,现场,非复杂,小型化的预包装,清洁,非劳动密集型 非现场使用的先前使用过的铁路尖峰腔的非设备密集方式可以以安全的方式再次接收铁路钉,从而修复损坏的尖峰腔壁并防止水分渗透。 放置在预先存在的尖峰腔中的易封装的粘合剂或可聚合树脂是优选的。