    • Cement compositions comprising aromatic sulfonated polymers and methods of using the same
    • 包含芳族磺化聚合物的水泥组合物及其使用方法
    • US20060081373A1
    • 2006-04-20
    • US10966937
    • 2004-10-15
    • Ashok SantraB. ReddyRussell Fitzgerald
    • Ashok SantraB. ReddyRussell Fitzgerald
    • E21B33/138
    • C04B28/02C04B24/163C09K8/493
    • A method of servicing a wellbore that penetrates a subterranean formation includes displacing a cement composition comprising an aromatic sulfonated polymer into the wellbore and allowing the cement composition to set. In an embodiment, a transition time of the cement composition is less than or equal to about 60 minutes, alternatively less than or equal to about 50 minutes, less than or equal to about 40 minutes, less than or equal to about 30 minutes, less than or equal to about 20 minutes, or less than or equal to about 10 minutes. Thus, the transition time may be short enough to inhibit a substantial amount of gas migration into the cement composition before it sets. In yet another embodiment, the cement composition exhibits a viscosity that increases from a value of 35 Bc (Bearden units) to about 100 Bc in about 10 minutes or less when the cement composition sets.
    • 维护渗透地下地层的井筒的方法包括将包含芳族磺化聚合物的水泥组合物置于井眼中并使水泥组合物凝固。 在一个实施方案中,水泥组合物的过渡时间小于或等于约60分钟,或者小于或等于约50分钟,小于或等于约40分钟,小于或等于约30分钟,更少 大于或等于约20分钟,或小于或等于约10分钟。 因此,过渡时间可能足够短以在其组合之前抑制大量气体迁移到水泥组合物中。 在另一个实施方案中,当水泥组合物组合时,水泥组合物表现出在大约10分钟或更短时间内从35Bc(Bearden单元)的值增加到约100Bc的粘度。
    • 6. 发明申请
    • Methods of generating a gas in a plugging composition to improve its sealing ability in a downhole permeable zone
    • 在封堵组合物中产生气体以提高其在井下渗透区域中的密封能力的方法
    • US20060084580A1
    • 2006-04-20
    • US10967121
    • 2004-10-18
    • Ashok SantraB. ReddyFrank ZamoraGiddo Antonio GomezRonnie MorganMark Savery
    • Ashok SantraB. ReddyFrank ZamoraGiddo Antonio GomezRonnie MorganMark Savery
    • E21B43/00E21B33/00
    • C09K8/516E21B33/138
    • Methods of servicing a wellbore include generating gas in a plugging composition in situ within a permeable zone in the wellbore, thereby improving the ability of the plugging composition to seal the permeable zone. The gas may be generated via a chemical reaction by, for example, introducing first and second reactants to the plugging composition that can react at ambient temperatures in the wellbore. In an embodiment, the first and second reactants are concurrently pumped into the wellbore via separate flow paths within two concentric conduits to the permeable zone where they are allowed to contact each other in the presence of the plugging composition. In another embodiment, the first reactant, the second reactant, and a retarder for slowing the reaction between the two reactants are concurrently pumped to the permeable zone. In yet another embodiment, one of the reactants is encapsulated to delay a reaction between the two reactants.
    • 维护井筒的方法包括在井筒内的可渗透区域内原位生成堵塞组合物中的气体,从而提高堵塞组合物密封可渗透区域的能力。 可以通过例如将第一和第二反应物引入到可在井眼中的环境温度下反应的堵塞组合物的化学反应来产生气体。 在一个实施方案中,第一和第二反应物同时通过在渗透区域的两个同心管道内的分离的流动路径泵送到井筒中,在渗透区域允许它们在堵塞组合物的存在下彼此接触。 在另一个实施方案中,用于减缓两种反应物之间的反应的第一反应物,第二反应物和延迟剂同时泵送到可渗透区域。 在另一个实施方案中,一种反应物被包封以延迟两种反应物之间的反应。