会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • FENCING PANEL AND METHOD OF ASSEMBLY
    • 熨平板和组装方法
    • US20160145892A1
    • 2016-05-26
    • US14612418
    • 2015-02-03
    • James E. McCartyKurt Rathjen
    • James E. McCartyKurt Rathjen
    • E04H17/16E04H17/14
    • E04H17/14E04H17/1413E04H17/165E04H17/18E04H17/20E04H17/22E04H2017/1447E04H2017/146E04H2017/1491
    • A method of assembling a dynamically adjustable fencing panel that includes pivotally joining a crossmember first end to a first support post via a first and second arm extending therefrom in parallel, where the first and second arms each have a hole formed therethrough in a respective coaxial arrangement and the first support post includes a footer for substantially inhibiting ground penetration below ground level. The method further includes pivotally joining a crossmember second end to a second support post via a third and fourth arm extending therefrom in parallel, where the third and fourth arms each have a hole formed therethrough in a respective coaxial arrangement and the second support post includes a footer for substantially inhibiting ground penetration below the ground level, where the pivotally joined first and second crossmember ends facilitate a continuously pivotal linkage between the first support post and the second support post.
    • 一种组装动态可调节的围栏的方法,其包括:通过从其平行延伸的第一和第二臂将横梁成员第一端枢转地连接到第一支撑柱,其中所述第一和第二臂各自具有穿过其形成的各自的同轴布置 并且第一支撑柱包括用于基本上抑制地平面以下的地面穿透的底脚。 该方法还包括通过平行延伸的第三和第四臂将十字形构件第二端枢转地连接到第二支撑柱,其中第三和第四臂各自具有在相应的同轴布置中穿过其形成的孔,并且第二支撑柱包括 用于基本上禁止在地平面下方的地面穿透,其中所述枢转连接的第一和第二横梁端部有助于在所述第一支撑柱和所述第二支撑柱之间的连续的枢转连杆。