会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明申请
    • Fencing and Fencing Mountings
    • 击剑和击剑安装
    • US20080315169A1
    • 2008-12-25
    • US10593379
    • 2005-03-18
    • Peter John McNeill
    • Peter John McNeill
    • E04H17/22
    • E04H17/18E01F9/692E04H12/2238E04H17/161E04H17/165
    • The invention provides a temporary fence including a barrier assembly comprising one or more posts (103), one or more fence panels (101) mounted thereon and one or more anchors (120) to anchor the posts consisting of two elements (112) that have a cleft (109) between them when assembled, there are also anchors (913) having a first post mounting (921) for the post of a first fence and a spaced apart second mounting (922) for a post of a second fence. Also there is a mounting bracket mounted on a post (916) of a first fence for receiving an upper portion of a second fence (920) an with attachment means at its distal end (924) from the first post such that when assembled the upper attached portion of the second fence is disposed generally vertically above a base portion of the second fence. There is further provided a mounting device for mounting a fence to a fence post including a main body (970) with an attachment (972) on it to which a fence can be releasably secured this device also including a releasable clamp (84, 85) attachable to a post so that at least a portion of the fence may be received in the clamp and be releasably retained adjacent the post.
    • 本发明提供了一种临时围栏,其包括一个障碍组件,该障碍组件包括一个或多个柱(103),一个或多个安装在其上的围栏面板(101)和一个或多个锚固件(120),以锚定由两个元件(112) 当组装时,它们之间的间隙(109)也包括锚(913),其具有用于第一挡板的柱的第一柱安装件(921)和用于第二挡板的柱的间隔开的第二安装件(922)。 还有一种安装支架,其安装在第一挡板的支柱(916)上,用于接收第二挡板(920)的上部,并在其远端(924)处与第一支柱相连接,使得当组装时,上部 第二挡板的附接部分大致竖直设置在第二围栏的基部上方。 还提供了一种用于将栅栏安装到围栏柱的安装装置,该栏杆包括具有其上的附件(972)的主体(970),栅栏可拆卸地固定到该主体上,该装置还包括可释放的夹具(84,85) 可附接到柱上,使得栅栏的至少一部分可以被容纳在夹具中并且可释放地保持在柱附近。
    • 4. 发明授权
    • System for screening off and a method of mounting thereof
    • 筛选系统及其安装方法
    • US07461489B2
    • 2008-12-09
    • US10517484
    • 2003-06-04
    • Ronny Herbertsson
    • Ronny Herbertsson
    • E04H1/00E04H17/16E04H17/00E04C3/00
    • E04H17/165
    • In a system for screening off an area, a partition element substantially covers the space between two upstanding carrier elements. The partition element is catchable in the carrier elements in a temporary, unstable preparatory position. The partition element lacks the capability of remaining in the preparatory position by its own force. The partition element is further movable from the preparatory position to a fixedly locked position in the carrier elements. In a method of mounting and dismounting of a partition element on two upstanding carrier elements, the partition element is hooked in the carrier elements in the preparatory position. Thereafter, the partition element is moved to a fixedly locked position in the carrier elements.
    • 在用于筛选区域的系统中,分隔元件基本上覆盖两个直立的载体元件之间的空间。 在暂时的,不稳定的准备位置,分隔元件在载体元件中是可捕获的。 分隔件本身没有能力保留在准备位置。 分隔元件还可从准备位置移动到载体元件中的固定锁定位置。 在两个直立的载体元件上安装和拆卸分隔元件的方法中,分隔元件被钩在预备位置的载体元件中。 此后,分隔元件移动到载体元件中的固定锁定位置。
    • 8. 发明申请
    • Safety Barrier for a Deck or Porch
    • 甲板或门廊的安全栅栏
    • US20160222694A1
    • 2016-08-04
    • US15015589
    • 2016-02-04
    • Marhaygue, LLC
    • Guerry E. Green
    • E04H17/02E04H17/16E01F13/02E04H17/08
    • E04H17/02E01F13/028E04F11/1861E04H17/08E04H17/165
    • A safety barrier is formed of framing, including a guard rail that defines the infill below the rail without the use of pickets. The infill is covered with mesh screen, which may be made of nylon which has greater tensile strength than conventional fiberglass. The mesh screen is held to the framing by an extruded base. The base has a central channel between two flat spline grooves. Flat splines hold mesh screen in their respective grooves more securely than conventional friction-based channel splines. A metal plate is positioned in the central channel to enables screws that secure the base to be tightened to hold it to the framing better. The elimination of pickets in the infill leaves the view unobstructed and allows other treatments of that portion of a deck or porch that are more aesthetically pleasing without compromising safety.
    • 安全屏障由框架形成,包括在不使用支柱的情况下将导轨限定在轨道下方的护栏。 填充物用网眼覆盖,其可以由尼龙制成,其比常规玻璃纤维具有更大的拉伸强度。 筛网通过挤压基座固定在框架上。 基座具有两个平坦花键槽之间的中心通道。 扁平花键在其相应的凹槽中比常规的基于摩擦的通道花键更牢固地固定网状筛网。 金属板定位在中心通道中,以使得能够固定基座的螺钉被紧固以更好地将其保持在框架上。 在填充物中消除纠察使视图畅通无阻,并且允许在美观上令人愉快的甲板或门廊部分的其他处理,而不会影响安全性。
    • 9. 发明申请
    • A Barricade System
    • 路障系统
    • US20160047141A1
    • 2016-02-18
    • US14779962
    • 2014-03-26
    • Ben JUETT
    • Ben Juett
    • E04H17/18E06B11/02E05C1/10E05B65/00E05D15/26E04H17/16E06B11/04
    • E04H17/18E04H17/165E05B65/0007E05C1/10E05D15/266E06B11/022E06B11/04
    • A barricade system comprises a barrier assembly, a floor assembly, a floor locking assembly, and a manipulating assembly configured for engagement with the floor locking assembly. The barrier assembly is collapsible and defines an enclosure when erected. The floor assembly is configured for location within the enclosure and removal from the enclosure. The barrier assembly supports the floor assembly. The floor locking assembly is operable between a locked condition in which the floor assembly is locked to the barrier assembly and an unlocked condition in which the floor assembly can be removed from the enclosure. The manipulating assembly engages with the floor locking assembly to operate the floor locking assembly to unlock the floor assembly. The manipulating assembly and floor locking assembly being configured so that engagement of the manipulating assembly with the floor locking assembly is substantially limited to a condition in which the barrier assembly is erected.
    • 路障系统包括障碍组件,地板组件,地板锁定组件和构造成与地板锁定组件接合的操纵组件。 屏障组件是可折叠的,并且在竖立时限定外壳。 地板组件被配置为在外壳内定位并从外壳移除。 屏障组件支撑地板组件。 地板锁定组件可在其中地板组件锁定到屏障组件的锁定状态和可从壳体移除地板组件的解锁状态之间操作。 操纵组件与地板锁定组件接合以操作地板锁定组件以解锁地板组件。 操纵组件和地板锁定组件被构造成使得操作组件与地板锁定组件的接合基本上被限制在其中架设障碍组件的状态。