会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Instrument mounting system with dual encoders
    • 带双编码器的仪器安装系统
    • US07228253B2
    • 2007-06-05
    • US10922118
    • 2004-08-19
    • Jack Chin Chuan ChenNai Chang Liu
    • Jack Chin Chuan ChenNai Chang Liu
    • G01C9/00G01C17/00G01C19/00G06F15/00
    • G02B7/1827G02B23/16
    • The present invention provides a way to measure the position of an instrument that is mounted on an instrument shaft within a clutched mounting system, the instrument shaft being driven through a reduction gearbox by a motor shaft. The position of the instrument is measured as a function of the position of the motor shaft and the position of the instrument shaft, the measurement of the position of the motor shaft providing greater precision than the position of the instrument shaft. Because the mounting system is clutched, it is necessary to check at intervals whether the measurement of the motor shaft position no longer accurately represents the position of the instrument, in which case the measurement of the motor shaft position is resynchronized to the measurement of the instrument shaft.
    • 本发明提供了一种测量安装在离合式安装系统中的仪表轴上的仪器的位置的方法,仪器轴通过电动机轴被驱动通过减速齿轮箱。 仪器的位置是根据电机轴的位置和仪器轴的位置来测量的,电机轴位置的测量提供比仪器轴位置更高的精度。 因为安装系统是紧固的,所以需要间隔检查电机轴位置的测量是否不再准确地表示仪器的位置,在这种情况下,电机轴位置的测量与仪器的测量重新同步 轴。
    • 3. 发明授权
    • In situ regeneration of the first wall of a deuterium-tritium fusion
device
    • 氚 - 氚融合装置的第一壁的原位再生
    • US4145250A
    • 1979-03-20
    • US661700
    • 1976-02-26
    • Tihiro OhkawaJack Chin
    • Tihiro OhkawaJack Chin
    • G21B1/25H05H1/12G21B1/00H01J9/395
    • H05H1/12G21B1/25Y02E30/126
    • The first wall of a deuterium-tritium fusion reactor is regenerated in situ. The first wall substantially surrounds an enclosed reaction region confined within the reaction chamber of the reactor. To regenerate a worn first wall without opening the reactor chamber, a gaseous substance is introduced into the chamber, at least a portion of the gaseous substance comprising material, such as low Z refractory material, suitable for forming the first wall. At least a portion of this material is deposited, as by pyrolysis, in solid form on the first wall to regenerate the first wall, and residual gas is removed from the chamber. The chamber is then recharged with a mixture of deuterium and tritium. All the while the inflow of contaminants into the chamber is substantially excluded. Preferably, the pyrolysis of the gaseous substance is effected by energizing the coils used in the operation of the reactor for producing a plasma of deuterium and tritium ions in the reaction chamber.
    • 氚 - 氚聚变反应器的第一壁原位再生。 第一壁基本上围绕限制在反应器的反应室内的封闭反应区域。 为了在不打开反应器室的情况下再生破旧的第一壁,将气体物质引入室中,至少一部分气态物质包括适于形成第一壁的材料,例如低Z耐火材料。 这种材料的至少一部分如通过热解在第一壁上以固体形式沉积,以再生第一壁,并且从室中除去残余气体。 然后将该室用氘和氚的混合物再充电。 一直以来,污染物进入室的流入基本上被排除在外。 优选地,气态物质的热解通过在反应器的操作中激励用于产生氘和氚离子等离子体的反应器的线圈来实现。