热词
    • 6. 发明授权
    • Method for installing the hoisting roping of an elevator
    • 安装升降机起吊绳的方法
    • US08720032B2
    • 2014-05-13
    • US13293887
    • 2011-11-10
    • Gert Van der MeijdenJos Van den Heuvel
    • Gert Van der MeijdenJos Van den Heuvel
    • B21D39/03B23P11/00
    • B66B19/02Y10T29/49826Y10T29/49828
    • The object of the invention is a method for installing the hoisting roping of an elevator, in which method the hoisting roping of the elevator is lifted upwards into the elevator hoistway by means of a hoisting device. The hoisting roping is lifted upwards into the elevator hoistway in steps such that at least one rope of the roping is lifted by pulling it to the height and the aforementioned at least one rope is fixed to the elevator hoistway or to another fixed structure of the building, at least one of the ropes of the roping that is at the height and was lifted in phase is detached, at least one rope detached in phase is lifted by pulling it to the next height and the aforementioned at least one rope is fixed to the elevator hoistway or to another fixed structure of the building.
    • 本发明的目的是提供一种用于安装电梯的起重绳索的方法,其中通过提升装置将电梯的起重绳索向上提升到电梯井道中。 起重绳索以梯级向上提升到电梯井道中,使得至少一根绳索通过将其拉到高度而提升,并且上述至少一根绳索固定到电梯井道或建筑物的另一固定结构 绳索的绳索中的至少一个处于高度并相位被提升的同时被拆卸,通过将至少一个脱离相同的绳索拉到下一个高度而将上述的至少一根绳索固定到 电梯井道或建筑物的另一固定结构。
    • 9. 发明申请
    • Method And Elevator Arrangement
    • 方法和电梯安排
    • US20120023863A1
    • 2012-02-02
    • US13200946
    • 2011-10-05
    • Gert Van Der MeijdenJos Van Den Heuvel
    • Gert Van Der MeijdenJos Van Den Heuvel
    • B66B9/187B66B9/16E04G21/14
    • B66B19/00B66F1/08B66F7/20
    • Method for constructing an elevator, more particularly an elevator that is used during the construction-time of the building, in which method the range of movement in the elevator hoistway of the elevator car of the elevator is changed in steps to extend higher in the elevator hoistway with stepped lifts of the supporting platform of the elevator car, and in which method the supporting platform is lifted higher in the elevator hoistway with hoisting means, and the support force needed for the lift is taken from the building via a support structure. In the method the supporting platform is moved in the longitudinal direction of the elevator hoistway while being supported on a support structure that is supported immovably on the building such that the point for taking support from the support structure moves upwards in connection with the lifting of the supporting platform.
    • 更具体地说,在建筑施工期间使用的电梯的方法,其中电梯的电梯轿厢的电梯井道中的移动范围在电梯中逐步改变, 电梯轿厢的支撑平台的升降机的升降机,并且以提升装置将电梯井道中的支撑平台升高到该电梯井道中的方式,并且通过支撑结构从建筑物获取电梯所需的支撑力。 在该方法中,支撑平台在电梯井道的纵向方向上移动,同时支撑在不可移动地支撑在建筑物上的支撑结构上,使得用于从支撑结构支撑的点与上升 配套平台