    • METHOD AND SYSTEM FOR INSTALLING THE GUIDE RAILS OF AN ELEVATOR AND USE OF THE SYSTEM IN INSTALLING THE GUIDE RAILS OF AN ELEVATOR
    • 用于安装电梯导轨的系统和系统用于安装电梯导轨的方法和系统
    • US20090266651A1
    • 2009-10-29
    • US12434301
    • 2009-05-01
    • Gert VAN DER MEIJDENJos VAN DEN HEUVEL
    • Gert VAN DER MEIJDENJos VAN DEN HEUVEL
    • B66B7/02B66B11/00
    • B66B19/002B66B19/00
    • Method and system for installing guide rails (1), such as the car guide rails and/or the counterweight guide rails, on the vertical wall (3) of the elevator shaft (2) of a building, in which method the guide rail (1) is installed by assembly in phases from the bottom upwards by placing guide rail sections (41, 42, 43, 44 . . . ) that are shorter than the whole length of the guide rail one on top of the other, and by fixing the guide rail sections to the vertical wall (3) with guide rail fixings (5). The alignment of each lower guide rail section that is already installed and fixed is used as a comparison point for the alignment of the next upper guide rail section to be installed above it, such that each upper guide rail section is installed in alignment with each consecutive lower guide rail section that is already installed. The system likewise comprises means for using the alignment of each lower guide rail section that is already installed and fixed as a comparison point for the alignment of the next upper guide rail section to be installed above it, such that each upper guide rail section is installed in alignment with each consecutive lower guide rail section that is already installed. The system is used preferably in installing the guide rails of a tower building. Similarly, its use is advantageous in installing guide rails with the jump lift technique.
    • 在建筑物的电梯井道(2)的垂直壁(3)上安装诸如轿厢导轨和/或配重导轨的导轨(1)的方法和系统,其中,导轨 1)通过将导轨部分(41,42,43,44。)布置成比导轨的整个长度一个放在另一个顶部上,并且通过固定 导轨部分到具有导轨固定件(5)的垂直壁(3)。 已经安装和固定的每个下导轨部分的对准被用作用于对准要安装在其上的下一个上导轨部分的比较点,使得每个上导轨部分安装成与每个连续的对准 已经安装的下导轨部分。 该系统同样包括用于将已经安装和固定的每个下导轨部分对准的装置作为要安装在其上方的下一个上导轨部分对准的比较点,使得每个上导轨部分安装 与已经安装的每个连续的下导轨部分对准。 该系统优选地用于安装塔楼的导轨。 类似地,其使用在使用跳跃提升技术安装导轨方面是有利的。
    • 3. 发明申请
    • METHOD FOR INSTALLING AN ELEVATOR AND METHOD FOR INSTALLING THE GUIDE RAILS OF AN ELEVATOR
    • 用于安装电梯的方法和用于安装电梯的导轨的方法
    • US20100287876A1
    • 2010-11-18
    • US12833475
    • 2010-07-09
    • Gert VAN DER MEIJDENJos VAN DEN HEUVEL
    • Gert VAN DER MEIJDENJos VAN DEN HEUVEL
    • B66B9/00B66B7/02B66B11/00
    • B66B19/00B66B11/008B66B19/002
    • The object of the invention is a method for installing an elevator, in which method the guide rails of the car are installed by fixing the guide rail sections into position from the bottom upwards. After installation into position of the lowermost guide rail section at least one working platform is built between the guide rails of the lowermost guide rail section, the guide rails of the second guide rail section are fixed as an extension of the guide rails of the lowermost guide rail section using the working platform as an aid, diverting pulleys are fixed to the top ends of the guide rails of the second guide rail section, a hoist and the rope suspension of the working platform are fitted to the working platform, in which rope suspension the hoisting rope is led at its first end from the hoist over the diverting pulleys and under the diverting pulleys that are in connection with the working platform to its fixing point of the second end on the working platform, and the working platform is lifted to the next working height by means of the hoist and is locked into position.
    • 本发明的目的是一种用于安装电梯的方法,其中通过将导轨部分从底部向上固定到该位置来安装轿厢的导轨。 在安装到最下面的导轨部分的位置之后,在最下面的导轨段的导轨之间建立至少一个工作平台,第二导轨段的导轨被固定为最下面的导轨的导轨的延伸部 轨道部分使用工作平台作为辅助,转向滑轮固定到第二导轨部分的导轨的顶端,起重机和工作平台的绳索悬架安装在工作平台上,其中绳索悬挂 起重绳索的第一端从提升机的第一端被引导到转向滑轮上并且与工作平台连接的转向滑轮下方到达工作平台上的第二端的固定点,并且将工作平台提升到 通过葫芦的下一个工作高度被锁定到位。
    • 7. 发明申请
    • ELEVATOR ARRANGEMENT AND METHOD
    • 电梯布置和方法
    • US20100163347A1
    • 2010-07-01
    • US12721229
    • 2010-03-10
    • Gert VAN DER MEIJDENJos VAN DER HEUVEL
    • Gert VAN DER MEIJDENJos VAN DER HEUVEL
    • B66B7/06B66B11/08
    • B66B19/00
    • Arrangement and method for the construction-time use of an elevator, which arrangement comprises an elevator car (2), hoisting roping (4), a hoisting machine fitted to move the elevator car via the hoisting roping (4), which hoisting machine is preferably disposed on the machine room level (22) at the top end of the elevator hoistway, a counterweight (56), and which elevator comprises compensating roping (10), which compensating roping is connected to the supply storage (16) of the compensating roping. In the arrangement, the compensating roping (10) is connected to the elevator car via a diverting pulley (28) on the elevator car and to the counterweight (56) via a diverting pulley (58) on the counterweight (56). In the method one or more jumps of the machine room level are performed, and the additional rope needed for a jump of the machine room level is taken from the supply storage of the compensating roping. The construction-time roping of the elevator is arranged such that the compensating roping is connected to the elevator car (2) via the diverting pulley (28) on the elevator car (2) and to the counterweight (56) via the diverting pulley (58) on the counterweight (56).
    • 一种电梯施工时使用的布置和方法,该装置包括电梯轿厢(2),起重绳索(4),曳引机,其安装成通过起重绳索(4)移动电梯轿厢,该起重机是 优选地设置在电梯井道的顶端处的机房级(22)上,配重(56),并且该电梯包括补偿绳索(10),其中补偿绳索连接到补偿的供应储存器(16) 罗宾 在该配置中,补偿绳索(10)经由电梯轿厢上的转向滑轮(28)连接到电梯轿厢,并且经由配重(56)上的转向滑轮(58)连接到配重(56)。 在该方法中,执行机房级别的一个或多个跳跃,并且从补偿路线的供应存储器获取机房级别的跳跃所需的附加绳索。 电梯的施工时间线路布置成使得补偿绳索经由电梯轿厢(2)上的转向滑轮(28)连接到电梯轿厢(2),并经由转向滑轮( 58)。