会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 58. 发明授权
    • Stud frame wall system
    • 螺柱框架墙系统
    • US08671636B2
    • 2014-03-18
    • US13493855
    • 2012-06-11
    • Walter Kim Bruner
    • Walter Kim Bruner
    • E04B1/00E04B5/00E04B7/00E04B1/26E04B2/56E04B2/70
    • E04B1/26E04B1/10E04B2/56E04B2/706E04C2/34E04C2002/3488
    • A wall is provided with a plurality of stud frames disposed in at least one row, an outer layer, an inner layer, and an insulation layer. The stud frames are coupled between the outer layer and the inner layer. The stud frames are provided with a front stud, a back stud, a top plate, a bottom plate and at least one support member. The support members are coupled with the front stud and the back stud. The front stud and the back stud are disposed vertically. The broad sides of the front stud are parallel with the broad sides of the back stud. The top plate and the bottom plate are disposed horizontally. The top member is coupled with a top end of the front stud and a top end of the back stud. The bottom plate is coupled between the front stud and the back stud.
    • 壁设置有设置在至少一排中的多个柱形框架,外层,内层和绝缘层。 螺柱框架联接在外层和内层之间。 螺柱框架设置有前螺柱,后螺柱,顶板,底板和至少一个支撑构件。 支撑构件与前柱和后螺栓结合。 前螺柱和后螺柱垂直设置。 前柱的宽边与后螺柱的宽边平行。 顶板和底板水平放置。 顶部构件与前部螺柱的顶端和后部螺柱的顶端连接。 底板联接在前螺柱和后螺栓之间。
    • 59. 发明授权
    • Wall structure using bearing wall panel for wooden building and construction method thereof
    • 用于木制建筑的轴承墙板的墙体结构及其施工方法
    • US08640412B2
    • 2014-02-04
    • US13166271
    • 2011-06-22
    • Teruyuki Kato
    • Teruyuki Kato
    • E04B1/70
    • E04B2/706E04B2001/2696
    • In building a house, it is necessary to arrange bearing walls and non-bearing walls in a well-balanced manner. However, in the case where a bearing wall is configured by fixing a plate-like body such as a bearing wall panel to the exterior-side face of a structural frame member formed by assembling horizontal members and pillar members into the shape of a square frame, the surface of the bearing wall panel protrudes from the face of the structural frame member on the exterior side by a distance corresponding to the thickness of the bearing wall panel. Thus, the exterior-side face of the bearing wall in which the bearing wall panel is provided is not flush with the exterior-side face of the non-bearing wall in which the bearing wall panel is not provided, and so there is a step. Accordingly, processing of the base during attachment of an exterior building material has been necessary. Furthermore, there has been a problem that in the case where the condition of the framework is to be inspected after building, the inspection cannot be performed unless the bearing wall panel is removed.Receiving members are fixed to inner side faces enclosed by structural members including pillars, studs, and horizontal members, of a building so as to allow a face of a bearing wall panel on the exterior side to be flush with faces of the structural members on the exterior side and a face of an adjacent non-bearing wall on the exterior side.
    • 在建房时,必须以平衡的方式布置轴承墙和非承重墙。 然而,在通过将诸如轴承壁板的板状体固定到通过将水平构件和柱构件组装成正方形框架的形状而形成的结构框架构件的外侧面而构成的情况下 轴承壁板的表面从外侧的结构框架构件的表面突出与轴承壁板的厚度对应的距离。 因此,设置有轴承壁板的轴承壁的外侧面与不设置轴承壁面板的不支承壁的外侧面不齐平,因此具有台阶 。 因此,在外部建筑材料的附接期间处理基座是必要的。 此外,存在如下问题:在建筑物后检查框架的状况的情况下,除非移除轴承壁板,否则不能进行检查。 接收构件被固定在由建筑物的支柱,螺栓和水平构件的结构构件包围的内侧面上,以允许外侧的轴承壁板的表面与结构构件的表面齐平 外侧和外侧的相邻非承载壁的表面。