会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 16. 发明授权
    • Maintenance assembly adaptable within gas turbine engine
    • 维修组件适用于燃气涡轮发动机
    • US09540829B2
    • 2017-01-10
    • US14335100
    • 2014-07-18
    • ALSTOM Technology Ltd
    • Gaurav PathakChristopher Michael Robson
    • E04G3/24B66F3/35F01D25/28F02C7/00
    • E04G3/24B66F3/35E04G3/246F01D25/285F02C7/00F05D2230/68F05D2230/72
    • The maintenance assembly, for workers to perform maintenance activities within a gas turbine engine, is capable of being arranged within a cavity, generally around a combustor, accessible from a manhole of the gas turbine engine. The maintenance assembly includes a platform, and an inflatable member cooperatively configured to the platform. The inflatable member is at a normal condition, when placed outside of the cavity, being at a deflated position and is at a working condition, when arranged within the cavity, being at inflated position so as to accommodate a shape coordinating the cavity in such a manner that the platform is advance within the cavity up to a predetermined level to enable the workers on the platform to reach at a predetermined position within the cavity to perform the maintenance activities.
    • 用于工人在燃气涡轮发动机内执行维护活动的维护组件能够被布置在可从燃气涡轮发动机的人孔接近的大致围绕燃烧器的空腔内。 维护组件包括平台和协作地配置到平台的可充气构件。 充气构件处于正常状态时,当放置在空腔外部时处于放气位置并且处于工作状态,当布置在空腔内时处于充气位置,以便容纳在这样的空间中协调空腔的形状 使得平台在腔内前进到预定水平,使得平台上的工人能够到达腔内的预定位置以执行维护活动。
    • 17. 发明申请
    • ARRANGEMENT AND A METHOD FOR PARALLEL TRANSPORT AND INSTALLATION OF ELEVATOR COMPONENTS
    • 安排和并行运输和安装电梯组件的方法
    • US20160332845A1
    • 2016-11-17
    • US15140667
    • 2016-04-28
    • Petri KEREAntti MERTALA
    • Petri KEREAntti MERTALA
    • B66B19/00E04G3/24E04G3/28
    • B66B19/002B66B19/00E04G3/246E04G3/28E04G2003/286
    • A material transport and installation arrangement comprising a first working platform system in an elevator shaft for reaching a first installation height; and a first material hoisting system for moving elevator components vertically in the elevator shaft is disclosed. The arrangement is characterized in that it comprises a second working platform system in the elevator shaft for reaching a second installation height, the second working platform system comprising a second platform hoist, second platform roping and a vertically moveable second working platform, the second working platform being below the first working platform; and a second material hoisting system for moving elevator components vertically in the elevator shaft, the second material hoisting system comprising a second material hoist, second material roping and a second material holder. Further, a method for parallel transport and installation of elevator components is disclosed.
    • 一种材料输送和安装装置,其包括用于达到第一安装高度的电梯井中的第一工作平台系统; 并且公开了用于在电梯井中垂直移动电梯部件的第一材料提升系统。 该装置的特征在于它包括一个用于达到第二安装高度的电梯井中的第二工作平台系统,第二工作平台系统包括第二平台升降机,第二平台绳索和可垂直移动的第二工作平台,第二工作平台 在第一个工作平台下面; 以及用于在电梯井道中垂直移动电梯部件的第二材料提升系统,第二材料提升系统包括第二材料提升机,第二材料卷绕机和第二材料架。 此外,公开了一种并行运输和安装电梯部件的方法。
    • 18. 发明授权
    • Equipment and method for demolishing a building
    • 拆除建筑物的设备和方法
    • US09470006B2
    • 2016-10-18
    • US14352991
    • 2011-10-20
    • Giuseppe PanseriStefano PanseriRoberto Panseri
    • Giuseppe PanseriStefano PanseriRoberto Panseri
    • E04G23/08E04G3/22E04G3/24E04G3/34E04G3/28
    • E04G23/08B05B9/01B66C23/18E04G3/22E04G3/243E04G3/28E04G3/34E04G5/061E04G21/32E04G2003/283E04G2003/286
    • An equipment (1) for demolishing a building (2), wherein said building (2) comprises a building base (3) placed in proximity of a ground (4), or placed on the ground (4), and an opposite building top (5) or temporary building top (5) arranged away from said building base (3), as well as building floors (6), comprises: —a platform (7) adapted to be positioned against the top of the building (5) avoiding ground support devices which from the platform (7) reach the base of the building (3) or the ground (4) surrounding the building; said platform (7) comprising at least one working scaffold (8) adapted to be arranged along the periphery (9) of said building (2) and to face at least one floor (6) of said building (2); —said at least one working scaffold (8) being supported, hanged, on said platform (7) so that it descends along the side wall (10) of the building (2) to border the works for demolishing the building (2).
    • 一种用于拆除建筑物(2)的设备(1),其中所述建筑物(2)包括放置在地面(4)附近或放置在地面(4)上的建筑物基座(3)和相对的建筑物顶部 (5)或远离所述建筑物基座(3)布置的临时建筑物顶部(5)以及建筑物地板(6)包括:平台(7),适于抵靠建筑物(5)的顶部定位, 避免从平台(7)到达建筑物(3)的基部或围绕建筑物的地面(4)的地面支撑装置; 所述平台(7)包括适于沿着所述建筑物(2)的周边(9)布置并面向所述建筑物(2)的至少一个地板(6)的至少一个工作脚手架(8)。 - 至少一个工作脚手架(8)被支撑,悬挂在所述平台(7)上,使得其沿着建筑物(2)的侧壁(10)下降以与用于拆除建筑物(2)的工件相接合。