会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 18. 发明授权
    • Process and device for the piecing of a yarn in an open-end spinning
machine operating with a spinning rotor
    • 用旋转转子操作的开口纺纱机中的纱线的加工和装置
    • US5152132A
    • 1992-10-06
    • US511590
    • 1990-04-18
    • Michael StrobelEdmund Schuller
    • Michael StrobelEdmund Schuller
    • D01H4/12D01H4/48D01H4/50D01H15/00
    • D01H4/50D01H4/12
    • A yarn is fed at a piecing speed to the fiber collection surface of a spinning rotor. It is there combined with the fibers of a fiber ring and is then drawn off from the spinning rotor in the form of a continuous yarn while fibers newly fed into the spinning rotor continue to be incorporated in the yarn. The rotor speed is changed, immediately after piecing, from the piecing speed to a rotational speed which is lower than the piecing speed. The rotor speed is then increased to the production speed. In this manner, optimal conditions are achieved with respect to propagation of twist and draw-off of the piecing joint. To carry out this process, mechanisms are provided for the reduction of the rotor speed from piecing speed to a lower value, for renewed acceleration of the rotor speed after a desired minimum value has been reached after the passage of a predetermined period of time, as well as mechanisms to tie the accelerating rotor speed to the desired production speed.
    • 将纱线以接头速度送入纺丝转子的纤维收集表面。 它与纤维环的纤维结合在一起,然后以连续纱的形式从纺丝转子中取出,同时新喂入纺丝转子的纤维继续加入到纱线中。 在接头后立即将转子速度从接头速度改变为低于接头速度的转速。 然后将转子速度增加到生产速度。 以这种方式,对于接头接头的扭转和牵引的传播获得最佳条件。 为了执行该过程,提供了用于将转子速度从接头速度降低到较低值的机构,用于在经过预定时间段之后达到期望的最小值之后重新加速转子速度,如 以及将加速转子速度与期望的生产速度相关联的机构。
    • 19. 发明授权
    • Yarn draw-off pipe to draw off a yarn from an open-end spinning device
    • 纱线抽出管,用于从开口纺纱装置中抽出纱线
    • US5044151A
    • 1991-09-03
    • US207741
    • 1988-06-16
    • Johann PohnRudolf OexlerGottfried SchneiderEdmund SchullerErnst Domke
    • Johann PohnRudolf OexlerGottfried SchneiderEdmund SchullerErnst Domke
    • D01H4/40
    • D01H4/40
    • A yarn draw-off pipe for drawing off a yarn from an open-end spinning device. The draw-off pipe is equipped with first and second pipe sections, which are connected to each other through a connecting piece. The connecting piece contains a chamber and is provided with a deflection surface extending into the chamber. The latter is part of an insert. The connecting piece is provided with an insertion opening for this insert on its side towards the spinning element, when assembled, the insert is secured axially between the front end of the insertion opening and the first pipe section or, alternatively, between the two pipe sections. The insert is made of a ceramic material and, with its end towards the spinning device, projects radially beyond the outside diameter of the first pipe section. The area of the guide left free by the insert is filled with a plastic material.
    • 一种用于从开口纺纱装置抽出纱线的纱线抽出管。 排出管配备有通过连接件彼此连接的第一和第二管段。 连接件包含一个腔室,并且设置有延伸到腔室中的偏转表面。 后者是插入的一部分。 连接件在组装时在其一侧设置有用于该插入件的插入口,当组装时,插入件轴向地固定在插入开口的前端和第一管部之间,或者在两个管段之间 。 插入件由陶瓷材料制成,并且其端部朝向纺丝装置径向伸出超过第一管段的外径。 由插入件留下的导轨区域填充有塑料材料。
    • 20. 发明授权
    • Control device to drive and stop an open-end spinning element
    • 驱动和停止开放式旋转元件的控制装置
    • US4899528A
    • 1990-02-13
    • US290101
    • 1988-10-11
    • Maximilian FahmullerEdmund SchullerGottfried Schneider
    • Maximilian FahmullerEdmund SchullerGottfried Schneider
    • D01H4/42D01H4/12
    • D01H4/12
    • A device for the control of an open-end spinning element, including a pivoted control lever (4) is provided which is capable of assuming three different working positions. In a production position the control lever brings a first drive, running at production speed, into driving contact in the operation of the open-end spinning element. In a braking position the control lever brings a brake to act upon the spinning element. The control lever in a piecing position brings a second drive which runs at a lower speed than the first drive into driving contact with the open-end spinning element. At least the positions determining the production and the piecing position of the control lever are provided with a common control element, capable of being moved back and forth in the direction of movement of the free end of the control lever between at least two switching positions. The control element is provided with a stop element which determines at least the production or the piecing position of the control lever, depending upon the switching position (I, II) of the control element. The stop element is an integral part of the control element. The control element, in addition to movement in the direction of movement of the free end of the control lever, can also be moved transversely to the direction of movement of the free end of the control lever.
    • PCT No.PCT / DE88 / 00252 Sec。 371日期:1988年10月11日 102(e)日期1988年10月11日PCT提交1988年4月28日PCT公布。 第WO88 / 09837号公报 日期为1988年12月15日。一种用于控制开放式旋转元件的装置,包括枢转控制杆(4),其能够承担三个不同的工作位置。 在生产位置,控制杆将开始运转的第一驱动器以开放速度运行,在开放式旋转元件的操作中形成驱动接触。 在制动位置,控制杆带来制动器作用于旋转元件。 接合位置的控制杆带来第二驱动器,其以比第一驱动器更低的速度运行,以与开放式旋转元件驱动接触。 至少确定控制杆的制造位置和接头位置的位置设置有共同的控制元件,能够在至少两个切换位置之间的控制杆的自由端的移动方向上来回移动。 控制元件设置有停止元件,其根据控制元件的切换位置(I,II)至少确定控制杆的产生位置或接头位置。 停止元件是控制元件的组成部分。 除了在控制杆的自由端的移动方向上的移动之外,控制元件还可以横向移动到控制杆的自由端的移动方向。