    • 1. 发明公开
    • 침하방지용 굴진대차를 이용한 터널 굴착용 토압지지판 시공 공법
    • ARTH用于隧道的压力板施工方法
    • KR1020180000492A
    • 2018-01-03
    • KR1020160078530
    • 2016-06-23
    • 최찬숙
    • 최찬숙김영필김훈희
    • E21D9/06E21D9/12E21D11/14E21D13/00
    • E21D9/06E21D9/0621E21D9/12E21D11/14E21D13/00
    • 본발명은터널굴착용토압지지판시공공법에관한것으로서, 강관사이의토압을지지하기위한토압지지판인방수철판과고정판의설치작업이효율적으로이루어질수 있도록하여작업효율을향상시킴과함께작업시간을단축시키도록하기위한것이다. 이를실현하기위한본 발명은, 전후로관통된다각또는원형통형상을이루고상부에방수철판(20)을하부에고정판(30)을탑재하는탑재부를구비한침하방지용굴진대차를마련하는단계; 상기굴진대차를강제전진시키기위한견인수단을설치하는단계; 상기인접한강관(10)의대면부에상기굴진대차의상/하부가통과할수 있도록강관길이방향으로상하부에절개홈(11,12)을형성하는강관절개단계;와, 상기굴진대차(40)의상하부탑재부에방수철판(20) 및고정판(30)을탑재하고상기견인수단을이용하여상기굴진대차(40)를절개홈(11)(12)으로강제이동시키는단계; 탑재된상기방수철판(20)과고정철판(30)을절개홈(11)(12) 상/하부에용접고정하는단계; 상기설치가이루어진방수철판(20) 및고정판(30) 사이의강관과흙을제거하는단계; 상하부에상기절개홈(11,12)을형성하는강관절개단계에서부터그 후속단계를반복하는것을특징으로한다.
    • 本发明是具有改进的工作效率锡金的预定时间和减少对安装土压力支撑板的是耐热钢板和用于支撑钢管以有效地通过以下方式实现之间的土压力固定板涉及用于隧道支撑板施工法接地压力 它是如此。 本发明的用于实现这一点,是通过-周围形成提供用于防止钻孔平衡包括用于安装在固定板30的安装凹陷的所述或每个原始形状繁荣步骤中,防水钢板20的底部到顶部; 安装用于强行推进犁车的拖曳装置; 到相邻的钢管(10),所述医疗表面钻孔装天平/低以在顶部和底部由钢管长度方向的切割间隙(11,12),以通过钢管被传递切断步骤;和余量的钻孔(40)的下部安装部分的服装 (20)和固定板(30)之间,用推拉机构将推车(40)强制移动到切口槽(11)(12) 焊接并固定安装在切口槽11和12的上侧和下侧的防水钢板20和固定钢板30; 在防水钢板(20)和安装防水钢板(20)的固定板(30)之间移除钢管和土壤; 并且,从切断槽11,12形成在上下的钢管切断工序开始重复后续工序。
    • 2. 发明授权
    • 대구경 강관을 이용한 비개착식 터널 곡선부 시공을 위한 분절식 강관추진장치
    • 用于大直径钢管的非开洞隧道弯曲部分的分体式钢管推进系统
    • KR101778208B1
    • 2017-09-14
    • KR1020160043722
    • 2016-04-08
    • 삼호개발 주식회사
    • 심재범
    • E21D9/06E21D9/093E21D9/00E21D13/00
    • E21D9/06E21D9/003E21D9/0621E21D9/093E21D13/00
    • 본발명은터널시공부지에선행압입되는선도관을소정의위치에서분절하고, 그분절된선도관이각각독립적으로추진할수 있도록함으로써최적의곡선반경에적합한곡선선형의비개착식터널을시공할수 있도록하는등 곡선구간에서의비개착식터널시공이용이하게이루어지며, 각도확인수단을통해작업자가전방선도관의회전각도를육안으로확인하되외부작업자와의동조를통해신뢰성이높은터널시공부지의곡선부시공이용이한대구경강관을이용한비개착식터널곡선부시공을위한분절식강관추진장치에관한것으로대구경강관을이용한비개착식터널공법을곡선부에적용하는경우, 그곡선부터널시공을설계에명시된곡선반경에따라소요되는굴착단면을정확하게시공할수 있도록하는장치로써추진작업의효율도높이고, 굴착단면을최소화함으로써경제성의이득과함께철도또는도로시설물의안전성을높일수 있는대구경강관을이용한비개착식터널곡선부시공을위한분절식강관추진장치에관한것이다.
    • 本发明通过使能前述在规定位置独立地推动所述隧道施工现场的引导管压入到各段,和领先管段被构造成用于最佳弯道半径合适的非开挖隧道的曲线对准 等它到弯曲eseoui非开挖隧道施工使用,所述前主导管确定通过角度检测装置通过肉眼但在同步的高可靠性与外部操作者隧道施工现场曲线衬套的旋转角度的操作者进行 使用利用大口径钢管为约一个包子禁食钢管的非开挖隧道弯曲部分结构与弯曲部的大口径钢管驱动装置施加非开挖隧道法的情况下,设置了从该曲线设计一个电路板结构 作为一个装置,其能够进行精确的施工挖掘横截面,根据该曲线半径通过最小化挖掘横截面,以增加驾驶操作的效率,与经济性的益处铁采取 或空腹钢管驱动装置的非开挖隧道施工弯曲部具有大直径的钢管,其进而,道路设施好处安全分钟。
    • 3. 发明授权
    • 대구경 비개착식 터널시공을 위한 외벽 방수방법
    • 大直径非安装式隧道施工的外墙防水方法
    • KR101778206B1
    • 2017-09-14
    • KR1020160043720
    • 2016-04-08
    • 삼호개발 주식회사
    • 심재범
    • E21D11/38E21D9/06E21D13/00E02D31/00
    • E21D11/38E02D31/004E02D2450/105E21D9/06E21D9/0621E21D11/383E21D13/00
    • 개시된본 발명의대구경비개착식터널시공을위한외벽방수방법은터널시공부지(207)내의선도관(203) 압입과정과, 상기선도관(203) 내부에뒤쪽형강구조체(301)의조립과정과, 상기선도관(203)내에조립된상기뒤쪽형강구조체(301)를밀어주는상기선도관(203) 굴진과정과, 상기선도관(203)이굴진된공간내에서의방수시트(501) 설치과정과, 상기방수시트(501)가설치된상기선도관(203)내에앞쪽형강구조체(301)를조립하는과정과, 상기앞쪽및 뒤쪽의형강구조체(301) 사이에다수의토류판(303) 거치과정을반복하여상기터널시공부지(207)내에다수의터널시공관이존재하면서횡방향으로인접배열되고상기터널시공관의각각에상기방수시트(501)가서로겹쳐져서연결되어설치되도록한 과정및 상기터널시공관을서로연통시키는연통공간(601)을형성하고, 상기인접배열된터널시공관측부의방수시트(501)를종횡으로겹쳐지게연결하고, 상기연통공간(601)내의상부및 하부쪽에토류판(603,604)을설치하는단계를포함한다.
    • 根据本发明的用于构建大直径引导型隧道的外墙防水方法包括将引导管203压入隧道施工现场207的过程, 注入组装在导管203中的用于推动背部钢结构301的导管203的过程以及在导管203被推入的空间中安装防水片501的过程, 将前部钢结构301组装在其中安装有防水片501的前导管203中的过程以及在前部钢结构301和后部钢结构301之间安装多个污垢板303的过程 多个隧道穿孔在隧道施工现场207中布置成在横向方向上彼此相邻,并且防水片501被安装成以连接的方式连接到每个隧道穿孔, 形成用于连通空腔的连通空间601,连通空间601用于连通相邻的隧道空间601。 被片材附着的重叠纵向和501,并且包括安装toryupan(603 604),上侧和下侧在通信区域601中的步骤。
    • 4. 发明授权
    • 선도체의 수중인상이 가능한 관 추진공법
    • 可以提高领导机构水的管道推进方法
    • KR101778201B1
    • 2017-09-14
    • KR1020160173832
    • 2016-12-19
    • 주식회사 송현이엔씨
    • 양희종
    • E21D9/06E02F5/18F16L55/128F16L55/11
    • E21D9/06E02F5/18F16L55/1141F16L55/128
    • 본발명은관 추진공법에관한것으로서, 지하에단위추진관의길이보다긴 길이를갖는추진구를설치하는단계와; 상기추진구의측벽에선도체를배치하고, 선도체를구동하여지반을굴진하는단계와; 상기선도체가굴진하여형성된관로내부로최초추진관을상기선도체의후단으로압입하는단계와; 상기선도체와상기최초추진관을분리결합수단에의해서로결합시키는단계와; 상기선도체가목표하는수중위치까지굴진하고, 상기최초추진관에연속하여후속추진관을순차적으로압입하여지하와수중을연결하는추진관로를형성하는단계와; 상기선도체와상기최초추진관사이의경계영역에한 쌍의외경가변격벽을설치하여상기선도체와상기추진관내부로물이유입되는것을차단하는단계와; 수중에위치한상기선도체에견인로프를결합시키는단계와; 상기분리결합수단을분리하여상기선도체와상기최초추진관을분리하는단계와; 상기견인로프를지상에서견인하여상기선도체를지상으로인상시키는단계를포함하며, 상기한 쌍의외경가변격벽은각각, 공기의주입여부에따라팽창및 수축하는고무튜브와; 상기고무튜브의양측가운데영역에수직하게배치되며, 나사결합공이관통형성된한 쌍의금속지지판과; 상기한 쌍의금속지지판에관통삽입되어상기한 쌍의고무판사이의이격간격을조절하여상기고무튜브의외경을가변시키는외경조절나사를포함하는것을특징으로한다.
    • 本发明涉及一种管道推进方法,包括以下步骤:在地下室中安装具有比单元推进管的长度更长的长度的螺旋桨; 将导体放置在螺旋桨的侧壁上,驱动导体刺穿地面; 将第一推进管压入引线体的后端,进入通过刺穿引线体而形成的导管; 借助于单独的联接装置将所述引导体和所述第一螺旋桨管耦合; 通过依次将后续的推进管推到第一推进管上形成连接地下和水下的推进管道; 在引导件和第一推进器之间的边界区域中提供一对外径可变隔板以防止水流入引导器本体和推进器的内部; 将牵引绳与位于水中的引导体相连接; 分离分离和联接装置以分离第一导体和第一螺旋桨管; 通过牵引绳索将牵引绳牵引至地面,其中,所述一对外径变化分隔壁各自具有根据是否注入空气而膨胀和收缩的橡胶管; 一对金属支撑板垂直地设置在橡胶管的两侧并具有形成在其中的螺纹孔; 以及外径调节螺钉,插入所述一对金属支撑板中以通过调节所述一对橡胶板之间的间隔来调节所述橡胶管的外径。
    • 5. 发明公开
    • 지중 굴착구 개폐장치
    • 地下开挖开闭装置
    • KR1020150014636A
    • 2015-02-09
    • KR1020130090043
    • 2013-07-30
    • 조광래
    • 조광래
    • E21D9/06
    • E21D9/06E02D17/04E21D9/005
    • 본 발명은 지중 굴착구 개폐장치에 관한 것으로, 더욱 상세하게는 지반에 수직으로 형성된 작업구(수직구)의 일측면을 커팅하여 세미쉴드머신과 같은 굴착기구를 안입시켜 굴착구를 형성하는 과정에서 작업구의 커팅 시 지중에 함유된 다량의 지하수나 토사가 굴착구의 외부로 유출되는 것을 방지하기 위하여 시행하는 그라우팅 공법을 생략하고, 굴착구의 외측면에 별도의 개폐장치를 설치하여 그라우팅 작업을 시행함에 따라 발생되었던 시간과 비용적인 문제점 및 환경오염의 문제점을 완벽하게 해소할 수 있고, 굴착구의 형성작업을 용이하게 할 수 있는 지중 굴착구 개폐장치에 관한 것이다.
      본 발명에 따르면, 수평으로 위치된 중심부의 일측에 커터삽입구가 형성되고, 내측에 일정 폭의 수용 공간이 형성되며, 상측이 본체상부덮개에 의해 개폐되는 본체와; 본체의 내측 수용 공간에 형성된 가이드홈에 삽입되어 승강되는 본체개폐막으로; 구성되어 작업구의 일측면에 탈부착 가능하게 설치됨을 특징으로 한 지중 굴착구 개폐장치가 제공된다.
    • 本发明涉及地下开挖开口的开闭装置,更具体地说涉及地下开挖开口的开闭装置,省略了防止大量地下水和土壤的灌浆方法 在通过切割垂直形成在地面上的工作开口的一侧(垂直开口)的一侧插入半屏蔽机械等挖掘装置,在形成挖掘开口的过程中切断工作开口时从地面逸出; 通过在挖掘开口的外表面上安装单独的开闭装置来完全解决现有问题,其中问题与时间,成本和灌浆造成的环境污染有关; 并轻松组建地下开挖开口。 地下开挖开口的开闭装置安装在工作开口的一侧,以便能够从工作孔分离,包括:主体,其具有形成在水平定位的中心部分的一侧的切割器插入口 并且其中形成有恒定宽度的容纳空间,并且其上侧由上身罩打开和关闭; 并且通过插入形成在主体的容纳槽内的引导槽中提升主体开闭屏幕。
    • 6. 发明授权
    • 추진공법용 프리케스트 반력벽
    • 预防反应墙
    • KR101419775B1
    • 2014-07-23
    • KR1020140005144
    • 2014-01-15
    • (주)나스텍이앤씨
    • 정철권김명수
    • E21D9/06
    • E21D9/005E21D9/06E21D13/00
    • The present invention relates to a precast reaction wall installed in a propulsion pit for constructing a pipe on the ground to support a repulsive force of propulsion equipment. One side is formed to be closely attached to the inner surface of the propulsion pit and the other side is formed to be closely attached to the end of the propulsion equipment. The precast reaction wall includes a plurality of blocks in which a protrusion unit is formed to be stacked by corresponding to each other on the upper/lower surface. The precast reaction wall for a propulsion construction method capable of rapidly and easily performing the construction by installing the precast reaction wall in a construction site and a pipe propulsion method by using the same are provided.
    • 本发明涉及一种安装在推进坑中的预制反应壁,用于在地面上构建一个支撑推进设备排斥力的管道。 一侧形成为紧密地附接到推进坑的内表面,另一侧形成为紧密地附接到推进设备的端部。 预制反应壁包括多个块,其中突起单元形成为在上/下表面上彼此对应地堆叠。 提供了能够通过在施工现场安装预制反应壁并通过使用该预制反应壁来快速且容易地进行施工的用于推进施工方法的预制反应壁。
    • 8. 发明授权
    • 쉴드 터널링 장치
    • 屏蔽隧道装置
    • KR100995323B1
    • 2010-11-19
    • KR1020100025896
    • 2010-03-23
    • 이문수
    • 이문수
    • E21D9/06E21D9/12
    • E21D9/122E21D9/06E21D9/126E21D11/08E21D11/40
    • PURPOSE: A shield tunneling device is provided to enable an operator to freely select the arrangement position of a vertical conveyor unit and a stretcher unit to lift cutting soil to the ground. CONSTITUTION: A shield tunneling device comprises an excavator unit(10), a screw conveyor unit(20), a chassis(30), a first conveyor belt unit(40), a second conveyor belt unit(50), a third conveyor belt unit(60), a stretcher unit(70), a direction converter unit(80), and a vertical conveyor unit(90). The excavator unit digs a tunnel. The screw conveyor unit transfers cutting soil generated by an excavator unit. The chassis connects to the excavator unit. The first conveyor belt unit is placed between the screw conveyor unit and the chassis. The first conveyor belt unit transfers cutting soil from the screw conveyor unit. The second conveyor belt unit is placed on the top of chassis. The second conveyor belt transfers the cutting soil from the first conveyor belt. A return pulley(61) of the third conveyor belt unit is mounted on the chassis. The third conveyor belt unit transfers cutting soil from the second conveyer. The stretcher unit is mounted on the third conveyer belt unit.
    • 目的:提供屏蔽隧道装置,使操作者能够自由地选择垂直输送单元和担架单元的布置位置,以将切割土壤提升到地面。 构成:盾构隧道装置包括挖掘机单元(10),螺旋输送机单元(20),底盘(30),第一输送带单元(40),第二输送带单元(50),第三输送带 单元(60),担架单元(70),方向转换单元(80)和垂直输送单元(90)。 挖掘机挖掘一个隧道。 螺旋输送机转移挖掘机组产生的切割土。 底盘连接到挖掘机单元。 第一传送带单元放置在螺旋输送机单元和底盘之间。 第一输送带单元从螺旋输送机单元传送切割土。 第二个输送带单元放置在底盘的顶部。 第二传送带从第一传送带传送切割土。 第三传送带单元的返回滑轮(61)安装在底盘上。 第三传送带单元从第二传送器传送切割土壤。 担架单元安装在第三传送带单元上。
    • 9. 发明授权
    • 강관루프 구조체의 강관 압입용 비트
    • 管道压力管道管道结构的BEAT
    • KR100813917B1
    • 2008-03-18
    • KR1020070073733
    • 2007-07-23
    • 윤인병
    • 윤인병류진규
    • E02D7/20E02D5/28E21D9/06
    • E02D7/20E02D5/285E21D9/06
    • A bit for press-fitting a steel pipe of a steel pipe roof structure is provided to cut down on the manufacturing cost with a simple structure, to replace only bit heads easily and to cut down the maintenance cost by forming bit heads and eccentric shafts individually, and to prevent partial breakdown and to crush soil and rock strongly by preventing the concentration of stress by friction with soil and rock. A bit(100) for press-fitting a steel pipe of a steel pipe roof structure includes a bit body, a pair of eccentric shafts(102) installed to the bit body, and a pair of bit heads(110) widened as much as the appointed interval or narrowed in a circle according to the rotation of the eccentric shafts and the bit body. The bit head is provided with elliptical holes(122,132) to move the eccentric shafts as much as the space of the holes and to prevent axial separation and to make rotation at the appointed interval and divided into a first bit head(120) and a second bit head(130) composed of first projections, first grooves, second projections, and second grooves, wherein the bit head is formed in a circle by engaging the projections and the grooves of the first bit head with the grooves and the projections of the second bit head to be widened in the opposite direction to be larger than the diameter of a steel pipe(105) when press-fitting and propelling a steel pipe in the earth.
    • 提供一种用于压配钢管屋顶结构的钢管的方法,以简单的结构降低制造成本,仅通过单独形成钻头头和偏心轴来容易地替换钻头头并降低维护成本 ,并防止部分破裂,并通过与土壤和岩石的摩擦阻止应力集中,强烈地粉碎土壤和岩石。 用于压配钢管屋顶结构的钢管的一点(100)包括钻头体,安装在钻头体上的一对偏心轴(102)和一对加宽到 指定的间隔或根据偏心轴和钻头体的旋转变圆。 钻头头设置有椭圆孔(122,132),以使偏心轴与孔的空间一样多地移动,并且防止轴向分离并以指定的间隔旋转,并分成第一钻头头(120)和第二钻头 由第一突起,第一凹槽,第二突起和第二凹槽组成的钻头头部,其中通过使第一钻头头的突起和凹槽与第二钻头头的凹槽接合而形成圆头, 在将钢管压入并推进地球时,相反方向的钻头头部将大于钢管(105)的直径。
    • 10. 发明公开
    • 지중구조물 시공방법
    • 地下结构施工方法
    • KR20180010706A
    • 2018-01-31
    • KR20160093263
    • 2016-07-22
    • 주식회사 엔코텍이엔씨주식회사 엔코텍홀딩스
    • 김성래채면경김홍래
    • E21D9/06E02D17/04E02D17/08E02D29/05E21D9/00E21D9/14E21D13/00
    • E21D9/06E02D17/04E02D17/08E02D29/05E21D9/001E21D9/14E21D13/00
    • 본발명은지중구조물의길이방향을따라, 전체공사구간을비개착공법이적용되는비개착구간(a)과개착공법이적용되는개착구간(b)으로나누어시공하기위한지중구조물시공방법에관한것으로서, 상기전체공사구간중 상기비개착구간(a)측단부에추진작업구(10)를형성하고, 압입장치를설치하는압입준비단계; 상기추진작업구(10)에서상기압입장치에의해상기비개착구간(a)에대하여복수의압입관체(110)를좌우방향을따라열지어압입하는비개착압입단계; 상기개착구간(b)의전후단을굴착하고후방토류벽(30) 및전방토류벽(40)을설치하되, 상기후방토류벽(30)의후방에상기복수의압입관체(110)의전단이노출되도록하는토류벽설치단계; 상기개착구간(b)의상부토피를제거하고, 상기복수의압입관체(110)의전단에복수의비압입관체(120)의후단을결합한후, 상기복수의비압입관체(120)의상부를되메움하는개착설치단계;를포함하는것을특징으로하는지중구조물시공방법을제시함으로써, 전체공사구간의상부지반이경사지거나단차짐으로인하여상부토피의두께가일정하지않은경우라하더라도우수한시공성및 구조적안정성을얻도록한다.
    • 本发明涉及一种接地结构施工方法,用于沿着地面结构的纵向方向上,划分在挖掘部分的整个结构的区域(b)是一个非开挖部分(a)和挖掘工程是施加的非开挖方法应用于建筑 压入准备工序,在整个结构部的非设置部(a)侧的端部形成推出操作工具(10),并安装压入装置; 在推进操作工具(10)中,将多个压入配管主体(110)相对于非插入部(a)压入的非插入压入工序, 后壁(30)和前壁(40)被安装,并且后壁(40)被安装在后壁(30)的后面以露出多个压配管 步骤; 多个非压入配管体120的上端与多个压入管体110的前端连接,然后, 本发明提供了一种构造结构的方法,其中整个结构部分的上部是倾斜的或阶梯式的,从而即使当顶部的上部的厚度不恒定时, 并euleot。