会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明授权
    • 선로차량에 적용되는 교량의 슬래브 구조
    • 适用于车辆的桥梁的SLAB结构
    • KR100857894B1
    • 2008-09-10
    • KR1020080012487
    • 2008-02-12
    • 현대엔지니어링 주식회사한국철도기술연구원
    • 윤희택박영곤변윤섭이강원배을호이용기강태식김량균
    • E01D19/12E01B9/00E01D21/00E01D101/28
    • E01D19/12E01B9/00E01D21/00E01D2101/28
    • A slab structure of a bridge applied to track vehicles is provided to improve structural efficiency and economical efficiency of an upper structure of a bridge by installing a slab on an appointed part where the load of track vehicles traveling along an appointed track is applied. A slab structure(110) of a bridge applied to track vehicles is installed on the upper part of a girder of a bridge(200) to support the load of a track vehicle traveling along the appointed track by wheels, and composed of a central slab(110a) placed in the horizontal center of the bridge, and a pair of side slabs(110b) placed on right and left sides of the central slab, wherein a traveling unit is formed in the appointed width on the top of the central slab and the side slab to secure the travel eccentric error of the track vehicle as a road surface on which right and left wheels are bordered when the track vehicle is traveling, and a hollow unit is formed between the central slab and the side slab as a space which is not in contact with the right and left wheels of the track vehicle and opened vertically.
    • 提供应用于履带车辆的桥梁的板坯结构,以通过在施加沿着指定轨道行驶的履带车辆的载荷的指定部件上安装板坯来提高桥梁上部结构的结构效率和经济效率。 应用于轨道车辆的桥梁的板坯结构(110)安装在桥梁(200)的梁的上部,以支撑通过车轮沿着指定轨道行驶的履带车辆的载荷,并且由中央板 (110a)和位于中央板的右侧和左侧的一对侧板(110b),其中在中央板的顶部以规定的宽度形成行进单元,并且 侧板,以确保轨道车辆的行驶偏心误差,作为当轨道车辆行驶时左右车轮相邻的路面,并且在中央板和侧板之间形成中空单元作为空间, 不与轨道车辆的左右车轮接触并垂直打开。
    • 4. 发明授权
    • 보강형 단일 현장타설말뚝 기초 및 그 시공방법
    • 一种增强单列钻凿岩基础及其施工方法
    • KR100803558B1
    • 2008-02-15
    • KR1020070092213
    • 2007-09-11
    • 현대엔지니어링 주식회사한국철도기술연구원
    • 박영곤윤희택목재균변윤섭배을호강태식김성연김량균
    • E01D19/02E01D21/00E02D27/10E02D5/34
    • E01D19/02E01D21/00E02D5/34E02D27/10
    • A reinforcing type single cast-in-place pile foundation is provided to increase constructability and economical efficiency by heightening stiffness and ductility of a part where a steel pipe is installed and increasing resistance to bending moment, and reducing the cross sectional area of a pile foundation and the quantity of reinforcing bars required by installing a steel pipe to the top of a pile applied with maximum load when constructing a pile foundation. A reinforcing type single cast-in-place pile foundation(100) for heightening stiffness and ductility of the top of a pile applied with maximum load when constructing a pile foundation and increasing resistance to bending moment comprises a reinforcement cage composed of many main reinforcements(141) and hoop reinforcements(142) and inserted to the inside of the pile foundation, a cylindrical steel pipe(120) inserted to the center of the reinforcement cage, and a steel pipe mounting plate(130) installed to the reinforcement cage to mount the steel pipe and provided with many tremie pipe insertion holes to insert tremie pipes for placing concrete in an inside space of the steel pipe. A construction method of a reinforcing type single cast-in-place pile foundation comprises the steps of: excavating the bottom of a construction site where a pile foundation is to be constructed to the planned depth using excavation equipment; installing a reinforcement cage coupled with a steel pipe mounting plate in the excavated space, inserting a steel pipe into the reinforcement cage to be put at the center of the steel pipe mounting plate; and inserting tremie pipes to tremie pipe insertion holes formed on the steel pipe mounting plate, injecting concrete to the inside of the tremie pipes and placing concrete in a circumferential space of the steel pipe, and then curing the concrete surface.
    • 提供了一种加固型单桩现浇桩基础,通过提高安装钢管的部件的刚度和延展性,增加抗弯矩能力,降低桩基截面积,提高施工性和经济性 以及在构造桩基时,将钢管安装在施加最大载荷的桩的顶部所需的钢筋数量。 一种用于在施工桩基础时施加最大载荷的桩的顶部的刚度和延展性的增强型单桩现浇桩基(100),并且增加抗弯矩抗力包括由许多主增强件( 141)和环形加强件(142),并且插入到桩基的内部,插入到加强笼的中心的圆柱形钢管(120)和安装到加强笼以安装的钢管安装板(130) 钢管上设有许多颤音管插入孔,用于将混凝土浇注在钢管的内部空间内。 一种加固型单现浇桩基础的施工方法,包括以下步骤:使用挖掘设备,将要建造桩基的施工场地的底部挖掘到计划深度; 在挖掘空间内安装与钢管安装板结合的钢筋笼,将钢管插入加固笼中,放在钢管安装板的中心; 并将颤音管插入钢管安装板上形成的弯曲管插孔,将混凝土注入钢管的内侧,将混凝土浇注在钢管的周向空间中,然后固化混凝土表面。