会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 41. 发明授权
    • 루프 구조체 및 이 시공 방법
    • 屋顶结构及其构造方法
    • KR101257215B1
    • 2013-04-23
    • KR1020120132632
    • 2012-11-21
    • 윤인병
    • 윤인병
    • E02D29/045E21D9/04E02D5/28E21D9/06E02D17/04
    • E02D29/045E02D5/285E02D17/04E02D2250/0023E02D2300/0029E02D2600/20E21D9/04E21D9/06
    • PURPOSE: A loop structure and a construction method thereof are provided to prevent cross sections from being reduced by overlapping of a steel pipe by separating the steel pipe, which is adjacent to each other, at predetermined intervals and to rapidly and precisely propel a steel pipe structure. CONSTITUTION: A loop structure comprises a loop solid, a propulsion guide unit, and a reinforcing bar, and concrete. The loop solid comprises a pipe(111) and a plurality of pipe assembly units(110) including a connection unit. The propulsion guide unit guides the pipe assembly units of the loop solid in order to propel the pipe assembly units into ground and comprises a rail groove(115) and a rail protrusion(116). The reinforcing bar is distributed to the inside of the pipe assembly units. The concrete is placed inside the pipe assembly units and is cured.
    • 目的:提供一种环路结构及其施工方法,以通过以预定间隔分离彼此相邻的钢管,通过钢管的重叠来减少横截面,并且快速且精确地推进钢管 结构体。 构成:环形结构包括环形固体,推进导向单元,以及钢筋和混凝土。 环固体包括管(111)和包括连接单元的多个管组件单元(110)。 推进引导单元引导环固体的管组件单元,以将管组件单元推进到地中,并且包括轨槽(115)和轨道突起(116)。 钢筋分配到管组件单元的内部。 将混凝土放置在管道组件单元内并固化。
    • 42. 发明授权
    • 지반 가압형 루프 구조체 시공 방법 및 지반 가압형 루프 구조체
    • 用于构造管道和管道结构的方法
    • KR101034665B1
    • 2011-05-16
    • KR1020100140271
    • 2010-12-31
    • 윤인병평전산업(주)
    • 윤인병신박문
    • E02D29/045E21D9/04E02D5/06E02D29/02
    • E02D29/045E02D5/06E02D29/0275E02D2250/0023E02D2300/002E21D9/04
    • PURPOSE: A construction method of a roof structure for pressing the ground and a roof structure for pressing the ground are provided to enable the strong installation of a stop plate on a roof frame though the stop plate is thinner than the groove of the frame. CONSTITUTION: A construction method of a roof structure for pressing the ground comprises the following steps. The ground is drilled through a front screw propeller so a space is formed. A lagging and waterproofing plate is installed to prevent a space from collapsing. A roof frame(110) is installed in the space of the lagging and waterproofing plate. A stop plate(120) is installed in the roof frame so one roof block(100) is completed. When the stop plate is installed on the roof frame, a space between the stop plate and the ground is filled with pressure filler. The installed lagging and waterproofing plate is removed. A gap generated by the removal of the lagging and waterproofing plate is filled with the pressure filler in order to press the ground.
    • 目的:提供一种用于按压地面的屋顶结构的施工方法和用于按压地面的屋顶结构,以便通过止动板比框架的沟槽更薄地将止动板牢固地安装在屋顶框架上。 构成:用于按压地面的屋顶结构的施工方法包括以下步骤。 地面通过前螺旋桨进行钻孔,形成一个空间。 安装落后防水板以防止空间塌陷。 在后挡板和防水板的空间中安装有车顶框架(110)。 挡板(120)安装在屋顶框架中,从而完成一个屋顶块(100)。 当挡板安装在屋顶框架上时,挡板和地面之间的空间填充有压力填料。 拆下安装的落后防水板。 通过去除滞留和防水板产生的间隙填充有压力填充物以压制地面。
    • 44. 发明授权
    • 강재빔을 이용한 루프 구조체 및 시공방법
    • 使用钢材的环形结构及其构造方法
    • KR100909990B1
    • 2009-07-30
    • KR1020080065644
    • 2008-07-07
    • 윤인병주식회사 홍익기술단
    • 윤인병복기찬
    • E02D29/045E21D9/04
    • E02D29/045E02D2200/165E02D2250/0076E02D2300/0029E21D9/04
    • A loop structure using steel beams and a construction method thereof are provided to excavate the ground to form a space and connect assembled loop blocks in the underground space, thereby facilitating the construction of loop structure. A loop structure using steel materials comprises a structure part which is made by successively connecting loop blocks, each of which is composed of a hexahedral steel frame and a concrete wall, and installed corresponding to the contour of the structure to be constructed, and a leading end propulsion part(100) which is mounted on the tip end of the structure part to excavate underground. The leading end propulsion part is composed of a propulsion base(110) of rectangular cross-section, a propulsion guide shield(120) which protrudes to the front of the propulsion base to secure a space in front of the propulsion base, and an excavation shield(130) which is installed to move back and forth in front of the propulsion guide shield to excavate underground.
    • 提供了使用钢梁的环形结构及其构造方法,以挖掘地面以形成空间,并将组装的环形块连接在地下空间中,从而有助于构造环形结构。 使用钢材的环结构包括通过连续地连接环块而制成的结构部件,每个环形块由六面体钢框架和混凝土壁组成,并且与构造的结构的轮廓相对应地安装, 末端推进部分(100),其安装在结构部分的末端以在地下挖掘。 前端推进部分由矩形横截面的推进基座(110),推进导向罩(120)组成,推进导向罩(120)突出到推进基座的前部,以将推进基座前方的空间固定, 护罩(130),其被安装来在推进导向罩前面来回移动以在地下挖掘。
    • 45. 发明授权
    • 강관 루프 구조체 시공 방법
    • 管道结构和管道结构的构造方法
    • KR100883222B1
    • 2009-02-13
    • KR1020080017399
    • 2008-02-26
    • 윤인병
    • 윤인병
    • E02D29/045E21D9/00
    • E02D29/045E02D2200/1685E02D2250/0076E02D2300/0029E21D9/00
    • A construction method of a steel pipe loop structure is provided to improve precision and remove unnecessary underground work by pre-forming a guide plate and a guide rail on steel plates on the ground and press-fitting the pre-formed pipes through the guide plate and the guide rail. A construction method of a steel pipe loop structure comprises a first step of preparing a plurality of steel pipes(100A,100B), a second step of press-fitting one of the steel pipes to the outline of a structure and slid-fitting a guide plate(120) of the other steel pipe to a guide rail(130) of the press-fitted steel pipe, a third step of constructing a steel pipe loop structure by charging filler in the steel pipes, and a fourth step of excavating the inside of the steel pipe loop structure and constructing the structure.
    • 提供钢管回路结构的施工方法,通过在地面上的钢板上预先形成引导板和导轨,通过引导板压入预成形管,提高精度和去除不必要的地下工作, 导轨。 钢管回路结构的施工方法包括:制备多根钢管(100A,100B)的第一步骤,将钢管中的一个压配合到结构轮廓的第二步骤,并将导向件 另一个钢管的板(120)连接到压配钢管的导轨(130),第三步是通过在钢管中填充填料来构造钢管回路结构,以及第四步骤, 的钢管回路结构和构造结构。