会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • 프리캐스트 콘크리트 옹벽 제조용 복합형 콘크리트 몰드와 이를 이용한 프리캐스트 콘크리트 옹벽 제조 방법과 이 방법에 의해 제조된 프리캐스트 콘크리트 옹벽 및 이의 시공 방법
    • KR101907676B1
    • 2018-10-12
    • KR1020170136909
    • 2017-10-20
    • 주식회사 케이씨산업도기주
    • 도기주이홍재
    • E02D29/02
    • E02D29/0275E02D2200/115E02D2250/0007E02D2600/20
    • 본발명은프리캐스트콘크리트옹벽제조용복합형콘크리트몰드와이를이용한프리캐스트콘크리트옹벽제조방법과이 방법에의해제조된프리캐스트콘크리트옹벽및 이의시공방법에관한것으로, 상단덮개의위치조정을통해시공현장에따른옹벽상단의다양성에맞춰프리캐스트콘크리트옹벽의상단을정방향과다양한경사방향으로제조하고, 또한, 시공현장에맞는높이의영구형몰드만을제작하고하나의가변형몰드를공용하여다양한높이의옹벽을제조하는것을목적으로한다.본발명에의한프리캐스트콘크리트옹벽용복합형콘크리트몰드는, 콘크리트의타설이가능한개방부가구비되며나머지가막힌구조의몰드본체, 좌우폭의조정이가능하도록구성되어좌우양쪽이상기몰드본체의대향면에접촉되는것으로, 덮개본체, 상기덮개본체의좌우양측중 일측이상에출몰가능하게설치되는폭조정판, 탄성력을통해상기폭조정판을상기몰드본체의내면에밀착시키는탄성부재를포함하는상단덮개, 상기몰드본체에지지되며상기상단덮개의길이방향의양측중 일측이상을승강시켜옹벽의상단을정방향또는경사방향으로셋팅하는위치조정구를포함하는프리캐스트콘크리트옹벽용가변형콘크리트몰드(10)와; 상기프리캐스트콘크리트옹벽용가변형콘크리트몰드의저부에연결되는벽체부및 상기벽체부의저부에서연장형성되는저판부가구비되어내부에상기프리캐스트콘크리트옹벽용가변형콘크리트몰드를향해개방되는공간을가지며서로다른크기로이루어지는다수의프리캐스트콘크리트옹벽용영구형콘크리트몰드(20)와; 상기프리캐스트콘크리트옹벽용가변형콘크리트몰드와상기프리캐스트콘크리트옹벽용영구형콘크리트몰드를연결하는연결구(30)를포함하고, 상기연결구는상기프리캐스트콘크리트옹벽용가변형콘크리트몰드와상기프리캐스트콘크리트옹벽용영구형콘크리트몰드의이음측단부에각각고정되는제1,2연결편(31,32), 상기제1,2연결편을분리가능하게결속하는체결구를포함하며, 상기프리캐스트콘크리트옹벽용가변형콘크리트몰드와상기프리캐스트콘크리트옹벽용영구형콘크리트몰드안에콘크리트를타설하여벽체와저판으로구성되는프리캐스트콘크리트옹벽을제작하되, 상기프리캐스트콘크리트옹벽용영구형콘크리트몰드중에서시공현장에맞춰선택된어느하나의프리캐스트콘크리트옹벽용영구형콘크리트몰드와프리캐스트콘크리트옹벽용가변형콘크리트몰드를조립하고상기프리캐스트콘크리트옹벽용가변형콘크리트몰드의상단덮개의승강과경사조정을통해다양한크기와경사의옹벽을제조한다.
    • 2. 发明授权
    • 옹벽 시공방법
    • KR101877417B1
    • 2018-08-07
    • KR1020170160755
    • 2017-11-28
    • 성석훈
    • 성석훈
    • E02D29/02
    • E02D29/0275E02D2250/0007E02D2600/20
    • 본발명은옹벽시공방법을개시한다. 본발명에따른옹벽시공방법은, 옹벽이시공되는위치에다수의철근을이용하여철근기초물을설치하는철근기초물설치단계; 시공옹벽의면적에대응되도록판상의거푸집본체들을연속적으로설치한다음, 거푸집본체의전면부상에옹벽에형성되는줄눈의교차지점과각각대응되는지점에십자형(+)의구조의줄바고정부재들을설치한다음수평및 수직방향별로인접하게설치된줄바고정부재에줄바의양단을각각삽입결합시킴으로써줄눈용거푸집을제작하는줄눈용거푸집제작단계; 줄눈용거푸집제작단계를통해제작된상기줄눈용거푸집들을철근기초물을사이에두고상호마주보도록이격배치하는줄눈용거푸집배치단계; 세파볼트를이용하여상기줄눈용거푸집들간의이격거리를확보하는이격거리확보단계; 상기옹벽에형성되는콘구멍의자리를형성하는 D 콘을상기세파볼트의양단부에결합시키는 D 콘결합단계; 본체볼트를상기줄눈용거푸집들을각각통과하도록한 후에상기본체볼트를상기 D 콘에결합시키는본체볼트결합단계; 상기줄눈용거푸집들의외측에서상기본체볼트에끼워지게주물사각와셔를체결하는주물사각와셔체결단계; 상기주물사각와셔가이탈되지않도록주물너트를체결하는주물너트체결단계; 상기줄눈용거푸집들사이로콘크리트를넣어양생하는콘크리트양생단계; 상기콘크리트가완전히굳기전에상기줄눈용거푸집들, 상기 D 콘, 상기본체볼트, 상기주물사각와셔및 상기주물너트를제거하는부품제거단계; 및상기줄눈용거푸집을해체하여거푸집본체와줄바를분리하는줄눈용거푸집해체단계;를포함하여이루어지되; 상기줄바는, 반원관(Half-pipe) 구조의몸체부와, 상기몸체부의길이방향양단으로부터내측을향하여소정의폭으로연장형성되는결합날개부와, 상기몸체부의내측에중앙에서길이방향을따라기립형성되는적어도하나이상의보강판및 상기몸체부의양단에형성되는탈거홈을포함하여형성되며, 줄바고정부재는, 육면체구조로형성되고상면에는음각또는양각으로의특정패턴의형상이가공되며중앙측에체결홀이관통형성되는중앙돌기와, 상기몸체부의저면측으로삽입될수 있는폭을갖는판형구조로상기중앙돌기의하단과동일선상으로형성되어상기중앙돌기의각 측면에일체형성되는고정날개부와, 상기각 고정날개부의양측끝단을따라형성되어상기몸체부의결합날개부와후크결합방식으로결합되기위한걸림부가형성된결합후크와, 상기보강판의두께와대응되는폭으로상기각 고정날개부의중앙측이절개되어형성되는보강판삽입홈및 상기보강판삽입홈을따라보강판삽입홈의양측에서돌출형성되어보강판을보강판삽입홈으로의이동을안내하는보강판가이드돌기를포함하여형성되는것을특징으로한다.
    • 3. 发明公开
    • 무가시설의 지중 구조물 시공방법
    • 没有临时结构的地下结构施工方法
    • KR1020150039410A
    • 2015-04-10
    • KR1020130117942
    • 2013-10-02
    • 주식회사 천마엔지니어링건축사사무소(주)경민산업
    • 양숙경
    • E02D29/045E21D1/08E04G11/52E04B1/348E02D5/10E02D29/02
    • E02D29/045E02D5/10E02D29/0275E04B1/348E04G11/52E21D1/08
    • 본발명은지반의천공홀(20)에지중구조물의외벽체(500)를형성하는외벽체형성단계; 외벽체(500)의내부영역을굴토하여초기굴토영역을형성하는초기굴토단계; 초기굴토영역의지지지반에가이드기둥(610)을근입하는가이드기둥근입단계; 가이드기둥(610)의상부와간격을두고상부띠장(511) 및상부거더(710)를설치하는상부띠장및 상부거더설치단계; 상부가상부거더(710)에결합하고, 하부가가이드기둥(610)의상부에결합하도록주기둥(630)을설치하는주기둥설치단계; 주기둥(630)의외측영역을굴토하는최종굴토단계; 상부거더(710)의상부영역, 기초지반의상부영역및 외벽체(500)와상부거더(710) 사이영역대하여철근배근, 거푸집설치및 콘크리트타설에의해슬래브(730), 바닥(740) 및합벽(520)을형성하는단계;를포함하는것을특징으로하는무가시설의지중구조물시공방법을제시함으로써, 가시설의설치및 해체를위한공정을생략하여, 이에소요되는기간, 비용및 안전사고의위험을줄일수 있고, 기둥및 거더의설치정밀도를향상시켜구조적으로안정적이고, 우수한횡방향의강성을확보하여토류시설물로서배면변위를최소화하여도심지건축물근접부의안전성을확보하고, 시공이용이하도록한다.
    • 本发明涉及一种没有临时结构的地下结构的施工方法。 没有临时结构的地下结构的施工方法包括: 外壁构造步骤,用于在地面的穿孔大厅(20)处形成地下结构的外壁结构(500); 初步挖掘步骤,通过挖掘外壁结构(500)的内部区域来形成初始挖掘区域; 将导柱(610)放置在初始开挖区域的支撑基座上的引导柱穿透步骤; 安装上引导条(511)和上引导柱(610)上部保持空间的上梁(710)上上带条和上梁安装步骤; 主柱安装步骤,以上部组合到上梁(710)的方式安装主柱(630),下部组合到导柱(610)的上部; 挖掘主塔(630)的外部区域的最终挖掘步骤; 通过钢筋布置形成板坯(730),地板(740)和单面壁(520)的步骤,用于上梁(710)上部区域的区域的模具安装和混凝土浇注,上部区域 基础地面和外壁体(500)与上梁(710)之间的区域。 可以省略安装和拆除临时设施的过程,因此可以减少疏忽事故的时间,成本和危险。 此外,可以确保市中心建筑物附近的安全,并且通过最小化地面设备的背面位移可以容易地实现施工作业,以确保结构稳定性和优异的横向强度,同时提高安装精度 柱和大梁。
    • 4. 发明公开
    • 캡빔 구조체
    • CAP BEAM ASSEMBLY
    • KR1020150010421A
    • 2015-01-28
    • KR1020130085432
    • 2013-07-19
    • 아주대학교산학협력단(주)써포텍
    • 한만엽
    • E02D17/04E02D5/06E02D29/02
    • E02D5/223E02D17/04E02D5/06E02D29/0275E02D2200/1678E02D2300/002
    • 본 발명은 캡빔 구조체에 관한 것으로 보다 상세하게는, 띠장을 이용하지 않고 캡빔에 버팀보를 정착시키기 위하여 상기 캡빔의 외면에 상기 버팀보를 정착시키는 정착구가 구비되되, 상기 정착구에는 전단키가 돌출되어 상기 정착구와 캡빔 사이의 결합력을 향상하며, 상기 버팀보에 의해 정착구에 가해지는 하중의 분산이 가능한 캠빔 구조체에 관한 것이다.
      이를 위하여 본 발명은 지반의 굴착면에 시공되는 흙막이벽체의 상부에서 철근으로 배근하고 콘크리트를 타설하여 상기 흙막이벽체의 상부를 구속하는 캡빔과, 상기 캡빔 내에 몸통 일부분이 삽입되도록 장착되는 복수의 정착구 및 상기 복수의 정착구 중 양단이 각각 이웃하는 정착구에 지지되는 버팀보를 포함한다.
    • 本发明涉及一种凸轮轴组件,更具体地说,涉及一种具有用于将支柱固定到帽梁的外表面的固定装置的凸轮轴组件,以将支柱固定到帽梁而不会出现纵摆,从而改善了固定装置之间的联接力 并且由于剪切键从固定装置突出,并且分散通过支柱施加到固定装置的负载的帽梁。 本发明包括:盖梁,其通过在形成在地面的挖掘表面上的挡土墙的顶部上布置钢筋并且设置混凝土来限制挡土墙的顶部; 多个固定装置将这些部分插入到帽梁中; 并且其支柱在多个固定装置之间支撑在相邻的固定装置上。
    • 5. 发明授权
    • 반강접 접합을 적용한 정거장 구조물의 시공방법
    • 使用半刚性连接的地铁平台施工方法
    • KR101467147B1
    • 2014-11-28
    • KR1020140059288
    • 2014-05-16
    • 주식회사 삼안
    • 김행배이현채김태헌
    • E02D29/00E02D29/02E21D11/08E02D5/74
    • E02D29/04E02D5/74E02D29/0275E21D11/083
    • 본 발명은 지하철과 같은 지하 정거장 구조물에서 지중 연속벽과 슬래브를 반강접으로 접합하여 모멘트 재분배가 이루어져 절점부에서 발생하는 모멘트를 줄일 수 있도록 한 반강접 접합을 적용한 정거장 구조물의 시공방법에 관한 것이다.
      본 발명은 (a) 수직근을 수직으로 매입구성하고, 각층 슬래브의 단부와 연결되는 절점부에는 수평으로 커플러 연결철근을 배근하고, 커플러 연결철근의 일측단부에는 커플러가 일측면에 노출되도록 지중 연속벽을 형성하는 단계; (b) 지중 연속벽의 두부를 정리하고, 최상층 슬래브를 시공할 수 있을 정도의 깊이로 지반을 굴착한 후, 슬래브가 설치될 지중 연속벽의 면에 일측이 돌출되도록 전단 저항 부재를 설치하는 단계; (c) 상부 주근과 하부 주근을 배근하고, 상부 주근과 하부 주근의 양단부를 각각 지중 연속벽의 커플러에 연결하고 콘크리트를 타설하되, 지중 연속벽의 슬래브가 설치되어 연결되는 절점부에는 판형상의 단절 플레이트를 설치하여 지중 연속벽과 콘크리트가 서로 단절되도록 최상층 슬래브를 형성하는 단계; (d) 다음 중간층 슬래브의 설치위치까지 굴착하고, 슬래브가 설치될 지중 연속벽의 면에 일측이 돌출되도록 전단 저항 부재를 설치하는 단계; (e) 상부 주근과 하부 주근을 배근하고, 상부 주근과 하부 주근의 양단부를 각각 지중 연속벽의 커플러에 연결하고 콘크리트를 타설하되, 지중 연속벽의 슬래브가 설치되어 연결되는 절점부에는 판형상의 단절 플레이트를 설치하여 지중 연속벽과 콘크리트가 서로 단절되도록 중간층 슬래브를 형성하는 단계; (f) (d) 내지 (e)의 단계를 반복하여 최하층의 슬래브까지 시공하는 단계;를 포함하여 이루어지는 것을 특징으로 하는 반강접 접합을 적용한 정거장 구조물의 시공방법을 제공한다.
    • 本发明涉及一种应用半刚性连接的地下车站结构的施工方法,通过在地下车站结构中连接地下隔墙和具有半刚性连接的板坯,节约部分发生的力矩减小 就像一个地铁配置时刻重新分配。 本发明的车站结构的施工方法可以防止邻近建筑物通过施加隔膜壁法和自顶向下方法进行地下土方工程的沉降和位移,可以作为未来的永久结构,并且可以显着地 减少施工期与常规施工期相比。
    • 6. 发明公开
    • 사면보강용 현장타설 계단식옹벽 대체시공법이 적용되는 거푸집이 필요없는 PC 판넬
    • 使用PC板无缝混凝土板施加斜坡加固墙的施工方法
    • KR1020140047924A
    • 2014-04-23
    • KR1020120114283
    • 2012-10-15
    • (주)고려컨설턴트
    • 유재성
    • E02D29/02E02D17/20E04G17/075E02B11/00
    • E02D29/0275E02B11/005E02D17/20E02D29/0233E04G17/075
    • The present invention relates to a construction method for cast-in-place stair type retaining wall for slope reinforcement, more specifically, to a construction method for cast-in-place stair type retaining wall, which uses a PC panel that doesn′t require a mold for cast-in-place concrete and which can substitute a stair type retaining wall. For the present invention, the cast-in-place stair type retaining wall for slope reinforcement using a PC panel that doesn′t require a mold is constructed by producing a precast concrete (PC) that can be mass-produced repetitively in various forms to substitute a mold, and by pouring a backfill concrete when the PC panel is fixed. The construction method for substituting stair type retaining wall of the present invention enables to make a desired shape by constructing a rear side with the ″backfill concrete″ or ″backfill concrete + earth and sand″ after producing and moving the PC panel in advance, wherein a pattern is engrave on its front side in a fixed size, shortens the construction period, saves the construction cost, provides an eco-friendly design for the front side that will be exposed to the outside, and enables plantation by inserting earth and sand in the rear side.
    • 本发明涉及一种用于斜坡加固的就地楼梯型挡土墙的施工方法,更具体地说,涉及一种使用不需要的PC面板的现浇阶梯式挡土墙的施工方法 用于现浇混凝土的模具,可以替代楼梯型挡土墙。 对于本发明,使用不需要模具的PC面板的用于斜坡加固的就地放置阶梯型挡土墙通过生产可以以各种形式重复大规模生产的预制混凝土(PC)来构造, 替换模具,并在PC面板固定时倒入回填混凝土。 本发明的替代楼梯型挡土墙的施工方法能够通过在预先制造和移动PC板之后通过在“回填混凝土”或“回填混凝土+砂土”构成后侧来形成期望的形状,其中 在正面尺寸刻印图案,缩短施工周期,节省施工成本,为前面暴露于外部提供环保设计,通过将砂土插入,实现种植 后方。
    • 7. 发明公开
    • 절토부 자립식 보강토 블럭의 설치방법
    • 方法构造保留墙切割部分地面
    • KR1020130062515A
    • 2013-06-13
    • KR1020110128791
    • 2011-12-05
    • (주)에스오씨산업
    • 이희춘
    • E02D29/02E02D17/20E02D5/22
    • E02D29/02E02D5/22E02D17/20E02D29/0275E02D2300/002
    • PURPOSE: A self-supporting type reinforcement soil block installation method for excavated ground is provided to apply to a construction site which is non-applicable for an earth anchor and nailing due to obstructions such as properties. CONSTITUTION: A self-supporting type reinforcement soil block installation method for excavated ground comprises the following steps: embedding a pile into a bottom surface between a slope and the ground(S10); pouring foundation concrete to the bottom surface with embedded piles(S20); installing a reinforced soil block partly on the top of the foundation concrete by laminating(S30); installing a first drainage layer on the top of the foundation concrete positioned in between the side and slope of the reinforced soil block(S40); pouring concrete on the top of the first drainage layer positioned in between the side and slope of the reinforced soil block(S50); installing a second drainage layer on the top of the foundation concrete positioned in between the side and slope of the reinforced soil block(S60); and backfilling the remaining space positioned in between the side and slope of the reinforced soil block(S70). [Reference numerals] (S10) Install a pile; (S20) Pour foundation concrete; (S30) Install a reinforcement soil block; (S40) Install a first drainage layer; (S50) Pour concrete; (S60) Install a second drainage layer; (S70) Backfill
    • 目的:提供一种用于挖掘地面的自支撑型加固土块安装方法,适用于不适用于地锚和施工现场的施工现场,由于属性等障碍物而造成的打钉。 构成:挖掘地面的自支撑型加固土块安装方法包括以下步骤:将桩嵌入斜坡与地面之间的底面(S10); 用埋地桩将基础混凝土浇注到底面(S20); 通过层压将部分加固在地基混凝土顶部的增强土块安装(S30); 在位于加固土体块的侧面和斜面之间的基础混凝土的顶部上安装第一排水层(S40); 将混凝土浇筑在位于加固土块侧面和坡面之间的第一排水层的顶部(S50); 在位于加固土体块的侧面和斜面之间的基础混凝土的顶部上安装第二排水层(S60); 并回填位于加固土体块的侧面和斜面之间的剩余空间(S70)。 (附图标记)(S10)安装桩; (S20)浇注基础混凝土; (S30)安装加筋土块; (S40)安装第一排水层; (S50)浇注混凝土; (S60)安装第二排水层; (S70)回填
    • 9. 发明授权
    • 자연석을 이용한 다층 옹벽구조물 및 그 시공방법
    • 使用自然条纹的多层反向结构
    • KR101206668B1
    • 2012-11-29
    • KR1020120012120
    • 2012-02-07
    • 김진호
    • 김진호
    • E02D29/02E02D17/20E02D5/28
    • E02D29/02E02D5/28E02D17/20E02D29/0275E02D2200/13E02D2300/002
    • PURPOSE: A multi-layer retaining wall structure using natural stones and a construction method thereof are provided to remarkably reduce construction time and costs by simplifying construction processes. CONSTITUTION: A multi-layer retaining wall structure using natural stones comprises a concrete layer(21), steel pipes(30), first-stage, second-stage, and third-stage decoration stones(35a,35b,35c), first-stage, second-stage, and third-stage anchor bars(38a,38b,38c), and a soil pavement layer(41a,41b,14c). The concrete layer is formed on the ground(1) of a slope(3) and supports the bottoms of the steel pipes and the first-stage decoration stones. The steel pipes are formed in an L-shape. The front surfaces of the first-stage decoration stones are exposed to the front of the slope. The second-stage decoration stones are arranged to be meshed with the rear tops of the first-stage decoration stones. The third decoration stones are arranged to be meshed with the rear tops of the second-stage decoration stones. The first-stage, second-stage, and third-stage anchor bars connect the first-stage, second-stage, and third-stage decoration stones to the steel pipes, respectively. The soil pavement layer is formed by filling the rear surfaces of the first-stage, second-stage, and third-stage decoration stones with soil.
    • 目的:通过简化施工过程,提供了采用天然石材的多层挡土墙结构及其施工方法,大大减少施工时间和成本。 构成:使用天然石材的多层挡土墙结构包括混凝土层(21),钢管(30),第一级,第二级和第三级装饰石(35a,35b,35c) (38a,38b,38c)和土壤路面层(41a,41b,14c)。 混凝土层形成在斜坡(3)的地面(1)上,并支撑钢管的底部和第一阶段装饰石。 钢管形成为L形。 第一阶段装饰石头的前表面暴露在斜坡前面。 第二阶段装饰石被布置成与第一阶段装饰石头的后顶部啮合。 第三装饰石被布置成与第二阶段装饰石头的后顶部啮合。 第一阶段,第二阶段和第三阶段锚杆分别将第一阶段,第二阶段和第三阶段装饰石头连接到钢管。 土体路面层是通过填充第一段,第二段和第三段装饰石的后表面与土壤形成的。
    • 10. 发明公开
    • 토압전달용 조립식 거푸집 유니트 및 이를 이용한 암반구간에서 지하역타시 토압지지방법
    • 组装工程单位和支持山顶土压力的方法
    • KR1020120125865A
    • 2012-11-19
    • KR1020110043574
    • 2011-05-09
    • 주식회사 한빛구조엔지니어링
    • 이정배이범택
    • E02D29/045E21D9/04E02D5/22E02D29/02
    • E02D29/045E02D5/22E02D29/0275E02D2250/0007E02D2250/0023E02D2300/002E21D9/04
    • PURPOSE: A prefabricated mold unit for soil pressure transmission and a soil pressure supporting method for a topdown construction are provided to reduce construction costs and periods by using unique soil pressure transmission mechanism that the bedrock has and to reduce material costs by reusing used materials. CONSTITUTION: A prefabricated mold unit for soil pressure transmission comprises a slab support body(100), an extension body(200), a connecting unit(300), and a support frame(400). One end of the slab support body is connected to a slab and the other end thereof is connected to the extension body. One end of the extension body is connected to the slab support body and the other end thereof is connected to an H-pile installed on the bedrock. The connecting unit connects the slab support body and the extension body. The support frame is connected to the H-pile and supports the slab support body and the extension body. [Reference numerals] (AA) H-pile; (BB) Bedrock; (CC) Underground outer wall; (DD) Slab; (EE) Inside line of the underground outer wall
    • 目的:提供一种用于土压力传递的预制模具单元和用于自升式施工的土压力支撑方法,通过使用基岩具有的独特的土压力传递机构,通过重复使用材料降低材料成本,从而降低施工成本和时间。 构成:用于土压力传递的预制模具单元包括板支撑体(100),延伸体(200),连接单元(300)和支撑框架(400)。 板坯支撑体的一端连接到板坯,另一端连接到延伸体。 延伸体的一端连接到板状支撑体,另一端与安装在基岩上的H型桩连接。 连接单元连接板坯支撑体和延伸体。 支撑框架连接到H型桩,并支撑板坯支撑体和延伸体。 (标号)(AA)H型桩; (BB)基岩; (CC)地下外墙; (DD)板; (EE)地下外墙内线