    • 6. 发明专利
    • Excavator shaft and construction method thereof
    • 挖掘机轴及其施工方法
    • JP2013036305A
    • 2013-02-21
    • JP2011175762
    • 2011-08-11
    • Taisei Corp大成建設株式会社
    • NISHIDA YASUO
    • E21D5/11E21D9/06
    • PROBLEM TO BE SOLVED: To provide an excavator shaft for allowing easy pull-up of a core material, and a construction method thereof.SOLUTION: An excavator shaft 1 from/at which a tunnel excavator 2 starts/arrives includes an earth retaining wall 10 having a steel core material 11 and a cement-based hardened body 12. In the earth retaining wall 10 above a position P where a mouth should be formed as a position from/at which the tunnel excavator 1 starts/arrives, a steel pipe 13 is provided through which the core material 11 is inserted. The peripheral face of the core material 11 inserted through the steel pipe 13 is covered with a resin thin layer material 20 so that the core material 11 can be pulled up from the position P where the mouth should be formed.
    • 要解决的问题:提供一种用于允许容易上芯的材料的挖掘机轴及其构造方法。 解决方案:隧道挖掘机2开始/到达的挖掘机轴1包括具有钢芯材料11和水泥基硬化体12的挡土墙10.在挡土墙10上方的位置 P应该形成为隧道挖掘机1开始/到达的位置,设置有芯材11插入的钢管13。 通过钢管13插入的芯材11的周面被树脂薄层材料20覆盖,使得芯材11能够从应该形成嘴的位置P被拉起。 版权所有(C)2013,JPO&INPIT
    • 7. 发明专利
    • Vertical shaft wall structure
    • 垂直轴瓦结构
    • JP2012031684A
    • 2012-02-16
    • JP2010173587
    • 2010-08-02
    • Sekisui Chem Co Ltd積水化学工業株式会社
    • OKAMOTO RYOTA
    • E21D5/11
    • PROBLEM TO BE SOLVED: To provide a vertical shaft wall structure in which a start or arrival section for a shield machine of the peripheral wall of a vertical shaft can be easily cut by the shield machine; in which the partition wall portion of a preceding element forming frame can be thin-walled; in which assembly workability of the preceding element forming frame is improved.SOLUTION: A ease of cutting material portion 11c of the first partition wall portion of a first preceding element forming frame 1 used for a start or arrival section for a shield machine S and a first free cutting reinforcement portion 13a formed of ease of cutting material of a reinforcement core material portion adjacent to the partition wall are maintained at an interval via a plurality of interval maintaining materials 15 intermittently provided in the vertical direction of the first preceding element forming frame 1.
    • 要解决的问题:提供一种垂直轴壁结构,其中垂直轴的周壁的屏蔽机的起始或到达部分可以被屏蔽机容易地切割; 其中先前元件形成框架的分隔壁部分可以是薄壁的; 其中改进了前一个元件形成框架的组装可操作性。 解决方案:用于屏蔽机S的起始或到达部分的第一前一个元件成形框架1的第一分隔壁部分的切割材料部分11c和易于形成的第一自由切割加强部分13a 通过在第一先前的元件成形框架1的上下方向间歇地设置的多个间隔保持材料15,将分隔壁附近的加强芯材部分的切割材料保持间隔。(C)2012 ,JPO&INPIT
    • 9. 发明专利
    • Cuttable joint structure
    • 可切割接头结构
    • JP2011001750A
    • 2011-01-06
    • JP2009145575
    • 2009-06-18
    • Nippon Steel Materials Co Ltd新日鉄マテリアルズ株式会社
    • YOSHIZAWA HIROYUKI
    • E21D9/06E21D5/11
    • PROBLEM TO BE SOLVED: To provide a joint structure which can be cut by a shield machine, and enhances strength transferred by one bolt by constituting a joint with a plurality of shear displacement surfaces, in a fiber-reinforced rein reinforcing material for an earth retaining wall materials joined to each other.SOLUTION: Slit-like key grooves 51a and 51b are formed in width directions of flanges 2a and 2b over predetermined distances in longitudinal axial directions from joint surfaces 1Ca and 1Cb of first and second members 1A and 1B in the flanges 2a and 2b of the first and second members 1A and 1B. Mounting holes 35 which are fitted to the key grooves 51a and 51b of the first and second members 1A and 1B, into which splicing key members 52 capable of being cut by the shield machine are inserted, and which pass through the flanges 2a and 2b and the splicing key members 52 are formed. A fixing shaft member capable of being cut by the shield machine is inserted into the mounting hole 35, so that the first and second members 1A and 1B can be integrally joined to each other.
    • 要解决的问题:提供一种能够通过屏蔽机切割的接合结构,并且通过在多个剪切位移表面构成接头来提高由一个螺栓传递的强度,在用于接地保持的纤维增强的增强材料中 壁材料彼此连接。解决方案:在第一和第二构件1A和1B的接合表面1Ca和1Cb上,在凸缘2a和2b的宽度方向上沿纵向轴向方向预定距离形成狭缝状的键槽51a和51b 第一和第二构件1A和1B的凸缘2a和2b。 安装孔35,其安装在第一和第二构件1A和1B的键槽51a和51b上,第一和第二构件1A和1B的键槽51a和第二构件1A,1B被插入到能够被屏蔽机器切割的拼接键构件52中,并穿过凸缘2a和2b和 形成拼接键构件52。 能够被屏蔽机切割的固定轴构件插入到安装孔35中,使得第一和第二构件1A和1B可以彼此一体地接合。
    • 10. 发明专利
    • Wall member for constructing vertical shaft or adit
    • 用于构造垂直轴或座的墙壁构件
    • JP2010106443A
    • 2010-05-13
    • JP2008276545
    • 2008-10-28
    • Nippon Steel & Sumikin Metal Products Co LtdShowa Concrete Ind Co Ltd日鐵住金建材株式会社昭和コンクリート工業株式会社
    • OTAKA NORIHIROOKAZAKI KAZUHIRO
    • E21D5/06E21D5/11
    • PROBLEM TO BE SOLVED: To enable construction without the need for a reinforcing ring when a tubular or semi-tubular body for earth retaining is formed of a liner plate. SOLUTION: In the construction of the vertical shaft etc., a plurality of wall members 21 are connected to one another in the circumferential or axial directions of the vertical shaft so as to form the tubular or semi-tubular body for earth retaining. The liner plates 1 are used as a plurality of wall member bodies for being connected in the circumferential or axial directions of the vertical shaft; and a highly-ductile fiber-reinforced cementitious composite layer 23 is formed on a corrugated surface of the liner plate 1. Since the highly-ductile fiber-reinforced cementitious composite is highly ductile, strength can be increased without deteriorating deformability as characteristics of the liner plate 1. The increase of the strength enables flanges 3 of the upper and lower liner plates to be directly connected to each other by means of a bolt 12 without an intermediary of the reinforcing ring, and enhances construction performance. COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:当用于挡土板的管状或半管状体由衬板形成时,能够构造而不需要加强环。 解决方案:在垂直轴等的构造中,多个壁构件21沿垂直轴的周向或轴向彼此连接,以形成用于接地保持的管状或半管状体 。 衬板1用作在垂直轴的周向或轴向上连接的多个壁构件体; 并且在衬板1的波纹表面上形成高韧性的纤维增强水泥质复合层23.由于高韧性纤维增强水泥质复合材料具有高延展性,因此可以提高强度,而不会劣化作为衬垫特性的变形性 强度的增加使得上下衬板的凸缘3能够通过螺栓12直接连接,而不需要加强环的中间,并且提高了施工性能。 版权所有(C)2010,JPO&INPIT