    • Reinforcement structure and reinforcement method of existing structure
    • 现有结构的加固结构和加固方法
    • JP2009235693A
    • 2009-10-15
    • JP2008080779
    • 2008-03-26
    • Ihi Corp株式会社Ihi
    • MICHISUGA YUICHIYABUNO MASASHI
    • E01D6/00E01D22/00E04G23/02
    • PROBLEM TO BE SOLVED: To provide a reinforcement structure and a reinforcement method capable of suitably suppressing buckling of a diagonal member in an existing structure.
      SOLUTION: In the structure for reinforcing an existing structure having a plurality of box-shaped sectional vertical members 1 and 2 disposed at intervals in a predetermined direction, and each diagonal member 3 disposed between the vertical members 1 and 2, a diaphragm member 12 is provided within the vertical member 1, and a strut 6 is laid between the joint part of the diaphragm member 12 in the vertical member 1 and a longitudinal middle part of the diagonal member 3. The diaphragm member 12 includes a first load support member 13 mutually connecting orthogonal middle parts orthogonal to the predetermined direction of the box-shaped section of the vertical member 1 and extending in the predetermined direction and a second load support member 14 connecting a longitudinal middle part of the first load support member 13 to a corner part of the box section of the vertical member 1.
      COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:提供一种能够适当地抑制现有结构中的对角构件的屈曲的加强结构和加强方法。 解决方案:在用于加强具有沿预定方向间隔设置的多个箱形截面垂直构件1和2的现有结构的结构中,并且每个对角构件3设置在垂直构件1,2之间,隔膜 构件12设置在垂直构件1内,并且支柱6铺设在垂直构件1中的隔膜构件12的接合部分和对角构件3的纵向中间部分之间。隔膜构件12包括第一负载支撑 相互垂直于垂直构件1的箱形部分的预定方向并沿预定方向延伸的正交中间部分的构件13和将第一负载支撑构件13的纵向中间部分连接到第一负载支撑构件13的第二负载支撑构件14 垂直成员1的盒部分的角部分。版权所有(C)2010,JPO&INPIT
    • 8. 发明专利
    • Method and structure for reinforcing bridge
    • 加强桥梁的方法与结构
    • JP2009167716A
    • 2009-07-30
    • JP2008007879
    • 2008-01-17
    • Ihi Corp株式会社Ihi
    • MICHISUGA YUICHISUZUKI MASANAO
    • E01D22/00E01D6/00
    • PROBLEM TO BE SOLVED: To solve the problem that the reinforcement of a splicing section of an existing bridge is less efficient.
      SOLUTION: This reinforcing method is applied to the existing bridge 1 which is composed of a plurality of steel girder members 2 and constituted by making the girder members 2 bolted together via a splice plate 3. In the reinforcing method, a bypass member 6 is composed of stress introduction plates 7 and 7 which are provided on both the longitudinal sides of the girder member 2 fitted with the splice plate 3, and a bypass rib 8 for transferring stress by connecting the stress introduction plates 7 and 7 together; the bypass member 6 is applied on both the sides of the splice plate 3 in such a manner as to set the bypass member 6 to straddle the splice plate 3; and the stress introduction plates 7 and 7 are fastened to the girder member 2 by means of a bolt 10.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:解决现有桥梁的拼接部分的加固效率较低的问题。 解决方案:该加强方法适用于由多个钢梁构件2构成的现有桥1,并且通过使接头板3将梁构件2螺栓固定在一起构成。在加强方法中,旁路构件 6由应力引导板7和7组成,它们设置在装配有接合板3的梁构件2的两个纵向侧上;以及旁路肋8,用于通过将应力导入板7和7连接在一起而传递应力; 旁路构件6以将旁路构件6设置成跨越拼接板3的方式施加在拼接板3的两侧; 并且应力引入板7和7通过螺栓10紧固到梁构件2上。版权所有(C)2009,JPO&INPIT