    • 7. 发明专利
    • LINING METHOD OF PIPE CONDUIT
    • JPH11115052A
    • 1999-04-27
    • JP27698097
    • 1997-10-09
    • TOKYO GAS CO LTD
    • HAYASHI MITSUTOSHIMINAMI TOMOYUKIMAKI YUUICHIMIZUKAMI SEIJI
    • F16L1/00B29C63/34B29C63/36B29L23/00
    • PROBLEM TO BE SOLVED: To smoothly conduct both insertion and expansion-restoration of a folding pipe into a pipe conduit by forcibly cooling a pipe given a folding work immediately before the inlet of a pipe conduit at its outer surface from the outside while being restrained in the state to be set stationarily in a folded shape. SOLUTION: A pipe 1 passes through a deformation working zone A to a restraint cooling zone B during movement from a drum 2 toward a pipe conduit inlet a1. While being passed through the deformation working zone A, the pipe 1 is gradually deformation worked from a flat pipe shape to a U-shaped folded shape, and its effective outer diameter is reduced to be a size capable of being inserted in a pipe conduit (a). During the period of passing through the restraint cooling zone B, a U-shaped folded pipe is subjected to a forcible cooling operation in a configurationally restrained shape. A forcible cooling device 9 is installed over the substantially entire length of the restraint cooling zone B, and a cooling spouting mold 9a and cold air blowing mold 9b are applied so that the pipe is set stationarily by forcible cooling in a configurationally restrained shape as being folded into a U-shaped form.
    • 10. 发明专利
    • PROPULSION OF DOUBLE PIPE
    • JPH07279586A
    • 1995-10-27
    • JP7485694
    • 1994-04-13
    • TOKYO GAS CO LTDISEKI TORY TECH INC
    • HAYASHI MITSUTOSHINAGASHIMA SHINGOKURASHINA MINORUIYAMA MAKOTOUNO HIDEKISATO TORU
    • E21D9/06F16L1/024
    • PURPOSE:To shorten the construction period by executing a plurality of works at the same time, when a double pipe consisting of an inner pipe and an outer pipe is propelled. CONSTITUTION:An excavating machine 11 for excavating a bank is arranged at the head, and an original pushing device 13 for starting shaft is installed. In succession with the excavating machine 11, a top pushing device 12 is arranged, and a double pipe A consisting of an inner pipe 2 for the flow of the gas substance inside and an outer pipe 2 keeping a prescribed gap from the inner pipe 1 is succeeded with the device 13. The outer pipe 2 of the double pipe A which is propelled already is connected with the wall surface in the starting shaft, and only the excavating machine 11 is propelled by operating the top pushing device 12. In parallel to this propulsion, the inner pipe 1 of a new double pipe A is welded with the inner pipe 1 of the double pipe A which is already propelled. After the propulsion of the excavating machine 11 by the top pushing device 12 and the connection with the inner pipe 1 complete, the connection between the outer pipe 2 of the double pipe A which is already propelled and the wall surface is released, and a thrust is applied to the new double pipe A by operating the original pushing device 13, and the top pushing device 12 is contracted at the same time.