会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 9. 发明专利
    • GRAFTING DEVICE
    • JPH08140474A
    • 1996-06-04
    • JP31414294
    • 1994-11-24
    • MITSUBISHI HEAVY IND LTDMITSUBISHI AGRICULT MACH
    • MANABE YUKIOTANIMOTO TATEOMASUMOTO MASANORIITO KENJIMISHIRO MITSURUAKISHIKA OSAMUYAMAMOTO KOICHINANBA IZUMI
    • A01G1/06
    • PURPOSE: To provide a grafting device equipped with a detecting means for a scion, capable of discovering the position of a colyledon for a scion seedling, slightly developing a scion, having an improved rooting ratio. CONSTITUTION: This grafting device is equipped with a detecting means 41 for a scion, capable of discovering the position of a colyledon for a scion seedling, a detecting means 41' for a stock, capable of discovering the position of a colyledon for a stock seedling, a cutting position adjusting means 34 for a scion, capable of lowering a scion seedling to a lower position based on a cutting means 21 for the scion seedling, a cutting position adjusting means for a stock, capable of lowering a stock seedling to a lower position based on a cutting means 23 for the stock seedling, a controlling means for a scion, regulating the cutting position adjusting means 34 for the scion so as to cut a hypocotyl for a scion based on the detection of the detecting means 41 for a scion at a position of length corresponding to clip insertion length downward from the cotyledon base part of the hypocotyl as a starting point and a controlling means for a stock, regulating the cutting position adjusting means for the stock so as to cut a hypocotyl for a stock based on the detection of the detecting means 41' for a stock at a position right under the cotyledon base part.
    • 10. 发明专利
    • METHOD AND APPARATUS FOR ERECTING TOWERLIKE STRUCTURE
    • JPH0782799A
    • 1995-03-28
    • JP22703293
    • 1993-09-13
    • MITSUBISHI HEAVY IND LTD
    • INOUE SHIGEOMANABE YUKIOFUKUMOTO MASASHIHIRAO KATSUYUKIKATAYAMA YOSHIYUKITAKEUCHI YOSHIHITO
    • E04B1/35E04G21/14E04G21/16E04H12/28
    • PURPOSE:To shorten a construction period, by a method wherein a work platform mechanism is lifted by jacking-up devices being raised along external board-reinforcing members, following which a set of horizontal beams are stacked in multistage shape and the work platform mechanism is simultaneously raised, and thus blocks of a towerlike structure and horizontal beams are fixed. CONSTITUTION:Internal and external cylindrical blocks 3a, 4a are progressively lifted by a tower crane 1, and the external cylindrical blocks 4a divided and the internal cylindrical blocks 3a are respectively installed at an upper work platform 11a and at a lower work platform 11b. At this time, stoppers 91, 92 for each of guide supports 9 are engaged with a ring 12, securing pins for upper and lower clamping devices each are inserted into pin holes, and thus supporting devices for masts 10 are ready to break away from the ring 12. After that, the work platforms 11a, 11b are lifted by jacking-up devices, the masts 10 are moved to the most upper position and supporting devices for the masts 10 are engaged with a ring 12. During this work, horizontal beams 7 are placed, following which the stoppers 91, 92 are allowed to break away from the ring 12 and the jacking-up devices are lowered by operating and thus the guide supports 9 rise. After that, the upper and lower stoppers 91, 92 are engaged with a ring 12 and the supporting devices for the masts 10 are allowed to break away from the ring 12. Such erecting movements are repeated and a chemney stack is progressively erected.