会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Building outer wall inspection device and system
    • 建筑外墙检查装置和系统
    • JP2009052958A
    • 2009-03-12
    • JP2007218466
    • 2007-08-24
    • Penta Ocean Construction Co Ltd五洋建設株式会社
    • TANI YUICHINAKAMURA HARUOYAMAURA ICHIRO
    • G01N29/12E04G23/02
    • PROBLEM TO BE SOLVED: To provide a building outer wall inspection device and a system capable of performing an inspection work of a building outer wall by remote operation, and performing an accurate inspection work by fixing an inspection device body surely to the outer surface.
      SOLUTION: This building outer wall inspection device 10 is equipped with the inspection device body 11 for acquiring inspection data by performing a defect detection operation to the building outer wall; a lateral member 12 suspended from a building upper part, disposable oppositely to the wall surface, for mounting thereon the inspection device body movably in the lateral direction; lifting parts 13, 14 for lifting the lateral member; and a fixing means capable of fixing the lateral member onto the wall surface when performing the detection operation.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种建筑物外墙检查装置和能够通过远程操作进行建筑物外墙检查工作的系统,并且通过将检查装置本体固定到外部来进行精确的检查工作 表面。 解决方案:该建筑物外墙检查装置10配备有检查装置主体11,用于通过对建筑物外壁执行缺陷检测操作来获取检查数据; 悬挂在建筑物上部的横向构件12,与墙壁表面相反地一次地安装,用于沿横向可移动地安装检查装置主体; 起重部件13,14用于提升侧部件; 以及当执行检测操作时能够将侧面构件固定到壁表面上的固定装置。 版权所有(C)2009,JPO&INPIT
    • 2. 发明专利
    • Beam-column joint unit and construction method of beam-column joint
    • 梁柱接头单元和梁柱接头的构造方法
    • JP2009235680A
    • 2009-10-15
    • JP2008080156
    • 2008-03-26
    • Penta Ocean Construction Co Ltd五洋建設株式会社
    • TAKEUCHI HIROYUKIYAMAURA ICHIRO
    • E04B1/21E04B1/58
    • PROBLEM TO BE SOLVED: To provide a beam-column joint unit and a construction method of a beam-column joint which enable the rationalization of the construction of a reinforced concrete structure and the shortening of a construction period when the beam-column joint of reinforced concrete construction is precast (PCa).
      SOLUTION: The beam-column joint unit 10 is integrated by being precast so as to constitute a joint between a column of the reinforced concrete construction and a beam of a precast member. The beam-column joint unit comprises a column joint 20 joined to the column, and at least two beam joints 11-14 which are protruded from a side surface of the column joint so as to be joined to the beam. The beam joint has a placement portion 15 which enables the beam to be placed on a surface joined to the beam.
      COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:提供一种梁柱接头单元和梁柱接头的施工方法,其能够使钢筋混凝土结构的构造合理化,并且当梁柱的施工周期缩短时 钢筋混凝土结构接头是预制(PCa)。 解决方案:梁柱接头单元10通过预制构成一体,以便构成钢筋混凝土结构的柱与预制构件的梁之间的接头。 梁柱接头单元包括连接到柱的柱接头20和从柱接头的侧表面突出以至于梁连接的至少两个梁接头11-14。 梁接头具有一个放置部分15,该放置部分使光束能够放置在与光束连接的表面上。 版权所有(C)2010,JPO&INPIT
    • 5. 发明专利
    • Pile head processing construction method and simple charge holder
    • 桩头加工施工方法和简单充电架
    • JP2007217947A
    • 2007-08-30
    • JP2006039320
    • 2006-02-16
    • Institute Of National Colleges Of Technology JapanPenta Ocean Constr Co Ltd五洋建設株式会社独立行政法人国立高等専門学校機構
    • YAMAURA ICHIROKATO MASATOSHINAKAMURA YUICHI
    • E02D5/34
    • PROBLEM TO BE SOLVED: To provide a pile head processing construction method capable of easily and highly accurately processing a pile head in low vibration and low noise in a short period.
      SOLUTION: In this pile head processing construction method, a ring-shaped horizontal partition plate 34 is prearranged inside the pile head to a cast-in-place concrete pile, and a high energy substance 35 is installed in a simple charge holder 21 having a dynamic action concentrating rectangular cavity 1 of an exploded shock wave and/or expanded gas pressure inside the pile head. Crack progress in the substantially vertical direction to a pile from a wall surface of a charge hole 5, is controlled by using the concentrative effect of the exploded shock wave and/or the expanded gas pressure generated in the charge hole, and the dynamic effect of the exploded shock wave and/or the expanded gas pressure generated in the charge hole is reflected or guided by the horizontal partition plate. Concrete of a part for processing the pile head is separated by controlling the crack progress in the substantially horizontal direction along the horizontal partition plate by using its effect.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种能够在短时间内以低振动和低噪声容易且高精度地加工桩头的桩头加工施工方法。 解决方案:在这种桩头加工施工方法中,将环形水平分隔板34预先安置在桩头内部到现浇混凝土桩,高能量物质35安装在简单的充电架 21具有集中在爆破冲击波的矩形腔1和/或桩头内的膨胀气体压力的动态作用。 通过使用爆炸冲击波的集中效应和/或充电孔中产生的膨胀气体压力来控制从充电孔5的壁表面到基本垂直方向到堆的进展,以及充电孔5的动态效果 在充电孔中产生的爆炸冲击波和/或膨胀气体压力被水平分隔板反射或引导。 通过使用其效果,通过控制沿着水平隔板的大致水平方向的裂纹进展来分离用于加工桩头的部分的混凝土。 版权所有(C)2007,JPO&INPIT
    • 6. 发明专利
    • Test specimen for confirming filling properties of concrete
    • 确定混凝土填充性能的试验样品
    • JP2006112927A
    • 2006-04-27
    • JP2004300876
    • 2004-10-15
    • Penta Ocean Constr Co Ltd五洋建設株式会社
    • MORI TATSUYAYAMAURA ICHIROTAKEUCHI HIROYUKI
    • G01N33/38G01F22/00
    • PROBLEM TO BE SOLVED: To provide a test specimen which enables confirmation of the filling properties and behavior of concrete under specific conditions.
      SOLUTION: This test specimen is equipped with a test specimen body 25, which is formed into a box shape by both the rectangular front and rear-surface templates 21 and 22 arranged in parallel so as to leave an interval in the forward and rearward directions, a fixed short side surface template 23 for closing one short side-short side interval parts of both front and rear-surface templates and a fixed long side surface template 24 for closing long side-long side interval parts of both front and rear-surface templates and constituted so that the other long side-long side interval parts and short side-short side interval parts of long side-long side interval parts are opened a test piece main body 25 constituted so that both front and rear-surface templates are installed so as to set the opened long side-long side interval parts or short side-short side interval parts to an upper side, an on-off type short side surface template 26 for closing the other short side-short side interval parts in openable manner, and an on-off type long side surface template 27 for closing the other long side-long side interval parts in openable manner. Rod-shaped obstacles 30 and 30, supposing reinforcing connection materials, such as studs or the like, are attached to the inside surfaces of the respective templates.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种能够在特定条件下确认混凝土的填充性能和性能的试样。 解决方案:该试样配备有被测试体25,该试样体25通过平行布置的矩形前后模板21和22两者形成为箱形,以便在前方留下间隔, 用于封闭前表面和后表面模板的一个短边短边间隔部分的固定短边表面模板23和用于封闭前后两个长边侧间隔部分的固定长边侧模板24 构成为使得长边长间隔部分的其他长侧长边间隔部分和短侧短边间隔部分被打开,试件主体25被构造成使得前表面和后表面模板 被安装成将开放的长侧长边间隔部分或短侧短边间隔部分设置在上侧,用于闭合另一短边短边间隔pa的开关型短边表面模板26 并且可开启地封闭另一长边侧长间隔部分的开 - 关型长侧面模板27。 杆状障碍物30和30,假设加强连接材料(例如螺柱等)附接到各个模板的内表面。 版权所有(C)2006,JPO&NCIPI
    • 7. 发明专利
    • Method and device for filling concrete in concrete filled steel pipe column
    • 在混凝土填充钢管柱中填充混凝土的方法和装置
    • JP2005200849A
    • 2005-07-28
    • JP2004005793
    • 2004-01-13
    • Penta Ocean Constr Co Ltd五洋建設株式会社
    • TAKEUCHI HIROYUKIYAMAURA ICHIRO
    • E04B1/30E04C3/34E04G21/02
    • PROBLEM TO BE SOLVED: To increase working efficiency by performing the other workings using a hoist in parallel with the placement of concrete without occupying the hoist when concrete is fallen and placed.
      SOLUTION: As a guide pipe 1 for placing concrete, a longitudinally extensible structure formed by fitting a plurality of unit pipes 10a to 10d to each other so as to be slid in the axial direction is used, and a manual winch 15 for controlling the height of a lower end opening is fitted to the guide pipe 1. The guide pipe 1 is inserted into a steel pipe column 20, the upper end side of the guide pipe 1 is fixed to the steel pipe column 20, and concrete filling operation is performed. According to the height of filling of the concrete in the steel pipe column, the height of the lower end opening is controlled by the winch 15.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:为了提高工作效率,通过使用葫芦进行其他工作,与混凝土的放置平行而不占用起重机,当混凝土下落和放置时。 解决方案:作为用于放置混凝土的引导管1,使用通过将多个单位管10a〜10d彼此嵌合以沿轴向滑动而形成的纵向延伸结构,并且使用手动绞盘15 控制下端开口的高度安装在导管1上。导管1插入钢管柱20中,导管1的上端侧固定在钢管柱20上,混凝土填充 执行操作。 根据钢管柱中混凝土的填充高度,下端开口的高度由绞车15控制。版权所有(C)2005,JPO&NCIPI