    • Widening device and widening method for existing tunnel
    • JP2004360342A
    • 2004-12-24
    • JP2003161612
    • 2003-06-06
    • Ohbayashi Corp株式会社大林組
    • KAWAI MASAHIKOMIURA MASAHIKOOURA MICHIYAFUJII TAKESHI
    • E21D9/01
    • PROBLEM TO BE SOLVED: To provide a widening device and a widening method for an existing tunnel, which are improved in working efficiency. SOLUTION: The widening device 10 is for use in constructing a widened tunnel D on an outer peripheral side of an existing tunnel A, and formed of a leading stand 12, a trailing stand 14, a moving stage 16, widening work equipment 18, a transfer device 20, and a moving device 22. The stand 12 is arranged so as to be opposed to a working face of the widened tunnel and movable along a tunnel axial direction. The stand 14 is arranged adjacently to the rear of the stand 12, and movable along the tunnel axial direction. The stage 16 is arranged on a ceiling portion of the stand 14 in a manner movable along a tunnel circumferential direction. The equipment 18 is mounted on the ceiling portion of the stand 14 in a manner movable along the tunnel axial direction. The transfer device 20 selects pieces of the equipment 18 according to the procedure of widening works, and transfers the selected pieces from the stand 14 to the stage 16 to be mounted on the same. The moving device 22 moves the selected pieces of the equipment 18 mounted on the stage 16 along the tunnel circumferential direction while setting the selected pieces in a readily available state for the widening works. COPYRIGHT: (C)2005,JPO&NCIPI
    • 8. 发明专利
    • Tunnel reinforcing structure, its construction method, and timbering used therefor
    • 隧道施工结构及其施工方法及其使用的木材
    • JP2010019031A
    • 2010-01-28
    • JP2008181898
    • 2008-07-11
    • Ohbayashi Corp株式会社大林組
    • OURA MICHIYA
    • E21D11/10E21D15/00
    • PROBLEM TO BE SOLVED: To provide a tunnel reinforcing structure easily and safely constructed in a simple structure and capable of surely integrating a tunnel wall surface with a timbering using spray concrete, its construction method, and the timbering used therefor.
      SOLUTION: In this tunnel reinforcing structure 1, an enlarged space 22 is formed by enlarging the bottom part of the inner peripheral wall 20 of an excavated tunnel and the timbering 10 is built in such a manner that reinforcements 14 are stored in the enlarged space 22. The timbering comprising a timbering body 12 for supporting the inner peripheral wall 20 of the tunnel and the reinforcements 14 both ends of which are fixed to the leg of the timbering body 12 and which are provided in such a manner as to extend from the timbering body 12 to the earth side is installed on the inner peripheral wall 20 of the tunnel in which the enlarged space 22 is formed. The inner peripheral wall 20 of the tunnel is sprayed with concrete 24 in such a manner that the reinforcements 14 stored in the enlarged space 22 and the timbering body 12 are formed integrally with each other.
      COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:提供一种以简单结构容易安全地构造的隧道加固结构,并且能够使用喷雾混凝土,其施工方法和使用的木材确定地将隧道壁面与木材整合。 解决方案:在该隧道加固结构1中,通过扩大挖掘隧道的内周壁20的底部而形成扩大的空间22,并且木材10被构造成使得加强件14储存在 扩大的空间22.木材包括用于支撑隧道的内周壁20的木材主体12和两个固定在木材主体12的腿上的加强件14,并且它们以延伸的方式设置 从建筑体12到地侧安装在其中形成有扩大空间22的隧道的内周壁20上。 隧道的内周壁20以这样的方式喷射混凝土24,使得储存在扩大空间22中的加强件14和木结构体12彼此一体地形成。 版权所有(C)2010,JPO&INPIT
    • 10. 发明专利
    • Tunnel control chart and its system
    • 隧道控制图及其系统
    • JP2004037419A
    • 2004-02-05
    • JP2002198695
    • 2002-07-08
    • Kansai Koji Sokuryo KkNakata Sokuryo:KkOhbayashi Corp株式会社中田測量株式会社大林組関西工事測量株式会社
    • NAKADA MASARUNAKANIWA KAZUHIDEOURA MICHIYA
    • E21D11/00G01C7/06G01N21/954
    • PROBLEM TO BE SOLVED: To provide a tunnel control chart capable of grasping a secular change of a tunnel easily and visually. SOLUTION: This tunnel control chart includes a base line (CL) for showing the line shape of a tunnel (2), a plurality of survey points [P(i)] set at prescribed intervals along the base line (CL) of the tunnel (2), and line segments having respectively the length corresponding to the section peripheral length (Di) calculated from the section measured at each survey point [P(i)] and extending in the direction perpendicular or approximately perpendicular to the base line (CL). An object (a changed state or a facility in the tunnel) including at least one of three-dimensional coordinate data is displayed on the control chart so that the three-dimensional coordinates can be specified by the distance from the base line (CL) and the distance from the survey point [P(i)]. COPYRIGHT: (C)2004,JPO
    • 要解决的问题:提供能够容易地和视觉地掌握隧道的长期变化的隧道控制图。 解决方案:该隧道控制图包括用于示出隧道(2)的线形的基线(CL),沿着基线(CL)以规定间隔设置的多个测量点[P(i)], 的隧道(2),并且分段具有对应于从每个测量点[P(i)]处测量的截面计算出的截面周长(Di)的长度的线段,并且在垂直于或大致垂直于底座的方向上延伸 线(CL)。 包括三维坐标数据中的至少一个的对象(隧道中的改变状态或设施)被显示在控制图上,使得三维坐标可以由基线(CL)和 距离测点[P(i)]。 版权所有(C)2004,JPO