    • 1. 发明专利
    • Search system, shield machine, and method of excavation by shield machine
    • 搜索系统,屏蔽机,以及屏蔽机械的挖掘方法
    • JP2011196068A
    • 2011-10-06
    • JP2010062937
    • 2010-03-18
    • Mitsubishi Heavy Industries Mechatronics Systems LtdOhbayashi Corp三菱重工メカトロシステムズ株式会社株式会社大林組
    • KANAI MAKOTOMATSUMOTO SHINMATOBA KAZUHIKOSUGIYAMA MASAHIKO
    • E21D9/06
    • PROBLEM TO BE SOLVED: To provide a search system which can acquire the information on a plurality of natural grounds near a facing and, based on the information on the plurality of natural grounds, can determine the stability of a natural ground, and to provide a shield machine having the search system and a method of excavation by the shield machine.SOLUTION: The shield machine 1 includes the search system 8 for searching the stability of the facing 7. The search system 8 includes: upper search devices 9 installed on the upper part of the shield machine 1; a forward search device 10 installed in the shield machine 1; cutting resistance detectors attached to a cutter head 2; a determining device 12 for determining the stability of the natural ground E based on the results measured by the upper search devices 9, the forward search device 10, and the cutting resistance detector; and a display 13 for displaying the results and determinations by the devices.
    • 要解决的问题:提供一种能够获取靠近面部的多个自然场地的信息的搜索系统,并且基于关于多个自然场地的信息可以确定自然地面的稳定性,并且提供一个 具有搜索系统的盾构机和盾构机的挖掘方法。解决方案:屏蔽机1包括用于搜索面部7的稳定性的搜索系统8.搜索系统8包括:上部搜索装置9,安装在上部 屏蔽机1的一部分; 安装在屏蔽机1中的正向搜索装置10; 安装在切割头2上的切割阻力检测器; 确定装置12,用于基于由上位搜索装置9,正向搜索装置10和切割阻力检测器测量的结果来确定自然地面E的稳定性; 以及显示器13,用于显示结果和由设备的确定。
    • 3. 发明专利
    • Liquefaction prevention method
    • 液体预防方法
    • JP2014148884A
    • 2014-08-21
    • JP2013019818
    • 2013-02-04
    • Ohbayashi Corp株式会社大林組
    • OKAMOTO TOSHIHARUSUNAMACHI YASUOYAMADA HIROSHIKANAI MAKOTOMIURA TOSHIHIKO
    • E02D3/08
    • PROBLEM TO BE SOLVED: To provide a liquefaction prevention method which prevents ground subsidence and reduces the occurrence of noise and vibration considerably and can be applied to a subgrade having a large fine-grained fraction content while considering p-H environment.SOLUTION: In an inventive liquefaction prevention method: at first, a casing pipe 2 is pressed vertically downward into a subgrade 1 which is a liquefaction prevention object to form a drill hole 3 in a shape in which a hole wall 5 is protected by the casing pipe 2 (a step 101); next, a filler 4 is charged in an internal space of the casing pipe 2 (a step 102); and next, the casing pipe 2 is extracted upward by the amount corresponding to the charged amount of the filler while pushing the filler 4 by the pressure of the air supplied into the casing pipe 2 (a step 103). Then, the steps 102 to 103 are repeatedly performed until the filler 4 is arranged in a pile shape, for example, over a depth range from a bottom surface of the drill hole 3 to the ground water level (a step 104).
    • 要解决的问题:提供一种防止地面沉降并且显着降低噪声和振动的发生的液化防止方法,并且可以在考虑pH环境的同时将其应用于具有大的细粒级分含量的路基。解决方案:在本发明的液化 预防方法:首先,将套管2垂直向下压入作为液化防止对象的路基1,以形成孔套3,其中孔壁5被套管2保护(步骤101 ); 接着,将填料4装入套管2的内部空间(步骤102)。 接下来,通过供给到套管2的空气的压力推压填料4,将套管2向上抽出与填充物的填充量对应的量(步骤103)。 然后,重复执行步骤102至103,直到填料4布置成例如在从钻孔3的底表面到地下水位的深度范围内的绒头形状(步骤104)。
    • 4. 发明专利
    • Groove excavating method
    • 挖掘方法
    • JP2013091918A
    • 2013-05-16
    • JP2011232980
    • 2011-10-24
    • Ohbayashi Corp株式会社大林組
    • KANAI MAKOTOFUKUMOTO KATSUJIMATSUMOTO SHINSHIMADA YOICHITERUI TAICHIHARADA FUMITAKA
    • E02D17/08
    • PROBLEM TO BE SOLVED: To provide a groove excavation method to easily install underground pipes.SOLUTION: An excavation step is performed for a whole object area and an excavated ditch 5 over the whole object area is formed. After a guide member setting step is performed for the excavated ditch 5, an earth retaining panel installation step and a guide member slide step are repeatedly performed. Alternatively, the object area is divided into a plurality of segments, and the excavation step is performed for the first segment to form the excavated ditch 5. After the guide member setting step is performed for the excavated ditch 5, the earth retaining panel installation step is performed and also the excavation step is performed for each of the segments thereafter to form the excavated ditch 5. The guide member setting step and the earth retaining panel installation step are repeatedly performed for the excavated ditch 5.
    • 要解决的问题:为了提供一种容易安装地下管道的槽挖掘方法。 解决方案:对整个物体区域进行挖掘步骤,形成整个物体区域上的挖沟5。 在对挖掘沟5进行引导构件设置步骤之后,重复地进行接地保持面板安装步骤和引导构件滑动台阶。 或者,将物体区域分割为多个区段,对第一区段进行挖掘工序,形成挖掘沟槽5.在对挖掘沟槽5进行引导构件设定工序之后,土挡板安装工序 并且对其后的每个段执行挖掘步骤,以形成挖掘沟槽5.对于挖掘的沟槽5重复执行引导构件设置步骤和接地保持面板安装步骤。版权所有:(C )2013,JPO&INPIT
    • 7. 发明专利
    • Earth retaining wall structure and method for constructing the same
    • 地板保持墙结构及其构造方法
    • JP2010229626A
    • 2010-10-14
    • JP2009074984
    • 2009-03-25
    • Ohbayashi Corp株式会社大林組
    • KANAI MAKOTOMATSUMOTO SHINMAEDA TOMONARIITO FUJIOSHIMADA YOICHI
    • E02D5/20
    • PROBLEM TO BE SOLVED: To provide an earth retaining wall structure capable of supporting itself without being provided with a strut support.
      SOLUTION: This earth retaining wall structure 10 includes an earth retaining wall 20, the lower portion of which is inclined in such a manner as to advance toward an excavation space 1, and a buttress 30 which is provided in such a manner as to cross the earth retaining wall 20. H-shaped steel 32 embedded in the buttress 30 is connected to H-shaped steel 22A embedded in the earth retaining wall 20, by means of connecting members 40 and 41. Since the earth retaining wall 20 is inclined, the volume of sediment between an surface of active slip rupture and the earth retaining wall 20 is reduced; the earth pressure acting on the earth retaining wall 20 is reduced; and the buttress 30 resists the earth pressure, which is transferred to the buttress 30 by the connecting members 40 and 41, by a force of friction against surrounding ground. This enables the earth retaining wall 20 to support itself.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:提供一种能够支撑自身而不设置支柱支撑的挡土墙结构。 解决方案:该挡土墙结构10包括:土体保持壁20,其下部以向挖掘空间1前进的方式倾斜;以及支撑件30,其以如 通过连接构件40和41将嵌入在支撑件30中的H形钢32连接到嵌入在挡土墙20中的H形钢22A。由于挡土墙20是 倾斜,活动滑动破裂表面与挡土墙20之间的沉积物体积减小; 作用在挡土墙20上的土压力减小; 支撑件30通过连接构件40和41通过与周围地面的摩擦力抵抗土压力,该压力传递到支撑件30。 这使得挡土墙20能够自身支撑。 版权所有(C)2011,JPO&INPIT
    • 9. 发明专利
    • Implement for stacking segment, and method for installing the segment
    • 堆叠分段的实现以及安装分段的方法
    • JP2010189936A
    • 2010-09-02
    • JP2009035703
    • 2009-02-18
    • Ohbayashi Corp株式会社大林組
    • YASHIRO TSUTOMUMIKI KEIZOKANAI MAKOTOHISADA HIDETAKASHIMAMURA TAKAO
    • E21D11/40
    • PROBLEM TO BE SOLVED: To provide a stacking implement which enables segments to be temporarily placed in the state of being stacked in a large number of tiers without being deformed or broken, and a method for installing the segments by using the stacking implement.
      SOLUTION: The stacking implement 3 includes a first supporting member 4 which is installed between a ground surface and the lowermost segment 1, and second supporting members 5 which are installed among the plurality of vertically-stacked segments 1, respectively. In the first supporting member 4, a plurality of first rod-like members 4a are laterally juxtaposed, and connected together by means of a connecting member 4b. In the second supporting member 5, a plurality of second rod-like members 5a are laterally juxtaposed, and connected together by means of a connecting material 5b. The second rod-like member 5a is installed in a position almost immediately above the first rod-like members 4a, between the vertically-stacked segments 1.
      COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:提供一种堆叠工具,其使得能够将段暂时放置在层叠状态下而不变形或破裂,并且使用堆叠工具安装段的方法 。 解决方案:堆叠装置3包括安装在地面和最下段1之间的第一支撑构件4和分别安装在多个垂直堆叠段1之间的第二支撑构件5。 在第一支撑构件4中,多个第一杆状构件4a横向并置,并通过连接构件4b连接在一起。 在第二支撑构件5中,多个第二杆状构件5a横向并置,并通过连接材料5b连接在一起。 第二杆状构件5a安装在垂直堆叠的段1之间的第一杆状构件4a的正上方的位置。版权所有(C)2010,JPO&INPIT