会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 7. 发明专利
    • Tunnel excavator
    • 隧道挖掘机
    • JP2008106454A
    • 2008-05-08
    • JP2006287838
    • 2006-10-23
    • Kumagai Gumi Co LtdMitsubishi Heavy Industries Tunneling Machinery & Geotechnology Co Ltd三菱重工地中建機株式会社株式会社熊谷組
    • NISHIMURA KIYOAKIOKADA TAKASHIHIROSE TOSHIBUMIKAWAGOE MASARUHOKARI MINORUTAKAHASHI YOSHIYUKISUGIYAMA MASAHIKO
    • E21D9/06
    • PROBLEM TO BE SOLVED: To solve a problem wherein a tunnel excavator cannot be advanced due to a drum cylinder being pressed by the pressure of the natural ground in a conventional tunnel excavator because the internal wall surface of a tunnel void part formed around the drum cylinder located in front of a spray nozzle is in an unsupported excavated state not supported by a timbering layer.
      SOLUTION: The tunnel excavator 1 comprises the drum cylinder 2, a cutter head 3 provided on the front side of the drum cylinder 2 and a jack 5 provided on the rear side of the drum cylinder 2, and excavates the natural ground 44 with the cutter head 3 by rotationally driving the cutter head 3 while advancing by the drive of the jack 5, wherein the spray nozzle 32 for spraying a timbering material 6 to the internal wall surface 42 of the tunnel void part 41 formed between the rear end 10 of a peripheral edge part 9 of the cutter head 3 and the front end 12 of a peripheral edge part 11 of the drum cylinder 2, is provided at a rear face 26 of the cutter head 3 which is a rotating part, or provided at a rotation body 17A rotated together with the cutter head 3.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 解决的问题:为了解决由于在现有的隧道式挖掘机中由于鼓筒被天然地面的压力而被压制的隧道式挖掘机不能提前的问题,因为隧道式空心部分的内壁面形成在 位于喷嘴前面的鼓筒处于未被木材层支撑的未支撑的挖掘状态。 解决方案:隧道式挖掘机1包括鼓筒2,设置在鼓筒2的前侧的切割头3和设置在鼓筒2的后侧的千斤顶5,并且挖掘天然地面44 通过旋转驱动刀头3,同时通过千斤顶5的驱动推进切割头3,其中喷射喷嘴32用于将木材6喷射到形成在后端的隧道空隙部分41的内壁表面42之间 刀头3的周边部分9的10和鼓筒2的周边部分11的前端12设置在作为旋转部分的切割头3的后表面26上,或者设置在 旋转体17A与刀头3一起旋转。版权所有(C)2008,JPO&INPIT
    • 8. 发明专利
    • Natural ground reinforcing method
    • 自然地基加固方法
    • JP2006176999A
    • 2006-07-06
    • JP2004370107
    • 2004-12-21
    • Kumagai Gumi Co Ltd株式会社熊谷組
    • IWANAGA SHIGEJIHARA MORIYAINADA MASAKIOKADA TAKASHINISHIMURA KIYOAKI
    • E21D9/04E21D20/00
    • PROBLEM TO BE SOLVED: To provide a method capable of surely reinforcing natural ground by accurately driving a long-sized steel pipe.
      SOLUTION: Before driving the long-sized steel pipe 12, after driving a resin guide pipe 11 such as a vinyl chloride pipe having a diameter larger than a diameter of the steel pipe 12 in a cutting face surface of the natural ground 50, the steel pipe 12 is inserted into the guide pipe 11, and while drilling a hole in the natural ground 50 in front of a cutting face, the steel pipe 12 is driven in the natural ground 50. A push-cutting hole-drilling dummy pipe 16 is connected to a rear end part of the steel pipe 12, and the rear end part of the steel pipe 12 is driven up to coming to the vicinity of a tip part of the guide pipe 11. Before injecting a ground solidifying agent, an injection double packer 30 is inserted into the steel pipe 12, and the ground solidifying agent is injected. After blocking up clearance between the steel pipe 12 and the guide pipe 11 in advance by injecting the ground solidifying agent into the clearance between the steel pipe 12 and the guide pipe 11, the surrounding natural ground 50 is reinforced.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种能够通过精确地驱动长型钢管来确实地增强自然地面的方法。 解决方案:在驱动长型钢管12之前,在自然地面50的切割面中驱动直径大于钢管12的直径的氯乙烯管的树脂导管11 将钢管12插入导管11中,在切割面前方的自然地面50中钻孔,在自然地面50中驱动钢管12.推切钻孔假人 管16连接到钢管12的后端部,钢管12的后端部被驱动到引导管11的前端附近。在注入地面凝固剂之前, 将注射式双重封隔器30插入到钢管12中,并注入地面固化剂。 通过将地面固化剂注入到钢管12和导管11之间的间隙中,预先将钢管12和导管11间隙封闭,从而加强周围的自然地面50。 版权所有(C)2006,JPO&NCIPI
    • 9. 发明专利
    • Long-sized forepoling construction method
    • 长尺寸施工方法
    • JP2006176988A
    • 2006-07-06
    • JP2004369742
    • 2004-12-21
    • Kumagai Gumi Co Ltd株式会社熊谷組
    • IWANAGA SHIGEJIHARA MORIYAINADA MASAKIOKADA TAKASHINISHIMURA KIYOAKI
    • E21D9/04
    • PROBLEM TO BE SOLVED: To provide a long-sized forepoling construction method capable of accurately driving a long-sized steel pipe without using a large excavator.
      SOLUTION: Before driving the long-sized steel pipe 12, after driving a resin guide pipe 11 such as a vinyl chloride pipe having a diameter larger than a diameter of the long-sized steel pipe 12 in a cutting face surface of the natural ground 50, the steel pipe 12 is inserted into this guide pipe 11, and while drilling a hole in the natural ground 50 in front of a cutting face, the steel pipe 12 is driven in the natural ground 50. A push-cutting hole-drilling dummy pipe 16 is also connected to a rear end part of the steel pipe 12, and after driving the rear end part of the steel pipe 12 until coming to the vicinity of a tip part of the guide pipe 11, an injection double packer 30 is inserted into the steel pipe 12, and a ground solidifying agent is injected, and the surrounding natural ground 50 of the steel pipe 12 is reinforced.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种能够在不使用大型挖掘机的情况下精确地驱动长型钢管的长尺寸前倾施工方法。 解决方案:在驱动长型钢管12之前,在直径大于长型钢管12的直径的氯乙烯管的树脂引导管11在切割面 自然地50,将钢管12插入该导管11中,在切割面前方的自然地面50中钻孔,在自然地面50中驱动钢管12.推动切割孔 钻探虚拟管16也连接到钢管12的后端部分,并且在驱动钢管12的后端部分直到到达导管11的末端部分附近之前,注射双重封隔器 30插入到钢管12中,并且注入地面固化剂,并且钢管12的周围的自然地面50被加强。 版权所有(C)2006,JPO&NCIPI
    • 10. 发明专利
    • Infilling method for mold
    • 用于模具的填充方法
    • JP2006152661A
    • 2006-06-15
    • JP2004344116
    • 2004-11-29
    • Kumagai Gumi Co Ltd株式会社熊谷組
    • ISHIGUCHI MASAMITSUYOKOZUKA SUSUMUOKADA TAKASHI
    • E02D17/20
    • PROBLEM TO BE SOLVED: To facilitate the infilling work of a mold, which is performed as part of the greening of a slope.
      SOLUTION: This infilling method for the mold is practiced for the greening of the slope (10) where the mold (12) is installed. The infilling method comprises a step of installing a partition plate assembly (16), supported by the mold, in the square (14) of the mold (12), and of infilling a space, partitioned by the partition plate assembly, with a filler (18). The filler can be composed of a mixture including soil and wood.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了促进作为坡度绿化的一部分而进行的模具的填充工作。 解决方案:对于模具(12)安装的斜坡(10)进行绿化,实施模具的这种填充方法。 填充方法包括将由模具支撑的分隔板组件(16)安装在模具(12)的正方形(14)中并将由分隔板组件分隔的空间填充到填充物 (18)。 填料可以由包括土壤和木材的混合物组成。 版权所有(C)2006,JPO&NCIPI