会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明专利
    • DETECTING METHOD FOR CONFIGURATION
    • JPS57108603A
    • 1982-07-06
    • JP18475680
    • 1980-12-25
    • KAWASAKI STEEL COHITACHI LTD
    • HIRASAKI SHIYUUICHIHIROHATA KAZUHIROSAMEJIMA ICHIROUITOU SUSUMUWAKAMATSU YUTAKA
    • G01L5/04B21C51/00G01B7/00G01B7/04G01B7/28G01B21/06G01B21/20
    • PURPOSE:To reliably determine the degree of configuration defect, by a method wherein configuration is evaluated by employing a detected stress signal as it is or an absolute stress obtained by correcting the detected stress signal by an overall tension according to whether the variation of a gap signal is below or above a given value. CONSTITUTION:An excitation coil 14 and detection coils 20, 22 are disposed along the moving direction of a belt-shaped magnetic substance 18 moving at high speed in order to measure the stress applied to the belt-shaped magnetic substance 18 by utilizing magnetostriction effect. In addition, the stress distribution in the width direction of the belt-shaped magnetic substance 18 is made known by detecting the gap between the detector and the belt-shaped magnetic substance 18, and the configuration of the belt- shaped magnetic substance 18 is evaluated from the stress distribution. When the variation of the gap signal is below a given value, i.e., in a state where configuration is latent, the configuration is latent, the configuration is evaluated by employing the detected stress signal as it is. On the other hand, when the vairation of the gap signal is above the given value, i.e., in a state where the configuration is actualized, the configuration is evaluated by employing an absolute stress obtained by correcting the detected stress signal by an overall tension.
    • 5. 发明专利
    • SHAPE DETECTION
    • JPS56104209A
    • 1981-08-19
    • JP577280
    • 1980-01-23
    • KAWASAKI STEEL COHITACHI LTD
    • HIROHATA KAZUHIROHIRASAKI SHIYUUICHIWAKAMATSU YUTAKANAKASHIMA MASAAKI
    • G01L5/04G01B7/00G01B7/04G01B7/28G01B21/20
    • PURPOSE:To compensate a detection error for making precise detection by a precess wherein from the maximum value of the output signals of a shape detection cell set up in the direction of the width of rolled material each output signal is subtracted to detect the shape in the direction of the width using the value gained by the division of said value by the minimum value. CONSTITUTION:The lengthwise voltage signals VR1-VR3 and the transverse voltage signals Vr1-Vr3 of the rolled material gained by the each shape detection cells 21-23 are subtracted by the subtractors to gain the signal corresponding to the tention value sigmai. The maximum signal gained by the selector 34 is given to the subtractor, each tention signal is subtracted and the signal corresponding to the tention fluctuation quantity DELTAsigmai are given to the dividors 38-40. On the other hand the minimum value signal of the minimum value selector 41 is put into the dividers 38-40 to divide DELTAsigmai by said minimum value and the output thereof is given to the shape arithmetic unit 42 to detect the traverse shape of the rolled material. Accordingly the detection error is compensated to make it possible to perform detection with high precision.
    • 6. 发明专利
    • DETECTION OF TENSION AND SHAPE
    • JPS55116214A
    • 1980-09-06
    • JP2347579
    • 1979-03-02
    • KAWASAKI STEEL COHITACHI LTD
    • HIRASAKI SHIYUUICHIHIROHATA KAZUHIROWAKAMATSU YUTAKANAKASHIMA MASAAKI
    • G01L5/04G01B21/20G01B21/30G01L5/10
    • PURPOSE:To detect tension and shape simultaneously with a simple constitution by a method wherein the plural number of shape detector heads are arranged in the direction of the width of a plate in order to obtain unit tension at each point, and the data obtained are processed by arithmetic operation. CONSTITUTION:A tension signal and a plate width signal are input to an impedance selector 10 from each head, then an instruction is given to a function generator 20 so that it is to select the corresponding impedance, and a select completion signal Q is sent to a sampling dispatcher 70. If the dispatcher send a generation command to a lump generator and at the same time an integration commencement command P to a integrator 40, the functin generator 20, after receiving the output from the generator 30, send the corresponding output to the integrator 40 along the direction of an approximate function in terms of the width. Since time for integration corresponds to the plate width direction, a sample holding circuit 50 holds the sample according to a sampling command S simultaneously with the completion of integration time. A multiplier 60 outputs the total tension by multiplying the thickness of the plate. Therefore, tension and the shape are detected at the same time.
    • 7. 发明专利
    • SPLITTING METHOD OF WOUND STEEL BELT IN CONTINUOUS INSPECTION LINE OF STEEL BELT
    • JPS6056817A
    • 1985-04-02
    • JP16470183
    • 1983-09-06
    • KAWASAKI STEEL CO
    • FUJII SHINGOHIRASAKI SHIYUUICHIKIHATA ASAHARU
    • B21C47/26B21C51/00B23D36/00
    • PURPOSE:To obtain an optimum split of a wound steel belt by putting a split-slated point when the defective length occurring in the inspection line exceeds a specified value, cutting the belt here if the succeeding belt is satisfactory, and changing the slated point if unsatisfactory when the slated point reaches the front of a shearing machine. CONSTITUTION:When a defect occurs during the inspection of a wound steel belt and the defective length XF exceeds the mixing-allowable defective length alpha, a split-slated mark is once put at the split-slated point A being out of a standard to make the slated point A a temporary split point, and when the point A reaches the direct front of a shearing machine, whether the surface characteristic of the wound steel belt is satisfactory or unsatisfactory in the succeeding detectable range LK is judged, and if satisfactory, the belt is sheared at the point A, this portion is wound as an unsatisfactory coil, and the portion subsequent to the point A is wound as a product coil. If the portion subsequent to the point A is out of a standard the split mark at the point A is canceled and is changed to a point B. This operation is repeated to wind the wound steel belt as the product coil as much as possible, and if a defect occurs, the defective coil can be wound in large coil unit weight to the utmost.