    • Reinforcing construction method of pier and its reinforcing device
    • 夯实施工方法及其加固装置
    • JP2006200174A
    • 2006-08-03
    • JP2005011383
    • 2005-01-19
    • Tekken Constr Co Ltd鉄建建設株式会社
    • SAITO MASAHARUCHIJIIWA MITSUOSUZUKI TADAOTAKENAKA SADAFUMINAKAMURA SEIJI
    • E01D19/02E01D22/00
    • PROBLEM TO BE SOLVED: To provide a reinforcing construction method of a pier, and its reinforcing device, for shortening a construction period, reducing construction cost, and preventing surrounding environmental pollution, without requiring earth retaining work, temporary work such as a scaffold and large-scale excavation work, by realizing construction work in a narrow place where no heavy machinery can be used, suitable for aseismatic reinforcing work in the ground, for example, in a pier of an existing viaduct and a column of a building.
      SOLUTION: In this reinforcing construction method of the pier, a plurality of high pressure injection pipes 25 are arranged on a peripheral surface of a reinforcing frame 16 arranged by surrounding the column 3 such as the pier; the reinforcing frame 16 is supported toward the ground 31; a high pressure fluid is injected into the ground 31 from the high pressure injection pipes 25; the ground 31 is loosened; the reinforcing frame 16 is settled by vibrating; and the reinforcing frame 16 is installed on a peripheral surface of the column 3 such as the pier in the ground. A press-in jacking device 4 having pressing means 9 and 10 is installed on the peripheral surface of the column 3 such as the pier on the ground. The pressing means 9 and 10 are engaged with the just under reinforcing frame 16, and the reinforcing frame 16 is pushed down.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种码头的加固施工方法及其加固装置,用于缩短施工期间,降低施工成本,防止周围环境污染,而不需要土方工程,临时作业如 脚手架和大型挖掘工作,通过在狭窄的地方实现建筑工程,不用重型机械,适合在地面上进行抗震加固,例如现有高架桥和建筑物柱的码头。 解决方案:在这种墩的加固施工方法中,多个高压喷射管25布置在加强框架16的周围表面上,该加强框架16围绕诸如墩的柱3布置; 加强框架16被支撑到地面31; 从高压喷射管25将高压流体注入到地面31中; 地面31松动; 加强框架16通过振动来固定; 并且加强框架16安装在诸如地面中的码头的柱3的外周表面上。 具有按压装置9和10的压入式顶起装置4安装在诸如地面上的码头的柱3的周面上。 按压装置9和10与正下方的加强框架16接合,并且加强框架16被向下推。 版权所有(C)2006,JPO&NCIPI
    • 7. 发明专利
    • Structure of tunnel, and construction method for tunnel
    • 隧道结构及隧道施工方法
    • JP2005036435A
    • 2005-02-10
    • JP2003198218
    • 2003-07-17
    • Kajima CorpKomatsu Im Engineering KkKomatsu LtdTekken Constr Co Ltdコマツアイエムエンジニアリング株式会社株式会社小松製作所鉄建建設株式会社鹿島建設株式会社
    • NAGAOKA TAKASHIKASUYA TAROSAITO MASAHARUTAKAMURA KEIICHIHAYAKAWA YASUYUKIYOSHIKAWA TADASHIKATO MAKOTOKODAIRA SADATADAYAMAMOTO YOSHIHISATAKEUCHI TAKU
    • E21D9/04E21D13/02
    • PROBLEM TO BE SOLVED: To provide a structure of a tunnel, and a construction method for the tunnel, which are suitable, for example, for construction of a ramp section of a road tunnel with a large cross section at a great depth, which dispense with soil improvement and various reinforcing construction methods to the utmost, which enable safe, rational and efficient construction, which enable a reduction in construction period and construction cost, which can be applied to either of a shield tunnel and a mountain tunnel, and which enable a road etc. to be rationally joined into one, branched or made wider. SOLUTION: A plurality of bent pipe-shaped buried pipes 17-19 are arranged in such a manner as to cross the longitudinal direction of the tunnel 1. Lining walls 23-25 are formed along the buried pipes 17-19. Both ends of the buried pipes 17-19 and both ends of the lining walls 23-25 are supported by both side sections of the tunnel 1. The tunnel 1 is provided in such a manner as to be capable of communicating with a main line tunnel 3 whereon a main line structure 6 is laid, and a branch line tunnel 4 whereon a branch line structure 8 is laid. The structure 6 and a separation/joining area 35, which can be separated from the structure 6 into the structure 8 or which can be joined to the structure 6 from the structure 8, are provided in the tunnel 1. COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:为了提供隧道的结构和隧道的施工方法,其适合于例如在大深度处构造具有大横截面的道路隧道的坡道部分 最大限度地省去了土壤改良和各种加固施工方式,使施工安全,合理,高效,可以减少施工期和施工成本,适用于盾构隧道和山隧道, 使道路等合理加入到一个,分支或更广泛。 解决方案:多个弯管管状埋管17-19以与隧道1的纵向相交的方式布置。衬里壁23-25沿着埋管17-19形成。 埋管17-19的两端和衬壁23-25的两端由隧道1的两侧部分支撑。隧道1设置成能够与主线隧道 在图3中,布置了主线结构6,并且布置了分支线结构8的分支线隧道4。 隧道1中设置有结构6和分离/接合区域35,其可以从结构6分离成结构8或者可以从结构8与结构6相连接。版权所有: C)2005,JPO&NCIPI
    • 10. 发明专利
    • Shield method by direct placing concrete lining
    • 通过直接放置混凝土内衬的屏蔽方法
    • JP2009144425A
    • 2009-07-02
    • JP2007323207
    • 2007-12-14
    • Tekken Constr Co Ltd鉄建建設株式会社
    • KIKUCHI MAKOTOSAITO MASAHARUMATSUOKA SHIGERUTAKAMURA KEIICHIHATAO KOJICHIJIIWA MITSUO
    • E21D11/10
    • PROBLEM TO BE SOLVED: To provide a shield method by a direct placing concrete lining which prevents concrete from adhereing to an end frame, suppresses the occurence of trouble when placing the concrete and accordingly achieves the quality improvement of the lining concrete, the improvement of construction speed, and the reduction of construction cost. SOLUTION: In the shield method by the direct placing concrete lining, a new inner form 5a continuous with existing inner forms 5b is assembled into a ring to allow the end form 8 at the inner circumference of a tail part 6 to be slidable thereon inside the tail part 6 of a shield machine, the concrete is placed between the inner form 5 and a natural ground E at the rear of the end frame while propelling the shield machine by reaction force from the inner form 5, and the placing concrete is always pressurized with a predetermined pressure by the end form 8, and further a plurality of concrete placing openings 13 along a tunnel circumferential direction are arranged in the inner form 5 and the concrete is placed through the concrete placing openings 13. COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:为了提供一种通过直接放置混凝土衬里的防护方法,防止混凝土粘附到端框上,抑制在放置混凝土时发生麻烦,从而实现衬里混凝土的质量改进, 提高施工速度,降低施工成本。 解决方案:在通过直接放置混凝土衬里的屏蔽方法中,将与现有内部形式5b连续的新的内部形式5a组装成环以允许尾部6的内圆周处的端部形状8能够滑动 在屏蔽机器的尾部6内部,混凝土被放置在内部构件5和端部框架后部的自然地面E之间,同时通过来自内部构件5的反作用力推进屏蔽机构,并且将混凝土 总是通过端部形式8以预定压力加压,并且沿着隧道周向方向进一步设置多个混凝土浇筑开口13,并且混凝土通过混凝土浇筑孔13放置。 (C)2009,JPO&INPIT