会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明专利
    • Prestressed concrete structure
    • 预期的混凝土结构
    • JP2005336748A
    • 2005-12-08
    • JP2004154243
    • 2004-05-25
    • Nihon Samicon Co LtdNippon Concrete Ind Co Ltd日本コンクリート工業株式会社日本サミコン株式会社
    • TSUCHIDA SHINJISETA HIDEHIKOITO YASUHIROWATANABE YASUOONDA SUSUMU
    • E02D5/12E02D5/10
    • PROBLEM TO BE SOLVED: To provide a prestressed concrete structure securing sufficient connection strength with a frame material with a simple structure.
      SOLUTION: Two anchor plates 24 for inserting a PC steel material are respectively arranged in a midway part in the shaft direction in a concrete molding part 21 for arranging the PC steel material in the shaft direction in a state of crossing in the shaft direction. Mutual four-corner parts of the two anchor plates 24 are mutually connected in the concrete molding part 21 by four connecting bolts 25. A plurality of anchor steel materials 27 and 28 are projected in the shaft direction from the respective anchor plates 24 in the concrete molding part 21. A frame material connecting embedded plate 29 embedded in a side surface of the concrete molding part 21 in an exposed state, is respectively and integrally arranged on the respective anchor plates 24.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种用简单的结构确保与框架材料的足够的连接强度的预应力混凝土结构。 解决方案:用于插入PC钢材料的两个锚固板24分别在混凝土模制部分21中沿轴向的中间部分布置,用于在轴向上布置PC钢材料在轴向上交叉的状态 方向。 两个锚板24的相互四角部分通过四个连接螺栓25在混凝土模制部分21中相互连接。多个锚固钢材27和28从混凝土中的相应锚固板24沿轴向突出 将嵌入在混凝土模制部件21的侧表面中的嵌入板29以暴露状态连接的框架材料分别一体地布置在相应的锚板24上。(C)2006年,JPO&NCIPI
    • 4. 发明专利
    • Precast concrete pile member and foundation structure for building
    • 预制混凝土构件和建筑基础结构
    • JP2005299291A
    • 2005-10-27
    • JP2004119597
    • 2004-04-14
    • Nippon Concrete Ind Co LtdOkumura Corp日本コンクリート工業株式会社株式会社奥村組
    • TAKEDA AKIFUMIYAMADA TAKAYUKIFUNAKI HIDETAKATANAKA KATSUYATSUCHIDA SHINJIHIRAKAWA YASUYUKI
    • E02D5/58E02D27/00E02D27/12E02D27/34E04B1/30E04C3/34
    • PROBLEM TO BE SOLVED: To provide a precast concrete pile member and a foundation structure for a building constructed by using the precast concrete member capable of preventing any rupture at a joint between an end metal, to which a PC steel member of a precast concrete pile is anchored, and a steel pipe jointed to the end metal thereby enhancing the original bearing capacity of the precast concrete pile.
      SOLUTION: A precast concrete pile member 1 has a steel pipe 6 in which filling concrete C is placed to make the structure integrated with a column 5, and these are made at the pile head portion of a precast concrete pile 2 and connected to an end metal 4 as an anchoring portion for a PC steel member 3 embedded in the precast concrete pile 2; and an external diameter d of the steel pipe 6 is made smaller than an external diameter D of the precast concrete pile 2, and a joining position X with the end metal 4 is set at the outer side of a fixing position Y of the PC steel member 3.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种通过使用预制混凝土构件构造的建筑物的预制混凝土桩构件和基础结构,所述预制混凝土构件能够防止在端部金属之间的接头处的任何破裂, 锚固预制混凝土桩,将钢管连接到端部金属,从而提高预制混凝土桩的原始承载力。 解决方案:预制混凝土桩构件1具有钢管6,其中填充混凝土C以使结构与柱5一体化,并将其制成在预制混凝土桩2的桩头部分并连接 作为嵌入在预制混凝土桩2中的PC钢构件3的锚固部的端部金属4; 使钢管6的外径d小于预制混凝土桩2的外径D,将端部金属4的接合位置X设定在PC钢的固定位置Y的外侧 (C)2006年,JPO&NCIPI
    • 6. 发明专利
    • Centrifugal reinforced concrete pile
    • 离心钢筋混凝土桩
    • JP2008106508A
    • 2008-05-08
    • JP2006289983
    • 2006-10-25
    • Nippon Concrete Ind Co Ltd日本コンクリート工業株式会社
    • TSUCHIDA SHINJIKODERA MITSURU
    • E02D5/48E02D5/24E02D5/44
    • PROBLEM TO BE SOLVED: To provide a centrifugal reinforced concrete pile, capable of solving problems in a conventional centrifugal prestressed concrete pile.
      SOLUTION: A consolidated foundation fixing nodular pile part 23 is formed, as an integrated unit, concentrically to a straight pile part 22 formed to have a constant outer diameter. The nodular pile part 23 includes a shaft part 24 and a nodular part 25 formed to be larger in diameter than the shaft part 24. The outer diameter of the straight pile part 22 is formed larger than the outer diameter of the shaft aprt 24 of the nodular pile part 23, and a differed diameter part forming ring plate 28 is provided at the boundary between a bore part 26 of the straight pile part 22 and a bore part 27 of the nodular pile part 23. The inside diameter of the straight pile part 22 is formed larger than the inside diameter of the nodular pile part 23 through the ring plate 28. A cage 23 of the straight pile part 22 is integrated with a cage 34 of the nodular pile part 23 through the ring plate 28.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种离心钢筋混凝土桩,能够解决传统的离心预应力混凝土桩的问题。 解决方案:将固结的基底固定结节部分23形成为与形成为具有恒定外径的直的绒头部分22同心的集成单元。 球状绒头部分23包括轴部分24和形成为直径大于轴部分24的节点部分25.直的绒头部分22的外径形成为大于直径部分22的轴部分24的外径 球形桩部分23和不同直径部分形成环形板28设置在直的桩部分22的孔部分26和结节部分部分23的孔部分27之间的边界处。直的桩部分的内径 22通过环形板28形成为大于球状绒头部分23的内径。直的绒头部分22的保持架23通过环形板28与结节绒毛部分23的保持架34一体化。 版权所有(C)2008,JPO&INPIT
    • 7. 发明专利
    • Prestressed concrete structure
    • 预期的混凝土结构
    • JP2009102981A
    • 2009-05-14
    • JP2009003156
    • 2009-01-09
    • Nihon Samicon Co LtdNippon Concrete Ind Co Ltd日本コンクリート工業株式会社日本サミコン株式会社
    • TSUCHIDA SHINJISETA HIDEHIKOITO YASUHIROWATANABE YASUOONDA SUSUMU
    • E02D5/30E02D5/10E02D5/20E02D27/00
    • PROBLEM TO BE SOLVED: To provide a prestressed concrete structure capable of securing sufficient connection strength with a frame material with a simple structure.
      SOLUTION: A PC wall body 11c as a prestressed concrete structure arranges a PC steel material 16 as a tensional material for the prestressed concrete in a shaft direction inside of a concrete forming part 21 formed in long-sized by a centrifugal force forming method. A square tube 51 for connecting with a frame material is embedded into box in an exposed state on the peripheral of the concrete forming part 21 in a midway part in the shaft direction of the concrete forming part 21. The square tube 51 is formed in a similar shape along with the peripheral of the concrete forming part 21 and has a concave groove 22a which is consecutively connected to a concave groove 22 of the concrete forming part 21.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种能够以简单结构与框架材料确保足够的连接强度的预应力混凝土结构。 解决方案:作为预应力混凝土结构的PC壁体11c将PC钢材16作为预应力混凝土的拉伸材料沿轴向布置在通过离心力形成的长尺寸形成的混凝土形成部21内部 方法。 在混凝土形成部21的轴方向的中途部分,在混凝土形成部21的外周处于暴露状态的框体内嵌入方管51,方管51形成为 与混凝土形成部21的周边相似的形状,并且具有连续地连接到混凝土形成部21的凹槽22的凹槽22a。(C)2009,JPO&INPIT