热词
    • 4. 发明专利
    • DATA COLLECTION SYSTEM
    • JPS60244132A
    • 1985-12-04
    • JP9875984
    • 1984-05-18
    • HITACHI LTD
    • HATA TOSHIOSUZUKI MASAYOSHI
    • H04Q9/00
    • PURPOSE:To collect data effectively for a desired slave station device by selecting the data collecting cycle which is started by a telemeter device as well as the slave station device based on the part achievements. CONSTITUTION:A data processor 3 calculates the changing factor between a reception data input signal A supplied from a telemeter device 2 and the data collected and recorded in a preceding cycle and compares this changing factor with that set previously. When the changing factor calculated by the processor 3 exceeds a prescribed level, a call cycle switching signal B which changes the data collection cycle according to said changing factor is outputted to the device 2 from the processor 3 together with a slave station designating call signal C which starts a specific slave station device 1. Then the device 1 is started based on the data collection cycle of a slave station call control part 10 of the device 2 and the number of the device 1. The device 1 sends the measured 4 data to the device 2 if its own station is started.
    • 5. 发明专利
    • GATE OPENING DATA CHECK METHOD
    • JPS5544602A
    • 1980-03-29
    • JP11663078
    • 1978-09-25
    • HITACHI LTD
    • ONODERA YASUJISHINOMIYA FUMITOKUBOTA SATORUHATA TOSHIO
    • E02B7/20G05B23/02G05D9/12
    • PURPOSE:To prevent the malfunction of the dam control system by giving the periodical check to the gate opening and then locking the gate control part in case the variation amount of the gate opening exceeds continuously and twice the set value. CONSTITUTION:Outflow amount calculation part 4 calculates the outflow amount based on the gate opening and the data given from water level indicator 2; inflow amount calculation part 5 calculates the inflow amount based on the outflow amount and the water level change; and target discharge amount calculation part 6 calculates the target discharge amount based on the target water level and the inflow amount respectively. Based on the target discharge amount, the target opening of the gate is calculated at gate opening calculation part 7. Then gate 23 is operated via gate operation command part 8 and gate control unit 9. In such system of the fault detection, the output of gate opening meter 1 is sent to opening data comparison calculation part 3. And in case the opening deviation to the previous value exceeds continuously and twice the set value, alarm transmission device 11 displays the fault. At the same time, gate 23 is locked via gate control lock part 10.
    • 6. 发明专利
    • Method and system for closing gate when alarm against tidal wave and/or high tide is given
    • 当发生潮汐和/或高潮的报警发生时关闭门的方法和系统
    • JP2003278122A
    • 2003-10-02
    • JP2002079919
    • 2002-03-22
    • Hitachi Ltd株式会社日立製作所
    • OZAWA HIDEOTERATANI TADAOADACHI HIROSHIHATA TOSHIOSHOJIMA HIROSHI
    • E02B3/00G08B21/10G08B25/00G08B25/04
    • Y02A10/41
    • PROBLEM TO BE SOLVED: To provide a system capable of securely closing a gate of the whole object region even if the number of collected operators is insufficient when tidal wave and high tide occur. SOLUTION: A camera 4 for monitoring the surroundings on a sea side, a gate door monitoring device 5, an alarm device 6, a gate driving device 7, a water level gage 8, electronic equipment on an operation table 9, and a recorder 10 are connected with a gate controller 1 by a communication means. The gate door monitoring device 5 is provided with an image distribution device 11 and an image processing device 12. Furthermore, the image distribution device 11 is connected with a monitoring camera 13 provided per gate. In the gate door monitoring device 5, the image distribution device 11 is linked to the gate controller 1 through the image processing device 12. A motor 20 and a limit switch 21 are linked to the gate driving device 7. At least the monitoring camera 13, an alarm, and the gate driving device 7 are provided per gate. An operation table pressing and dividing device 22 is provided in a central controller 2 in a central control part B and is further connected with a remote monitoring part 24 and a tidal wave and high tide alarm system 25. COPYRIGHT: (C)2004,JPO
    • 要解决的问题:即使在发生潮汐和高潮时收集的操作员的数量不足,也能够提供能够可靠地关闭整个物体区域的门的系统。 解决方案:用于监测海侧环境的摄像机4,门监视装置5,报警装置6,门驱动装置7,水位计8,操作台9上的电子设备,以及 记录器10通过通信装置与门控制器1连接。 门门监视装置5设置有图像分配装置11和图像处理装置12.此外,图像分配装置11与每个门设置的监视摄像机13连接。 在门门监视装置5中,图像分配装置11通过图像处理装置12连接到门控制器1.电动机20和限位开关21连接到门驱动装置7.至少监视摄像机13 ,报警器,门闸驱动装置7。 操作台按压分割装置22设置在中央控制部B的中央控制器2中,并与远程监视部24和潮汐和潮汐报警系统25进一步连接。(C) 2004年,JPO
    • 9. 发明专利
    • GATE CONTROLLER
    • JPH10143203A
    • 1998-05-29
    • JP30004496
    • 1996-11-12
    • HITACHI LTDHITACHI INF & CONTROL SYST
    • MOCHIZUKI KENTAROSAITO TERUAKISUGANO HIROSHIHATA TOSHIO
    • E02B7/20G05B9/02
    • PROBLEM TO BE SOLVED: To improve the safety of gate control by providing an automatic control operation time limit timer and stopping control when the entire operation time exceeds an automatic control operation limit time. SOLUTION: A gate operation amount limit timer 104 inputs the open signals of a gate control part 103 and monitors the continuous operation time of the opening operation of a gate 105. When the continuous operation time exceeds an operation amount limit time, gate stopping signals are outputted to the gate control part 103 and an alarm is simultaneously outputted. The automatic control operation time limit timer 108 inputs control state monitoring signals from a controlled variable computing part 101 and an open degree control part 102, inputs the open signals from the gate control part 103, recognizes the state of automatic control by the signals and measures the entire operation time of the automatic control. Then, when the entire operation time reaches the automatic control excessive operation limit time, stopping signals are outputted to the gate control part 103 and the gate is stopped.
    • 10. 发明专利
    • JP2524633B2
    • 1996-08-14
    • JP31799388
    • 1988-12-16
    • HITACHI LTD
    • TSUTSUI KAZUOYODA MIKIOHATA TOSHIO
    • G06F17/30G05B23/02G06T1/00G06T11/60
    • PURPOSE:To easily decide the part of the equipment where the maintenance is required for an outworn pipeline, etc., by displaying the equipment diagnostic information on the pipelines, etc., shown on an equipment drawing in different patterns like the line types, the line widths, the colors, etc. CONSTITUTION:A cursor CU which moves in 1:1 with the operation of a mouse 207 is shifted to an icon area 102 of a display screen 101. Then an icon of 'drawing retrieval' is selected. The drawing retrieving jobs include the drawing No retrieval which designates directly the desired drawing No, the index retrieval which retrieves the desired drawing out of an index diagram showing the overall drawing position relation, the target retrieval which designates a target, the town name retrieval which designates a town name, etc. These different types of retrieval are properly used in accordance with each use. When this selection command is inputted to an operation input part 104 of a CPU 201, a graphic editing part 109 and a display editing part 111 edits the relevant drawing data in accordance with a drawing display area 103 and displayed on this area 103. Thus it is possible to easily select the equipments like the pipelines, etc., requiring the maintenance.